Victor building permits

Verified

Victor, Idaho — as published 2026-08-02.

Verified 2026-07-08 · Source

Codes adopted

2018 International Building Code (IBC) — adopted via Victor Municipal Code Title 7, Building Regulations2018 International Residential Code (IRC)Teton County adopted the 2018 I-Codes (including 2018 Energy Conservation Code) with local amendments, March 2021 — Victor building regulations are administered consistent with this county-wide adoptionIdaho State Plumbing Code and National Electrical Code — enforced by the Idaho Division of Occupational and Professional Licenses (DOPL), not the City of Victor

Permit types & fees

Standard Building Permit (Residential New Construction)

Verified

Required for new single-family dwellings and major residential construction projects in Victor. Reviewed and issued by the City of Victor Planning & Building Department; inspections performed by the city's contracted Building & Mechanical Inspector (Sunrise Engineering).

Verified 2026-07-08 · Source

Requirements

  • Submit a complete application through the city's online permit portal (iworq)
  • Plans must meet the 2018 IBC/IRC as administered under Victor Municipal Code Title 7
  • Permit review fee due before plan review begins, calculated by square footage and valuation per ICC standards
  • Impact fees due before permit issuance
  • Complete applications required — incomplete submissions face rejection

Required documents

  • RequiredBuilding Permit Web FormSubmitted via the City of Victor's online application portal (victorid.portal.iworq.net)
  • RequiredConstruction DrawingsComplete plan set including site plan, floor plans, elevations, and structural details

Fee schedule

Fee typeAmountNotes
Building Permit — valuation $1 to $500$22.50City of Victor Fee Schedule, effective October 1, 2024
Building Permit — valuation $501 to $2,000$23.50 for the first $500, plus $3.05 for each additional $100City of Victor Fee Schedule, effective October 1, 2024, Land Use Fees — 'Building Permit Fees- Based on the valuation of the project' table
Building Permit — valuation $2,001 to $25,000$69.25 for the first $2,000, plus $14.00 per each additional $1,000City of Victor Fee Schedule, effective October 1, 2024, Land Use Fees — 'Building Permit Fees- Based on the valuation of the project' table
Building Permit — valuation $25,001 to $50,000$391.75 for the first $25,000, plus $10.10 per each additional $1,000City of Victor Fee Schedule, effective October 1, 2024, Land Use Fees — 'Building Permit Fees- Based on the valuation of the project' table
Building Permit — valuation $50,001 to $100,000$643.75 for the first $50,000, plus $7.00 per each additional $1,000City of Victor Fee Schedule, effective October 1, 2024, Land Use Fees — 'Building Permit Fees- Based on the valuation of the project' table, rows continued under the 'Building Permit' subheading
Building Permit — valuation $100,001 to $500,000$993.75 for the first $100,000, plus $5.60 per each additional $1,000City of Victor Fee Schedule, effective October 1, 2024, Land Use Fees — 'Building Permit Fees- Based on the valuation of the project' table, rows continued under the 'Building Permit' subheading
Building Permit — valuation $500,001 to $1,000,000$3,233.75 for the first $500,000, plus $4.75 per each additional $1,000City of Victor Fee Schedule, effective October 1, 2024, Land Use Fees — 'Building Permit Fees- Based on the valuation of the project' table, rows continued under the 'Building Permit' subheading
Building Permit — valuation $1,000,001 and up$5,608.75 for the first $1,000,000, plus $3.65 per each additional $1,000City of Victor Fee Schedule, effective October 1, 2024, Land Use Fees — 'Building Permit Fees- Based on the valuation of the project' table, rows continued under the 'Building Permit' subheading
Building Permit Extension30% of original permit feeCity of Victor Fee Schedule, effective October 1, 2024, Land Use Fees — 'Building Permit Extension', published as '.3 (30%) x original permit fee'
Engineering Review (pass-through, if required)$210/hourCity of Victor Fee Schedule, effective October 1, 2024, 'Pass through Fees' — Building Permits, 'Outside Review Per Hour', 'Engineering Review per hour'
Plan Review (pass-through, if required)$96/hourCity of Victor Fee Schedule, effective October 1, 2024, 'Pass through Fees' — Building Permits, 'Outside Review Per Hour', 'Plan Review per hour'
Inspection Fee$96.00 per inspectionDue before certificate of occupancy issuance, per Building Information page
Re-inspection due to incomplete work$60/hour (1 hour minimum)City of Victor Fee Schedule, effective October 1, 2024, 'Other Land Use Fees' — 'Re-inspection due to incomplete work', $60/hour (1 hr min); the separate Public Works Services & Utility Fees section lists a distinct $50.00 re-inspection fee
Utility Connection — Sewer$2,125 per ERU, plus meter/pit costs
City of Victor Building Information page, Fees — 'Sewer Connection Fee is $2,125.00 per ERU', with the meter, meter pit, and antenna billed in addition. Show full citation

