Wallace building permits
Department contacts, adopted codes, permit types, fees, and gotchas for Wallace, Idaho.
Last verified 2026-07-08 · Source · Embed this page’s badge · Version history
Building department
- Address
- 703 Cedar Street, Wallace, ID 83873
- Phone
- (208) 752-1147
- Office hours
- Mon–Fri 8:00 AM – 4:00 PM (closed holidays)
- Website
- Official site
Codes adopted
Idaho adopts a statewide baseline building code set under the Idaho Building Code Act (Idaho Code Title 39, Chapter 41) and IDAPA rules administered by the Idaho Division of Occupational and Professional Licenses (DOPL). Effective January 1, 2021, the statewide baseline includes the 2018 International Building Code (IBC), 2020 Idaho Residential Code (based on the 2018 IRC Parts I–III and IX with Idaho amendments), 2020 Idaho Energy Conservation Code (based on the 2018 IECC with Idaho amendments), 2018 International Existing Building Code (IEBC), 2018 International Mechanical Code (IMC), 2018 International Fuel Gas Code (IFGC), and 2018 International Fire Code (IFC). The National Electrical Code is adopted separately by the Idaho Electrical Board (IDAPA 24.39.10), not bundled with the building code: Idaho enforces the 2023 NEC, effective July 1, 2024 (the state used the 2017 NEC with amendments before that and skipped the 2020 edition). Local jurisdictions must enforce the state baseline and may adopt amendments only where those amendments are at least as stringent as the state-adopted editions; local amendments may not be less restrictive. Enforcement is local — each city or county issues permits and performs inspections. Always confirm the current adopted edition and any local amendments with your specific jurisdiction before submitting plans.
- International Building Code (IBC), 2018 Edition, as adopted by the State of Idaho / State Building Code Board, together with any State Building Code Board amendments — Wallace City Code § 153.001(A)(1)
- State Residential Code (based on the International Residential Code), 2020 Edition, as adopted by the State of Idaho / State Building Code Board — Wallace City Code § 153.001(A)(2)
- State Energy Conservation Code (based on the International Energy Conservation Code), 2020 Edition, as adopted by the State of Idaho / State Building Code Board — Wallace City Code § 153.001(A)(3)
- State Existing Building Code (based on the International Existing Building Code), 2018 Edition, as adopted by the State of Idaho / State Building Code Board — Wallace City Code § 153.001(A)(4)
- State Manufactured Home Installation Standard, as developed by the Idaho Division of Building Safety — Wallace City Code § 153.001(A)(5)
- American National Standard ICC/ANSI A117.1 (accessibility) — Wallace City Code § 153.001(A)(6)
- Uniform Code for Building Conservation (International Conference of Building Officials, latest edition), adopted specifically to regulate building and construction within the city's historical districts — Wallace City Code § 153.004
Permit types & fees
Residential Building Permit (New Construction / Addition / Alteration)
Required for new residential construction, additions, alterations, and remodels within the City of Wallace. Wallace administers its own building permits under Wallace City Code Chapter 153, adopting the state versions of the IBC, IRC-based Residential Code, IECC-based Energy Code, and IEBC-based Existing Building Code. Building official, plan review, and inspection services are provided under contract by the City of Kellogg's Building Official.
Certificate of Appropriateness (Historic Preservation)
Required before any exterior work — including new construction, demolition, reconstruction/remodeling/repair, exterior alteration, signage, or even tree removal — on any building, structure, or site feature within the Wallace Historic District, which encompasses the entire city since Wallace is fully listed on the National Register of Historic Places. Administered by the combined Wallace Planning & Zoning / Historic Preservation Commission under Wallace City Code Title XV, Chapter 155.
Solar PV Installation (Building Permit + Certificate of Appropriateness)
Wallace has no dedicated solar-PV application, no separate solar fee line, and no historic-district exemption for solar installations. Because the entire City of Wallace is a National Historic Landmark district, a rooftop or ground-mount solar PV system is exterior work and therefore requires a Certificate of Appropriateness from the Planning & Zoning/Historic Preservation Commission (Wallace City Code Title XV, Ch. 155) BEFORE the standard Building Permit (Wallace City Code Ch. 153) can be issued — the same two-step sequence used for any other exterior alteration in this city. Neither the Wallace City Code nor the city's published Certificate of Appropriateness materials carry any solar-specific carve-out, streamlined review, or fee. Electrical interconnection work is permitted and inspected by the State of Idaho (Division of Occupational and Professional Licenses/Division of Building Safety), not the city.
Electric Vehicle (EV) Charging Station / EVSE Permit (Certificate of Appropriateness + State Electrical Permit)
Wallace has no dedicated EV charger/EVSE permit application or fee line, and no historic-district exemption for EV charging equipment. Because the entire City of Wallace is a National Historic Landmark district, installation of an exterior-visible EV charging station (e.g., a wall-mounted charger, new conduit run, or exterior meter/panel work visible from a public right-of-way) is exterior work subject to the same Certificate of Appropriateness requirement (Wallace City Code Title XV, Ch. 155) that governs the city's solar-pv-permit entry, before any building permit can be issued for associated structural work. Electrical wiring/interconnection itself is permitted and inspected by the State of Idaho (Division of Occupational and Professional Licenses/Division of Building Safety), not the City of Wallace, consistent with how the city sources electrical work generally.
New residential construction activity
New privately-owned residential construction onlyHousing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).
- Latest month (2026-05)
- No data reported
- Trailing 12 months
- No data reported
- Year to date (2026 YTD)
- No data reported
- Full year 2025
- No data reported
Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-05 vintage. Census survey data — separate from the permit-requirements verification above. All Idaho building activity
Tips & gotchas
- Wallace contracts building inspection, plan review, and Building Official services to the City of Kellogg's Building Department (currently Keith Teeters, (208) 786-9131), the same official who also serves the Shoshone County cities of Pinehurst, Smelterville, Wardner, and Osburn. Despite this shared administration, Wallace remains its own legal jurisdiction — its own adopted code chapter (Wallace City Code Title XV, Ch. 153), its own locally amended snow-load/frost-depth/foundation standards, its own Historic Preservation ordinance (Ch. 155), and its own fee-setting authority via City Council resolution. Do not assume Wallace's fees match Kellogg's, Shoshone County's, or any of the other shared-official cities without confirming directly.
- The entire City of Wallace is a National Historic Landmark district (the only U.S. city entirely so listed) — nearly all exterior construction work requires a Certificate of Appropriateness from the combined Planning & Zoning/Historic Preservation Commission BEFORE a building permit will be issued. This is a genuinely distinct, city-specific permit step, not a formality.
- Building permit fees are set by City Council resolution (Wallace City Code § 153.001(E)) but are not published on wallace.id.gov as a fee schedule; confirm current fees directly with City Hall, (208) 752-1147. This mirrors the same finding already documented for Kellogg, the neighboring city that supplies Wallace's contracted building official — neither city publishes a fee schedule online.
- Electrical, plumbing, and mechanical work is state-administered in Wallace via the Idaho Division of Occupational and Professional Licenses / Division of Building Safety (1-800-955-3044, dbs.idaho.gov), not issued or inspected by the city — consistent with the rest of Shoshone County and with Boise's DOPL-for-plumbing pattern only insofar as trades separate from the local building department; Wallace has no locally issued electrical/plumbing/mechanical permits at all.
- Wallace's local building code amendments require an 80 psf ground snow load, 60 psf minimum roof design snow load, and 30-inch minimum frost depth — noticeably stricter than lower-elevation Idaho cities, reflecting Wallace's location in the Bitterroot Mountains (Silver Valley).
- A Certificate of Occupancy is required, in addition to any building permit, for all structures or modifications that will be occupied, per the city's own Certificate of Appropriateness application conditions.
- Idaho state law generally exempts homeowners performing work on their own primary residence from contractor-registration requirements (Idaho Code § 54-5205); the general county-level permit package documents this exemption process, and it is expected to apply equally within Wallace, though confirm directly with the contracted Building Official for city-specific paperwork.