Victor building permits

Verified

Department contacts, adopted codes, permit types, fees, and gotchas for Victor, Idaho.

Last verified 2026-07-08 · Source · Embed this page’s badge · Version history

Building department

Address
138 N. Main St., P.O. Box 122, Victor, ID 83455
Phone
208-274-7082
Office hours
Monday–Thursday 8:00 AM – 6:00 PM (closed Fridays)

Inspection guide

See how inspections work in Victor — sequence, scheduling & re-inspection fees.

Codes adopted

Idaho adopts a statewide baseline building code set under the Idaho Building Code Act (Idaho Code Title 39, Chapter 41) and IDAPA rules administered by the Idaho Division of Occupational and Professional Licenses (DOPL). Effective January 1, 2021, the statewide baseline includes the 2018 International Building Code (IBC), 2020 Idaho Residential Code (based on the 2018 IRC Parts I–III and IX with Idaho amendments), 2020 Idaho Energy Conservation Code (based on the 2018 IECC with Idaho amendments), 2018 International Existing Building Code (IEBC), 2018 International Mechanical Code (IMC), 2018 International Fuel Gas Code (IFGC), and 2018 International Fire Code (IFC). The National Electrical Code is adopted separately by the Idaho Electrical Board (IDAPA 24.39.10), not bundled with the building code: Idaho enforces the 2023 NEC, effective July 1, 2024 (the state used the 2017 NEC with amendments before that and skipped the 2020 edition). Local jurisdictions must enforce the state baseline and may adopt amendments only where those amendments are at least as stringent as the state-adopted editions; local amendments may not be less restrictive. Enforcement is local — each city or county issues permits and performs inspections. Always confirm the current adopted edition and any local amendments with your specific jurisdiction before submitting plans.

  • 2018 International Building Code (IBC) — adopted via Victor Municipal Code Title 7, Building Regulations
  • 2018 International Residential Code (IRC)
  • Teton County adopted the 2018 I-Codes (including 2018 Energy Conservation Code) with local amendments, March 2021 — Victor building regulations are administered consistent with this county-wide adoption
  • Idaho State Plumbing Code and National Electrical Code — enforced by the Idaho Division of Occupational and Professional Licenses (DOPL), not the City of Victor

Permit types & fees

New residential construction activity

New privately-owned residential construction only

Housing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).

Latest month (2026-05)
2units

2 buildings · $1.1M valuation

Trailing 12 months
127units

12 of 12 months reported · #29 in Idaho coverage by units

Year to date (2026 YTD through 2026-05)
11units

7 buildings · $3.2M valuation

5 month(s) reported to Census

Full year 2025
121units

28 buildings · $27.4M valuation

Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-05 vintage. Census survey data — separate from the permit-requirements verification above. All Idaho building activity

Tips & gotchas

  • The City of Victor's Planning & Building Department is independently operated — it is NOT contracted to Teton County or to the neighboring City of Driggs. Victor issues and reviews its own permits through its own portal (victorid.portal.iworq.net); it contracts only its building/mechanical inspection function to Sunrise Engineering (Georg Behrens, 800-560-6151), which is a routine third-party inspector arrangement, not a delegation of permitting authority.
  • Electrical and plumbing permits and inspections in Victor are handled entirely by the Idaho Division of Occupational and Professional Licenses (DOPL) — not the city. Apply and schedule those directly with DOPL.
  • Fire Marshal review (for applicable projects) is provided by Earle Giles of Teton County Fire, 208-715-5201.
  • General building permit reviews target 15 business days from a complete application; incomplete applications are rejected, restarting the clock.
  • Inspections require a minimum of 48 hours notice; next-day inspections must be requested before 3 PM.
  • Utility connection fees (sewer $2,125/ERU, water $3,420/ERU, plus meter/pit costs) are substantial and separate from building permit fees — factor these into project budgets.
  • The city explicitly warns it will never request wire payments for permits — verify any such request by calling 208-274-7082 directly.
  • Victor's Fee Schedule (effective October 1, 2024) is published as an HTML table on the city's Finance/Treasurer page rather than a standalone PDF.

Related guides

Comparable nearby cities

Driggs
Both in Teton County3 shared permit types~9 mi away
Compare fees →
Cascade
4 shared permit typesBoth on the 2018 International Residential Code (IRC)
Compare fees →
Emmett
4 shared permit typesBoth on the 2018 International Residential Code (IRC)
Compare fees →