Commercial Building Permit (New Construction, Additions, Remodels & Tenant Improvements) in Wallace, Idaho

Covers new commercial construction, commercial additions, and commercial interior/exterior remodels and tenant-improvement build-outs in Wallace. There is no separate commercial or tenant-improvement application, checklist, or fee track — a commercial project uses the same Building Permit process and the same Building Permit Process and Procedures handout as residential work, both administered under Wallace City Code Chapter 153 by the contracted City of Kellogg Building Official, Keith Teeters. What differs from residential work is the code track and the state completeness-review clock: commercial and other non-residential occupancies are reviewed against the 2018 International Building Code (Wallace City Code § 153.001(A)(1)) rather than the 2020 State Residential Code (§ 153.001(A)(2)), and Idaho Code § 39-4117 gives the City twenty (20) business days, instead of ten (10), to tell a commercial applicant in writing whether the application is complete. Because the entire city is a National Historic Landmark district, any exterior work on a commercial building — new construction, storefront alteration, or a new business sign — also requires a Certificate of Appropriateness from the Planning & Zoning/Historic Preservation Commission before the building permit can be issued.

Reviewed 2026-08-25 · Source

When you need this permit

  • Building permit required prior to commencement of commercial new construction, additions, alterations, remodels, or tenant-improvement build-outs within city limits — Wallace City Code Chapter 153
  • Commercial and other non-residential occupancies are reviewed against the International Building Code, 2018 Edition, as adopted by the State Building Code Board — Wallace City Code § 153.001(A)(1) — rather than the 2020 State Residential Code track used for one- and two-family dwellings (§ 153.001(A)(2))
  • Wallace publishes no distinct commercial or tenant-improvement application, checklist, or fee schedule: the City's Building Permit Process and Procedures handout (adopted by City Council 11/12/2025) describes a single generic building-permit process — obtain the application from the City Clerk, submit a plot plan, truss plan, project valuation, and two complete sets of building plans, and pay fees when the building official signs off — with no commercial-specific branch or additional step called out anywhere in the handout
  • Idaho Code § 39-4117 requires the City to give a commercial applicant written notice of whether the application is complete within twenty (20) business days of receiving the original or any revised submission (versus ten (10) business days for a residential application); a completeness determination is not itself permit approval, only authorization to proceed into full plan review, and no further review-timeline commitment beyond this statutory completeness window is published for either track
  • Because the entire city lies within the Wallace Historic District, any exterior work on a commercial building — new construction, alteration, restoration, demolition, or an outdoor advertising sign — requires a Certificate of Appropriateness from the Planning & Zoning/Historic Preservation Commission first, per Wallace City Code § 155.075; the ordinance text applies to exterior work on 'any building or other structure' without a residential/commercial carve-out, so a new storefront sign needs the same Certificate as a home addition (see the historic-preservation-certificate-of-appropriateness permit type)
  • Plan review and inspections are performed by the contracted City of Kellogg Building Official under the same interlocal Agreement to Provide Building Inspection Services used for residential permits; that agreement requires all building permit applications, plans, and fees to be submitted to Wallace (not to Kellogg directly), with Wallace then forwarding the application to Kellogg and remitting Kellogg 100% of plan-check fees and 75% of building-inspection fees collected — meaning Wallace's own fee schedule, not a Kellogg fee schedule, applies to a Wallace commercial applicant
  • Building permit and Building Department fees are set by resolution of the City Council rather than fixed in code text — Wallace City Code § 153.001(E) — and no such resolution with dollar figures has been adopted: a draft consolidated fee resolution (#2025-222) was still described as 'a very rough draft' needing Planning & Zoning review as of a September 2025 workshop, and has not appeared on a City Council agenda for adoption at any regular or special meeting since, through the August 12, 2026 meeting
  • Electrical, plumbing, and mechanical work is not issued or inspected by the City of Wallace — those permits are issued and inspected by the State of Idaho (Division of Occupational and Professional Licenses / Division of Building Safety, 1-800-955-3044, dbs.idaho.gov / dopl.idaho.gov), the same as for residential work
  • The Idaho State Fire Marshal's plan-review program is limited by its own published scope to state-owned and state-leased buildings; a privately owned commercial building in Wallace does not fall within that program based on the State Fire Marshal's own description of its plan-review scope
  • A fire official does participate in the City's building sign-off process in at least some cases: correspondence from a Wallace property owner in the City's November 2025 Council Packet describes a contractor being told he needed a 'fire marshal' signature on building plans (in that instance, over hillside road-access adequacy) before a permit would be issued. Neither the City of Wallace nor Silver Valley Fire Rescue — the Shoshone County fire protection district serving Wallace, formed in October 2025 by the merger of former Shoshone County Fire Districts 1 and 2 — publishes a plan-review process, timeline, or fee specific to commercial construction; confirm directly with the Building Official and with Silver Valley Fire Rescue (208-784-1188) before budgeting for this step

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

Building Permit / Plan Review Fee
Wallace's Building Permit Process and Procedures handout (adopted 11/12/2025) confirms the City collects permitting fees 'based on the current fee schedule,' but that schedule's dollar figures are… Show full citationWallace's Building Permit Process and Procedures handout (adopted 11/12/2025) confirms the City collects permitting fees 'based on the current fee schedule,' but that schedule's dollar figures are not published on wallace.id.gov or anywhere else, for commercial or residential work. A draft consolidated fee resolution (#2025-222) was still a rough draft as of September 2025 and has not reappeared on any City Council agenda for adoption through the August 12, 2026 meeting. The Kellogg building-inspection interlocal agreement confirms Wallace itself collects all building-permit fees directly from applicants and remits 100% of plan-check fees plus 75% of building-inspection fees to Kellogg — so Wallace's own (unpublished) schedule is the one that applies, not a separate Kellogg schedule; Kellogg's own building fees are likewise unpublished. Call City Hall, (208) 752-1147, for current fee amounts before applying.
Not published
Certificate of Appropriateness Application FeeNo fee is stated on the Certificate of Appropriateness application form itself, for a commercial or residential applicant; confirm with City Hall (208-752-1147) whether an application fee applies
Not published
Fire District Plan Review
Silver Valley Fire Rescue, the Shoshone County fire protection district serving Wallace, publishes no fee schedule, application, or plan-review process for commercial construction on its website (svfirerescue.com); Show full citationSilver Valley Fire Rescue, the Shoshone County fire protection district serving Wallace, publishes no fee schedule, application, or plan-review process for commercial construction on its website (svfirerescue.com); some form of fire-official sign-off does occur in the City's building-permit process (see requirements), but no dollar figure or formal procedure for it is published anywhere
Not published

Review timeline

Plan review
Not published — contact the department

How long did your Commercial Building Permit (New Construction, Additions, Remodels & Tenant Improvements) permit actually take in Wallace?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Footing

    Before concrete pour

  2. 2

    Foundation

    Foundation wall and rebar verification

  3. 3

    Framing

    Engineered stamped plans must be on site for this inspection, per the City's Building Permit Process and Procedures handout

  4. 4

    Insulation

    Insulation installed per energy code before drywall

  5. 5

    Electrical

    Coordinated with the contracted Building Official; the electrical work itself is permitted separately by the State of Idaho

  6. 6

    Plumbing

    Coordinated with the contracted Building Official; the plumbing work itself is permitted separately by the State of Idaho

  7. 7

    Sheetrock

    Before drywall/finish is closed up

  8. 8

    Tyvek / Shear Wall

    Additional inspections the handout lists for new construction builds

  9. 9

    Final / Certificate of Occupancy

    Final inspection required before a Certificate of Occupancy is issued for any structure or modification that will be occupied

See the full Wallace inspection guide — scheduling & re-inspection fees →

Tips

  • Wallace has no separate commercial-building-permit or tenant-improvement (TI) product — the City's Building Permit Process and Procedures handout and Wallace City Code § 153.001 describe one Building Permit process for the whole city. The only structural differences for a commercial project are the adopted code track (2018 IBC instead of the 2020 State Residential Code) and the state's 20-business-day completeness-review clock instead of 10.
  • Do not skip the Certificate of Appropriateness step for a commercial storefront, remodel, or new sign — because Wallace is entirely a National Historic Landmark district, Wallace City Code § 155.075 requires this review for exterior work on 'any building or other structure' with no exemption found for commercial occupancies.
  • Wallace collects 100% of the building-permit and plan-check fees itself and remits a share to the City of Kellogg for the contracted Building Official's services — so a Kellogg fee schedule does not directly apply to a Wallace commercial applicant, and in any case neither city publishes dollar figures. Call City Hall, (208) 752-1147, before budgeting a project.
  • Idaho's 20-business-day statutory clock for a commercial completeness determination is not a promise that plan review itself will be finished in 20 days — it only means the City must tell you within that window whether your application has everything it needs to move into full review.
  • A fire official has been involved in at least one Wallace building-permit sign-off documented in a City Council packet, but no commercial plan-review fee or process for fire review is published by the City or by Silver Valley Fire Rescue — ask the Building Official (Keith Teeters, 208-786-9131) directly whether your commercial project needs fire-district sign-off before you submit.

Frequently asked questions

Wallace requires a commercial building permit (new construction, additions, remodels & tenant improvements) for: Building permit required prior to commencement of commercial new construction, additions, alterations, remodels, or tenant-improvement build-outs within city limits — Wallace City Code Chapter 153; Commercial and other non-residential occupancies are reviewed against the International Building Code, 2018 Edition, as adopted by the State Building Code Board — Wallace City Code § 153.001(A)(1) — rather than the 2020 State Residential Code track used for one- and two-family dwellings (§ 153.001(A)(2)); Wallace publishes no distinct commercial or tenant-improvement application, checklist, or fee schedule: the City's Building Permit Process and Procedures handout (adopted by City Council 11/12/2025) describes a single generic building-permit process — obtain the application from the City Clerk, submit a plot plan, truss plan, project valuation, and two complete sets of building plans, and pay fees when the building official signs off — with no commercial-specific branch or additional step called out anywhere in the handout; Idaho Code § 39-4117 requires the City to give a commercial applicant written notice of whether the application is complete within twenty (20) business days of receiving the original or any revised submission (versus ten (10) business days for a residential application); a completeness determination is not itself permit approval, only authorization to proceed into full plan review, and no further review-timeline commitment beyond this statutory completeness window is published for either track; Because the entire city lies within the Wallace Historic District, any exterior work on a commercial building — new construction, alteration, restoration, demolition, or an outdoor advertising sign — requires a Certificate of Appropriateness from the Planning & Zoning/Historic Preservation Commission first, per Wallace City Code § 155.075; the ordinance text applies to exterior work on 'any building or other structure' without a residential/commercial carve-out, so a new storefront sign needs the same Certificate as a home addition (see the historic-preservation-certificate-of-appropriateness permit type); Plan review and inspections are performed by the contracted City of Kellogg Building Official under the same interlocal Agreement to Provide Building Inspection Services used for residential permits; that agreement requires all building permit applications, plans, and fees to be submitted to Wallace (not to Kellogg directly), with Wallace then forwarding the application to Kellogg and remitting Kellogg 100% of plan-check fees and 75% of building-inspection fees collected — meaning Wallace's own fee schedule, not a Kellogg fee schedule, applies to a Wallace commercial applicant; Building permit and Building Department fees are set by resolution of the City Council rather than fixed in code text — Wallace City Code § 153.001(E) — and no such resolution with dollar figures has been adopted: a draft consolidated fee resolution (#2025-222) was still described as 'a very rough draft' needing Planning & Zoning review as of a September 2025 workshop, and has not appeared on a City Council agenda for adoption at any regular or special meeting since, through the August 12, 2026 meeting; Electrical, plumbing, and mechanical work is not issued or inspected by the City of Wallace — those permits are issued and inspected by the State of Idaho (Division of Occupational and Professional Licenses / Division of Building Safety, 1-800-955-3044, dbs.idaho.gov / dopl.idaho.gov), the same as for residential work; The Idaho State Fire Marshal's plan-review program is limited by its own published scope to state-owned and state-leased buildings; a privately owned commercial building in Wallace does not fall within that program based on the State Fire Marshal's own description of its plan-review scope; A fire official does participate in the City's building sign-off process in at least some cases: correspondence from a Wallace property owner in the City's November 2025 Council Packet describes a contractor being told he needed a 'fire marshal' signature on building plans (in that instance, over hillside road-access adequacy) before a permit would be issued. Neither the City of Wallace nor Silver Valley Fire Rescue — the Shoshone County fire protection district serving Wallace, formed in October 2025 by the merger of former Shoshone County Fire Districts 1 and 2 — publishes a plan-review process, timeline, or fee specific to commercial construction; confirm directly with the Building Official and with Silver Valley Fire Rescue (208-784-1188) before budgeting for this step. If your project isn't listed, confirm with City of Wallace — Planning & Zoning / Building Department (building official services contracted to the City of Kellogg) at (208) 752-1147 before starting work.

Not published. Building permit and Building Department fees are set by City Council resolution (Wallace City Code § 153.001(E)) rather than posted online, and a draft consolidated fee resolution has not been adopted as of the City's August 2026 Council meetings. Wallace collects the fees itself and remits a contracted share to the City of Kellogg for building-official services, so Kellogg's own (also unpublished) fees do not separately apply. Call City Hall, (208) 752-1147, for a current quote.

Wallace does not publish a plan-review timeline for this permit. Contact City of Wallace — Planning & Zoning / Building Department (building official services contracted to the City of Kellogg) at (208) 752-1147 for current turnaround.

You'll need: Building Permit Application; Construction Drawings / Site Plan. Depending on your project, Wallace may also ask for: Certificate of Appropriateness (if exterior work); Building Permit Process and Procedures handout. See the required-documents checklist on this page for details on each.

Apply through City of Wallace — Planning & Zoning / Building Department (building official services contracted to the City of Kellogg) at 703 Cedar Street, Wallace, ID 83873. Phone: (208) 752-1147, email: kristina.larson@wallace.id.gov. Office hours: Mon–Fri 8:00 AM – 4:00 PM (closed holidays). Official information: https://wallace.id.gov/departments/.

No. Wallace uses the same Building Permit, under the same Wallace City Code Chapter 153, for residential and commercial/TI construction alike — the difference is which adopted code governs the project (the 2020 State Residential Code for one- and two-family dwellings, the 2018 International Building Code for commercial and other non-residential occupancies) and the state's completeness-review clock (20 business days for commercial versus 10 for residential, under Idaho Code § 39-4117). No distinct commercial or TI application, fee schedule, or process is published by the City.

Yes, if it involves exterior work. Because the entire City of Wallace is a National Historic Landmark district, Wallace City Code § 155.075 requires a Certificate of Appropriateness from the Planning & Zoning/Historic Preservation Commission for exterior work on any building or structure — including a commercial storefront alteration, new commercial construction, or a new business sign — before the building permit can be issued. No commercial exemption from this requirement is published.

Not confirmed as a general rule. A fire official has been involved in at least one documented Wallace building-permit sign-off, but neither the City of Wallace nor Silver Valley Fire Rescue (the Shoshone County fire protection district serving Wallace since an October 2025 merger of the county's two former fire districts) publishes a plan-review process, timeline, or fee specific to commercial construction. Ask the Building Official or Silver Valley Fire Rescue (208-784-1188) directly.

Sources & verification

Key facts verified against official sources. Last reviewed 2026-08-25.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Wallace building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

This one’s complicated · Get an expediter

Tell us about your project and we’ll connect you with a permit expediter who works in Wallace.

PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.