City of Victor Building Information page, Fees — 'Sewer Connection Fee is $2,125.00 per ERU', with the meter, meter pit, and antenna billed in addition. City of Victor Fee Schedule, effective October 1, 2024, lists the same amount as 'Sewer Connection 1 within city limits' under Public Works Services & Utility Fees

Utility Connection — Water$3,420 per ERU, plus meter/pit costs
City of Victor Building Information page, Fees — 'Water Connection Fee is $3,420.00 per ERU', with the meter, meter pit, and antenna billed in addition. Show full citation

City of Victor Building Information page, Fees — 'Water Connection Fee is $3,420.00 per ERU', with the meter, meter pit, and antenna billed in addition. City of Victor Fee Schedule, effective October 1, 2024, lists the same amount as 'Water Service Connection 1 within City limits' under Public Works Services & Utility Fees

Commercial Building Permit

Verified

Required for new commercial construction, and covers commercial remodels/tenant buildouts as well — the City of Victor does not offer a separate Tenant Improvement permit or application; commercial remodel/TI work is submitted through the same Building Permit Web Form and reviewed under the same Planning & Building process as new commercial construction, distinguished from residential-building-permit primarily by how the fee is calculated (Commercial Values per Square Foot per ICC Building Valuation Data, rather than the residential tiered-valuation table) and by additional commercial-specific submittal items (Industrial Users Survey, architect's stamp, non-residential impact fees).

Verified 2026-08-02 · Source

Requirements

  • Submit a complete application through the same city online permit portal (iworq) used for residential permits — there is no separate commercial-only application form; the 'Building Permit Web Form' covers both
  • Plans must meet the 2018 IBC as administered under Victor Municipal Code Title 7
  • Building Permit fee is calculated from Commercial Values per Square Foot per the ICC Building Valuation Data table (not the residential tiered-valuation fee schedule) — the Fee Schedule does not publish the specific $/sq ft multiplier used; confirm current calculation with Planning & Building at 208-274-7082
  • An Idaho-licensed architect's stamp is required for all new commercial construction, and for any remodel/construction project over 2,500 square feet (per the Building Information page's Site Development requirements, which apply project-wide, not only to new construction)
  • An Industrial Users Survey is required as part of a complete application for all mixed-use, multi-family, commercial, and industrial building permits
  • Photometric Plan and Fixture Spec Sheet/Lumen-Color-Temperature information are required if any outdoor lighting is proposed on a commercial project
  • Impact fees (non-residential Parks & Recreation, Transportation Pathways, Transportation Roadways, and Fire Impact Fee categories) are due before permit issuance, assessed per 1,000 square feet by land-use category (Retail/Office/Industrial/Institutional/Lodging)
  • Complete applications required — incomplete submissions face rejection, restarting the review clock
  • Idaho Code § 39-4117 (enacted 2025) sets a statutory floor: if the city deems a commercial building permit application incomplete, it must provide written notice within 20 business days of receipt specifying missing information, and must issue a written completeness determination within 20 business days of a (re)submission — this governs completeness determination only, not a guarantee of full plan-review approval within that window

