Electric Vehicle (EV) Charging Station / EVSE Permit (Certificate of Appropriateness + State Electrical Permit) in Wallace, Idaho
Wallace has no dedicated EV charger/EVSE permit application or fee line, and no historic-district exemption for EV charging equipment. Because the entire City of Wallace is a National Historic Landmark district, installation of an exterior-visible EV charging station (e.g., a wall-mounted charger, new conduit run, or exterior meter/panel work visible from a public right-of-way) is exterior work subject to the same Certificate of Appropriateness requirement (Wallace City Code Title XV, Ch. 155) that governs the city's solar-pv-permit entry, before any building permit can be issued for associated structural work. Electrical wiring/interconnection itself is permitted and inspected by the State of Idaho (Division of Occupational and Professional Licenses/Division of Building Safety), not the City of Wallace, consistent with how the city sources electrical work generally.
Verified 2026-07-20 · Source
When you need this permit
- A Certificate of Appropriateness may be required BEFORE any associated building permit for exterior-visible EV charger installation work (wall-mounted unit, new exterior conduit, meter/panel changes visible from a public right-of-way) — Wallace City Code Title XV, Ch. 155; no EV-specific exemption or streamlined path was found in the ordinance or the city's published COA guidance
- Certificate of Appropriateness application must include a clear statement of proposed work (materials, colors, layout/mounting location), plans/elevations sufficient to describe the completed appearance, and a site plan — per Wallace City Code § 155.078(B)
- Ask the City Clerk whether an EV charger installation qualifies for the Historic Preservation Commission's 'pre-approved' minor-project list for immediate Certificate of Appropriateness approval, rather than waiting for the monthly hearing -- not confirmed either way for EV chargers specifically
- If any associated structural work is needed, a standard Building Permit application (Wallace City Code Ch. 153) is required after Certificate of Appropriateness approval, reviewed by the contracted City of Kellogg Building Official
- Electrical interconnection/wiring for the EVSE circuit is permitted and inspected by the State of Idaho (Division of Occupational and Professional Licenses, 1-800-955-3044), not the City of Wallace
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Electrical Rough-In / Final
Conducted under the State of Idaho's electrical inspection program (DOPL), not by the City of Wallace
Tips
- If your EV charger will be visible from a public right-of-way (an exterior wall-mount, new conduit run, or exterior panel work), do not skip checking with the Historic Preservation Commission whether a Certificate of Appropriateness is required -- Wallace's citywide National Historic Landmark status means exterior alterations generally need this approval, and no EV-specific exemption was found.
- The electrical work itself (the EVSE circuit) is not a city permit at all -- apply directly through the State of Idaho (DOPL, dopl.idaho.gov), the same as the electrical component of the city's solar permit.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Wallace building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Wallace
Electric Vehicle (EV) Charging Station / EVSE Permit (Certificate of Appropriateness + State Electrical Permit) in other cities
Look up this fee in a different city →
Related guides
Now live
Build your Wallace project checklist
Describe your project once and get every permit, document, and fee it triggers in Wallace — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →