This is PermitBase’s published record for Buhl as of 2026-07-07. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.

Buhl building permits

Verified

Buhl, Idaho — as published 2026-07-07.

Verified 2026-07-07 · Source

Codes adopted

2018 International Building Code (IBC), as currently enforced per the City of Buhl Building Department (Buhl Municipal Code 8-1-1 as codified online still lists the 2012 IBC per Ord. 974, 1-27-2014 — the department's own published webpage confirms 2018 IBC is the version presently enforced, consistent with the statewide Idaho Building Code Board 2018-cycle adoption)2018 International Residential Code (IRC), as currently enforced per the City of Buhl Building Department2009 International Energy Conservation Code (IECC), per Buhl Municipal Code 8-1-1.C (Ord. 974, 1-27-2014, eff. retroactive to 1-1-2014) — no subsequent municipal amendment found in the codified online ordinance text2012 International Existing Building Code (IEBC), per Buhl Municipal Code 8-1-1.D (Ord. 974, 1-27-2014, eff. retroactive to 1-1-2014)All codes adopted 'as adopted by the State of Idaho or the Idaho Building Code Board, together with any amendments or revisions... made by the Idaho Building Code Board through the negotiated rulemaking process' (Buhl Municipal Code 8-1-1)Idaho State Plumbing Code and National Electrical Code — administered by the State of Idaho Division of Occupational and Professional Licenses (DOPL), not the City of Buhl

Permit types & fees

Building Permit (Residential New Construction, Additions, Remodels, Repairs)

Verified

Required for erecting, constructing, altering, repairing, or renewing any residential or commercial structure in Buhl, including new construction, remodels, additions, repairs, and fire damage restoration. Uses a single citywide valuation-based fee schedule covering all structure permit fees.

Verified 2026-07-07 · Source

Requirements

  • New construction, remodel, addition, repair, renewal, or fire damage restoration of a residential or commercial structure
  • Legal description (lot, block, subdivision) and job address
  • Contractor name, address, phone, and Idaho contractor license number (if applicable)
  • Owner name, address, and phone
  • Valuation of work to calculate the permit fee
  • Zoning, Health Department, Fire Department, State Fire Marshal, Water Department, Sewer Department, DEQ, and/or soil report approvals as applicable to the project

Required documents

  • RequiredApplication for Building PermitCity of Buhl building permit application form; requires legal description, contractor/owner info, valuation of work, and permit/plan check/sewer/water connection/street repair fee breakdown

Fee schedule

Fee typeAmountNotes
Building Permit — valuation $1 to $500$23.50City of Buhl Building Permit Fee Schedule, based on the 1997 Uniform Code fee table
Building Permit — valuation $501 to $2,000$23.50 for the first $500, plus $3.05 for each additional $100 or fraction thereof, to and including $2,000
Building Permit — valuation $2,001 to $25,000$69.25 for the first $2,000, plus $14.00 for each additional $1,000 or fraction thereof, to and including $25,000
Building Permit — valuation $25,001 to $50,000$391.75 for the first $25,000, plus $10.10 for each additional $1,000 or fraction thereof, to and including $50,000
Building Permit — valuation $50,001 to $100,000$643.75 for the first $50,000, plus $7.00 for each additional $1,000 or fraction thereof, to and including $100,000
Building Permit — valuation $100,001 to $500,000$993.75 for the first $100,000, plus $5.60 for each additional $1,000 or fraction thereof, to and including $500,000
Building Permit — valuation $500,001 to $1,000,000$3,233.75 for the first $500,000, plus $4.75 for each additional $1,000 or fraction thereof, to and including $1,000,000
Building Permit — valuation $1,000,001 to $5,000,000$5,608.75 for the first $1,000,000, plus $3.65 for each additional $1,000 or fraction thereof, to and including $5,000,000
Building Permit — valuation $5,000,001 to $10,000,000$20,208.75 for the first $5,000,000, plus $2.75 for each additional $1,000 or fraction thereof, to and including $10,000,000
Building Permit — valuation $10,000,001 and up$33,958.75 for the first $10,000,000, plus $2.00 for each additional $1,000 or fraction thereof
Plan Check Fee25% of the base Building Permit FeeConfirmed on both the City of Buhl Application for Building Permit and the Demolition Permit Application (office-use fee section)

Demolition Permit

Verified

Required for demolition of any structure in Buhl. Uses a dedicated application form (site plan, parcel information, scope of work, estimated value) with fees calculated on the same valuation-based Building Permit fee schedule plus a 25% Plan Check Fee.

Verified 2026-07-07 · Source

Requirements

  • Electronic PDF of plans and permit (emailed to the Building Department)
  • Scaled site plan showing north arrow/scale, dimensioned location of proposed and existing structures, street frontage dimensions and street names, and right-of-way
  • Parcel number, subdivision/block/lot or section/township/range
  • Zoning district, type of use, number of dwelling units being demolished, number of stories, building height, existing building area (square feet), scope of work, and estimated value
  • Notify City Hall as soon as demolition is completed, providing as much advance notice as possible

Required documents

  • RequiredDemolition Permit ApplicationCity of Buhl Building Department 3-page application including property/contractor information, site plan requirements, property/project details, and an office-use permit fee section

Fee schedule

Fee typeAmountNotes
Demolition Permit — base fee based on estimated value of workCalculated using the same valuation-based Building Permit Fee Schedule as new constructionPer the Demolition Permit Application's Office Use Only fee section: Valuation of Work, Permit Fee, and Plan Check Fee (25% of Permit Fee) are itemized identically to the general Building Permit; no separate flat demolition fee is published
Plan Check Fee25% of the Demolition Permit FeeCity of Buhl Demolition Permit Application, Office Use Only fee section

Sign Permit

Required for erecting, moving, constructing, altering, or enlarging any sign in Buhl. Electrical signs additionally require an electrical permit. No permit is required for routine sign maintenance. Governed by Buhl Municipal Code Title 9, Chapter 14 (Signs and Billboards).

Reviewed 2026-07-07 · Source

Requirements

  • Required for any new sign, or moving/constructing/altering/enlarging an existing sign
  • Electrical signs require an additional electrical permit (issued by the State of Idaho DOPL)
  • No permit required for sign maintenance
  • Authorized work under a sign permit must be completed within 180 days of issuance
  • Short-term signs or banners placed across streets, highways, sidewalks, or alleys require a separate permit from the City Clerk-Treasurer's Office and must be timely removed per the permit's display period
  • Application made on forms furnished by the Building Inspector

Required documents

  • RequiredSign Permit ApplicationApplication furnished by the Buhl Building Inspector; accompanied by information necessary to ensure compliance with applicable laws and regulations

Fee schedule

Fee typeAmountNotes

Manufactured Home Permit (In Park and On Permanent Foundation)

Required for placement of a manufactured/mobile home within Buhl, whether sited in a manufactured home park or set on a permanent foundation. Listed by the City of Buhl Building Department as one of its own permit types, alongside residential/commercial building, roof, fence, demolition, occupancy, sign, and solar permits.

Reviewed 2026-07-07 · Source

Requirements

  • Applies to manufactured/mobile homes placed in a manufactured home park or on a permanent foundation within city limits
  • Foundation and site work fall under the City's building permit and valuation-based fee schedule
  • Electrical connection and utility hookups are subject to separate State of Idaho DOPL electrical permitting

Required documents

  • RequiredBuilding Permit ApplicationCity of Buhl's standard building permit application is used for manufactured home placement, with scope of work described as manufactured home installation

Fee schedule

Fee typeAmountNotes

Sources & verification

Verified against official sources. Last reviewed 2026-07-07.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Buhl building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Later version (2026-07-13) →View current record →All versions →

Permalink: /idaho/twin-falls-county/buhl/as-of/2026-07-07/

Snapshot date: 2026-07-07

Commit: 8de51ed

Reproducible from PermitBase’s version-controlled dataset, commit 8de51ed.