Required documents

  • RequiredBuilding Permit Web FormSame general application used for residential and commercial construction, submitted via victorid.portal.iworq.net; no dedicated commercial-only form is published
  • RequiredSite PlanScaled site plan per the Building Information page's Site Development checklist
  • RequiredBuilding Construction DrawingsComplete plan set including floor plans, elevations, and structural details; must bear an Idaho-licensed architect's stamp for new commercial construction or remodels/construction over 2,500 sq ft
  • RequiredIndustrial Users SurveyRequired for all mixed-use, multi-family, commercial, and industrial building permit applications
  • RequiredWarranty Deed
  • OptionalNotarized Authorization Letter from the property ownerRequired if the applicant is not the property owner
  • OptionalPhotometric PlanRequired for outdoor lighting proposed in commercial projects
  • OptionalFixture Spec Sheet & Lumen/Color Temperature InformationRequired for any proposed outdoor lighting

Fee schedule

Fee typeAmountNotes
Building Permit — Commercial (valuation-based)Commercial Permit Fees Based on Commercial Values per Square Foot — see ICC Building Valuation Data
City of Victor Fee Schedule, effective October 1, 2024, section 'Building Permits for Commercial' — quoted verbatim; Show full citation

City of Victor Fee Schedule, effective October 1, 2024, section 'Building Permits for Commercial' — quoted verbatim; no specific dollar figure or $/sq ft rate is published on the fee schedule itself. The same Fee Schedule page separately lists an 'Idaho Construction Multiplier' of 97%, but does not state how/whether it is applied to the commercial ICC Building Valuation Data calculation — confirm the actual computed fee with Planning & Building (208-274-7082) before relying on it.

Change of Use (to a Commercial/Industrial Occupancy)$180.00City of Victor Fee Schedule, effective October 1, 2024 — applies when converting an existing structure's occupancy classification to commercial/industrial
Mechanical Permit (Commercial)$120/unitSame rate as listed under the minor-permit-mechanical entry; applies when mechanical-only scope does not require a full Standard/Commercial Building Permit
Fire Sprinkler Review/Inspection$300.00City of Victor Fee Schedule, effective October 1, 2024, 'Construction Plan Review' section
Fire Alarm Review/Inspection$200.00City of Victor Fee Schedule, effective October 1, 2024, 'Construction Plan Review' section
Commercial Kitchen Suppression$100.00City of Victor Fee Schedule, effective October 1, 2024, 'Construction Plan Review' section
Impact Fees: Transportation Roadways — Non-Residential (per 1,000 sq ft)Retail $5,730; Office $2,208; Industrial $992; Institutional $2,194; Lodging $1,265/roomCity of Victor Fee Schedule, effective October 1, 2024, 'Impact Fees: Transportation Roadways' section — full non-residential category breakdown as published
Fire Impact Fees — Non-Residential (per 1,000 sq ft)Retail $3,600.00; Industrial $623.00; Institutional $1,379.00; Lodging $1,024.00/room
City of Victor Fee Schedule, effective October 1, 2024, 'Fire Impact Fees' section — no Office rate is published in this fee category's non-residential table (Office is present in the Transportation… Show full citation

City of Victor Fee Schedule, effective October 1, 2024, 'Fire Impact Fees' section — no Office rate is published in this fee category's non-residential table (Office is present in the Transportation Roadways table but absent here); this is a gap in the city's own published schedule, not an extraction omission

