Skip to main content
PermitBase

Version history — Victor, Idaho

This is PermitBase’s own verified record for Victor, reconstructed from this dataset’s version-controlled history. Each version below reflects what our record stated as of that date — it is not a warranty of what Victor’s actual law was at that time.

Permanent link to today’s record

/idaho/teton-county-id/victor-id/as-of/2026-08-02/

Look up a specific date

Pick a date and we’ll show you the record as it stood then.

All versions

  • 2026-08-02Current record
    • Victor, Idaho — Commercial Building Permit record added
  • 2026-07-20Superseded
    • Victor, Idaho — Electric Vehicle (EV) Charging Station / EVSE Permit fee record added: State Electrical Permit — Existing Dwelling Unit Permit (residential EVSE circuit added to an existing home) ($65.00 per inspection (flat; no per-branch-circuit surcharge))
    • Victor, Idaho — Electric Vehicle (EV) Charging Station / EVSE Permit fee record added: DOPL Electrical Permit — Other Installations (Including Industrial and Commercial) Permit (new construction, commercial, or multi-family EVSE) (Wiring cost up to $10,000: $60 plus 2% of total wiring cost; $10,001-$100,000: $260 plus 1% of excess over $10,000; over $100,000: $1,160 plus 0.5% of excess over $100,000)
    • Victor, Idaho — Electric Vehicle (EV) Charging Station / EVSE Permit fee record removed: State Electrical Permit Fee (EV charger/EVSE circuit)
    • Victor, Idaho — Solar PV Installation (Standard Building Permit) + Solar Airspace Review record added
    • Victor, Idaho — Electric Vehicle (EV) Charging Station / EVSE Permit record added
  • 2026-07-07Initial record — coverage of Victor began