Impact Fees: Parks and Recreation Fee — Non-Residential (per 1,000 sq ft)Lodging $1,140/roomCity of Victor Fee Schedule, effective October 1, 2024 — this fee category's non-residential table publishes only a Lodging rate; Retail/Office/Industrial/Institutional rows are present as row labels in the site's own table but have no populated dollar figures
Impact Fees: Transportation Pathways — Non-Residential (per 1,000 sq ft)Lodging $1,227/roomCity of Victor Fee Schedule, effective October 1, 2024 — same gap as the Parks and Recreation non-residential table: only Lodging is populated
Inspection Fee$96.00 per inspectionSame as residential-building-permit; due before certificate of occupancy issuance
Re-inspection due to incomplete work$60/hour (1 hour minimum)City of Victor Fee Schedule, effective October 1, 2024, 'Other Land Use Fees' — 'Re-inspection due to incomplete work', $60/hour (1 hr min); the separate Public Works Services & Utility Fees section lists a distinct $50.00 re-inspection fee
Additional Inspections/reviews beyond permit cost$50/hour (1 hour minimum)City of Victor Fee Schedule, effective October 1, 2024 — distinct line item from the re-inspection fee above
Engineering Review (pass-through, if required)$210/hourCity of Victor Fee Schedule, effective October 1, 2024, 'Pass through Fees' — Building Permits, 'Outside Review Per Hour', 'Engineering Review per hour'
Plan Review (pass-through, if required)$96/hourCity of Victor Fee Schedule, effective October 1, 2024, 'Pass through Fees' — Building Permits, 'Outside Review Per Hour', 'Plan Review per hour'
Building Permit Extension30% of original permit feeCity of Victor Fee Schedule, effective October 1, 2024, Land Use Fees — 'Building Permit Extension', published as '.3 (30%) x original permit fee'
Utility Connection — Sewer$2,125 per ERU, plus meter/pit costs
City of Victor Building Information page, Fees — 'Sewer Connection Fee is $2,125.00 per ERU', with the meter, meter pit, and antenna billed in addition. Show full citation

City of Victor Building Information page, Fees — 'Sewer Connection Fee is $2,125.00 per ERU', with the meter, meter pit, and antenna billed in addition. City of Victor Fee Schedule, effective October 1, 2024, lists the same amount as 'Sewer Connection 1 within city limits' under Public Works Services & Utility Fees

Utility Connection — Water$3,420 per ERU, plus meter/pit costs
City of Victor Building Information page, Fees — 'Water Connection Fee is $3,420.00 per ERU', with the meter, meter pit, and antenna billed in addition. Show full citation

City of Victor Building Information page, Fees — 'Water Connection Fee is $3,420.00 per ERU', with the meter, meter pit, and antenna billed in addition. City of Victor Fee Schedule, effective October 1, 2024, lists the same amount as 'Water Service Connection 1 within City limits' under Public Works Services & Utility Fees

Minor Permit — Mechanical (Residential or Commercial)

Verified

Required for mechanical-only work (HVAC, furnaces, and related mechanical installations) in Victor that does not rise to the level of a Standard Building Permit.

Verified 2026-07-08 · Source

Requirements

  • Applies to mechanical-only scope of work for residential or commercial properties
  • Submit via the Minor Permit: Mechanical web form on the city's online portal

Required documents

  • RequiredMinor Permit: Mechanical for Residential or Commercial Web FormSubmitted via victorid.portal.iworq.net

Fee schedule

Fee typeAmountNotes
Mechanical Permit — Residential$90/unitCity of Victor Fee Schedule, effective October 1, 2024
Mechanical Permit — Commercial$120/unitCity of Victor Fee Schedule, effective October 1, 2024, 'Other Land Use Fees' — 'Mechanical Permit (Commercial)', $120/unit
Re-inspection due to incomplete work$60/hour (1 hour minimum)City of Victor Fee Schedule, effective October 1, 2024, 'Other Land Use Fees' — 'Re-inspection due to incomplete work', $60/hour (1 hr min); the separate Public Works Services & Utility Fees section lists a distinct $50.00 re-inspection fee

Minor Permit — Framing (Residential or Commercial)

Verified

Required for minor framing work in Victor that does not rise to the level of a Standard Building Permit.

Verified 2026-07-08 · Source

Requirements

  • Applies to minor framing scope of work for residential or commercial properties
  • Submit via the Minor Permit: Framing web form on the city's online portal

Required documents

  • RequiredMinor Permit: Framing for Residential or Commercial Web FormSubmitted via victorid.portal.iworq.net

Fee schedule

Fee typeAmountNotes
Building Permit — valuation-based per standard fee tableSame valuation-based schedule as the Standard Building Permit: $22.50 (up to $500) through $5,608.75 + $3.65/$1,000 ($1,000,001+)The Fee Schedule does not list a separate flat fee for minor framing permits; framing work is valuation-assessed under the same Building Permit fee table.

Sign Permit

Verified

Required for installation of signage in Victor.

Verified 2026-07-08 · Source

Requirements

  • Applies to new sign installations requiring a building permit
  • Submit via the Sign Permit web form on the city's online portal

Required documents

  • RequiredSign Permit Web FormSubmitted via victorid.portal.iworq.net

Fee schedule

Fee typeAmountNotes
Sign Building Permit$90.00City of Victor Fee Schedule, effective October 1, 2024 — 'Sign building permit (if required)'
Sign Permit (Land Use)Listed separately in the Fee Schedule's Land Use Fees sectionDistinct line item from the sign building permit; exact dollar amount not captured in the fetched fee-schedule extract — confirm with Planning & Building at 208-274-7082 before applying

Demolition & Structure Moving Permit

Verified

Required for demolition of structures or relocation of a structure within or into Victor.

Verified 2026-07-08 · Source

Requirements

  • Applies to demolition of existing structures and moving structures onto/within a lot
  • Refundable bond required in addition to the permit fee
  • Submit via the Demolition & Moving Structure Permit web form

Required documents

  • RequiredDemolition & Moving Structure Permit Web FormSubmitted via victorid.portal.iworq.net

Fee schedule

Fee typeAmountNotes
Moving/Demolition Permit$120 fee, plus $900 refundable bondCity of Victor Fee Schedule, effective October 1, 2024

Re-Roofing Permit

Verified

Required for roof replacement/re-roofing on existing structures in Victor.

Verified 2026-07-08 · Source

Requirements

  • Applies to re-roofing of existing residential or commercial structures
  • Submit via the city's online permit portal

Required documents

  • RequiredBuilding Permit Web FormSubmitted via victorid.portal.iworq.net (re-roofing uses the general building permit application)

Fee schedule

Fee typeAmountNotes
Re-Roofing Permit$90.00City of Victor Fee Schedule, effective October 1, 2024

Solar PV Installation (Standard Building Permit) + Solar Airspace Review

Verified

The City of Victor has no dedicated solar-PV application form or flat solar fee line on its Fee Schedule or its 'All Forms & Applications' page — a rooftop or ground-mount solar photovoltaic installation is billed under the same valuation-based Standard Building Permit fee table used for other construction (see residential-building-permit), submitted via the same online iworq portal. Electrical interconnection work is handled entirely by the Idaho Division of Occupational and Professional Licenses (DOPL), not the city, consistent with Victor's general electrical/plumbing sourcing. Separately, the city's Fee Schedule carries a distinct 'Solar Airspace Review Public Meeting' line item (billed at the cost of the contractor plus 10%) — a zoning-side public-meeting process, not a building permit, that applies when a proposed structure or installation raises a solar-access dispute with a neighboring property.

Verified 2026-07-20 · Source

Requirements

  • Solar PV installation (structural/racking component) requires the same Standard Building Permit as other construction — no separate solar application form is published
  • Plans must meet the 2018 IBC/IRC as administered under Victor Municipal Code Title 7, same as other building permits
  • Electrical interconnection/wiring is permitted and inspected by the Idaho Division of Occupational and Professional Licenses (DOPL), not the City of Victor
  • A 'Solar Airspace Review Public Meeting' is a separate, separately-billed zoning process, not a building permit, and applies where a proposed structure or solar installation affects a neighbouring property's solar access — confirm with Planning & Building (208-274-7082) whether your project triggers this review
  • Idaho Code § 55-3208 (enacted 2022) prohibits a homeowners' association from banning rooftop solar installation outright, though an HOA may impose reasonable orientation/placement and aesthetic conditions on owner-maintained rooftops — relevant if the property is within an HOA-governed subdivision

Required documents

  • RequiredBuilding Permit Web FormSame general application used for other construction, submitted via victorid.portal.iworq.net; no dedicated solar-only form is published

Fee schedule

Fee typeAmountNotes
Building Permit — valuation-based (same table as residential-building-permit)$22.50 (up to $500 valuation) through $5,608.75 + $3.65/$1,000 (over $1,000,001)City of Victor Fee Schedule, effective October 1, 2024 — no distinct solar-specific building-permit fee line found; solar is billed under the general valuation-based table
Solar Airspace Review Public MeetingCost of Contractor + 10%City of Victor Fee Schedule, effective October 1, 2024 — a distinct zoning-side public-meeting fee for solar-access review, separate from the building permit fee; applies only where a solar-access dispute/review is triggered, not to every solar installation

Electric Vehicle (EV) Charging Station / EVSE Permit

Verified

The City of Victor has no dedicated EV charger/EVSE permit application or fee line on its Fee Schedule or its 'All Forms & Applications' page. As with the electrical-interconnection component of the city's solar-pv-permit entry, EV charging station wiring is permitted and inspected by the Idaho Division of Occupational and Professional Licenses (DOPL), not the City of Victor, since the city does not run its own electrical permitting program. If the EV charger installation requires new structural work (e.g., a new carport or accessory structure), that portion would separately require the city's Standard Building Permit, billed under the same valuation-based fee table used for other construction.

Verified 2026-07-20 · Source

Requirements

  • No standalone EV charger/EVSE permit application or fee line exists at the city level; neither the city's Fee Schedule nor its All Forms & Applications page contains an EV/EVSE/charging-station entry
  • Electrical work for EV charging station installation is permitted through the Idaho Division of Occupational and Professional Licenses (DOPL), not the City of Victor -- consistent with how the city's own solar-pv-permit entry sources electrical interconnection work to DOPL rather than the city Planning & Building Department
  • If the EV charger installation is paired with new structural work (new garage, carport, or accessory structure), that portion would separately require the city's Standard Building Permit, valuation-based per the general fee table
  • A licensed electrical contractor typically pulls the DOPL electrical permit; a Homeowner Electrical Permit option also exists for owner-occupied residential work

Required documents

  • RequiredElectrical Permit Application (State of Idaho, DOPL)Standard state electrical permit application; not issued by the City of Victor

Fee schedule

Fee typeAmountNotes
State Electrical Permit — Existing Dwelling Unit Permit (residential EVSE circuit added to an existing home)$65.00 per inspection (flat; no per-branch-circuit surcharge)
Idaho Administrative Code, IDAPA 24.39.10, Section 500.02.a.ii (Rules of the Idaho Electrical Board, official current rule, effective 3-28-23), adminrules.idaho.gov… Show full citation

Idaho Administrative Code, IDAPA 24.39.10, Section 500.02.a.ii (Rules of the Idaho Electrical Board, official current rule, effective 3-28-23), adminrules.idaho.gov (https://adminrules.idaho.gov/rules/current/24/243910.pdf). The fee is set and collected by the State of Idaho (DOPL), not the City of Victor.

DOPL Electrical Permit — Other Installations (Including Industrial and Commercial) Permit (new construction, commercial, or multi-family EVSE)Wiring cost up to $10,000: $60 plus 2% of total wiring cost; $10,001-$100,000: $260 plus 1% of excess over $10,000; over $100,000: $1,160 plus 0.5% of excess over $100,000Idaho Administrative Code, IDAPA 24.39.10, Section 500.02.b, adminrules.idaho.gov (official current rule, effective 3-28-23) — the statewide DOPL mechanism, which applies here rather than any locally set fee.

Sources & verification

Verified against official sources. Last reviewed 2026-07-08.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Victor building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-07-20)View current record →All versions →

Permalink: /idaho/teton-county-id/victor-id/as-of/2026-08-02/

Snapshot date: 2026-08-02

Commit: 3f7a229

Reproducible from PermitBase’s version-controlled dataset, commit 3f7a229.