Buhl building permits

Verified

Buhl, Idaho — as published 2026-07-13.

Verified 2026-07-13 · Source

Codes adopted

2018 International Building Code (IBC), as currently enforced per the City of Buhl Building Department (Buhl Municipal Code 8-1-1 as codified online still lists the 2012 IBC per Ord. 974, 1-27-2014 — the department's own published webpage confirms 2018 IBC is the version presently enforced, consistent with the statewide Idaho Building Code Board 2018-cycle adoption)2018 International Residential Code (IRC), as currently enforced per the City of Buhl Building Department2009 International Energy Conservation Code (IECC), per Buhl Municipal Code 8-1-1.C (Ord. 974, 1-27-2014, eff. retroactive to 1-1-2014) — no subsequent municipal amendment found in the codified online ordinance text2012 International Existing Building Code (IEBC), per Buhl Municipal Code 8-1-1.D (Ord. 974, 1-27-2014, eff. retroactive to 1-1-2014)All codes adopted 'as adopted by the State of Idaho or the Idaho Building Code Board, together with any amendments or revisions... made by the Idaho Building Code Board through the negotiated rulemaking process' (Buhl Municipal Code 8-1-1)Idaho State Plumbing Code and National Electrical Code — administered by the State of Idaho Division of Occupational and Professional Licenses (DOPL), not the City of Buhl

Permit types & fees

Building Permit (Residential New Construction, Additions, Remodels, Repairs)

Verified

Required for erecting, constructing, altering, repairing, or renewing any residential or commercial structure in Buhl, including new construction, remodels, additions, repairs, and fire damage restoration. Uses a single citywide valuation-based fee schedule covering all structure permit fees.

Verified 2026-07-13 · Source

Requirements

  • New construction, remodel, addition, repair, renewal, or fire damage restoration of a residential or commercial structure
  • Legal description (lot, block, subdivision) and job address
  • Contractor name, address, phone, and Idaho contractor license number (if applicable)
  • Owner name, address, and phone
  • Valuation of work to calculate the permit fee
  • Zoning, Health Department, Fire Department, State Fire Marshal, Water Department, Sewer Department, DEQ, and/or soil report approvals as applicable to the project

Required documents

  • RequiredApplication for Building PermitCity of Buhl building permit application form; requires legal description, contractor/owner info, valuation of work, and permit/plan check/sewer/water connection/street repair fee breakdown

Fee schedule

Fee typeAmountNotes
Building Permit — valuation $1 to $500$23.50City of Buhl Building Permit Fee Schedule, based on the 1997 Uniform Code fee table
Building Permit — valuation $501 to $2,000$23.50 for the first $500, plus $3.05 for each additional $100 or fraction thereof, to and including $2,000
Building Permit — valuation $2,001 to $25,000$69.25 for the first $2,000, plus $14.00 for each additional $1,000 or fraction thereof, to and including $25,000
Building Permit — valuation $25,001 to $50,000$391.75 for the first $25,000, plus $10.10 for each additional $1,000 or fraction thereof, to and including $50,000
Building Permit — valuation $50,001 to $100,000$643.75 for the first $50,000, plus $7.00 for each additional $1,000 or fraction thereof, to and including $100,000
Building Permit — valuation $100,001 to $500,000$993.75 for the first $100,000, plus $5.60 for each additional $1,000 or fraction thereof, to and including $500,000
Building Permit — valuation $500,001 to $1,000,000$3,233.75 for the first $500,000, plus $4.75 for each additional $1,000 or fraction thereof, to and including $1,000,000
Building Permit — valuation $1,000,001 to $5,000,000$5,608.75 for the first $1,000,000, plus $3.65 for each additional $1,000 or fraction thereof, to and including $5,000,000
Building Permit — valuation $5,000,001 to $10,000,000$20,208.75 for the first $5,000,000, plus $2.75 for each additional $1,000 or fraction thereof, to and including $10,000,000
Building Permit — valuation $10,000,001 and up$33,958.75 for the first $10,000,000, plus $2.00 for each additional $1,000 or fraction thereof
Plan Check Fee25% of the base Building Permit FeeConfirmed on both the City of Buhl Application for Building Permit and the Demolition Permit Application (office-use fee section)

Demolition Permit

Verified

Required for demolition of any structure in Buhl. Uses a dedicated application form (site plan, parcel information, scope of work, estimated value) with fees calculated on the same valuation-based Building Permit fee schedule plus a 25% Plan Check Fee.

Verified 2026-07-07 · Source

Requirements

  • Electronic PDF of plans and permit (emailed to the Building Department)
  • Scaled site plan showing north arrow/scale, dimensioned location of proposed and existing structures, street frontage dimensions and street names, and right-of-way
  • Parcel number, subdivision/block/lot or section/township/range
  • Zoning district, type of use, number of dwelling units being demolished, number of stories, building height, existing building area (square feet), scope of work, and estimated value
  • Notify City Hall as soon as demolition is completed, providing as much advance notice as possible

Required documents

  • RequiredDemolition Permit ApplicationCity of Buhl Building Department 3-page application including property/contractor information, site plan requirements, property/project details, and an office-use permit fee section

Fee schedule

Fee typeAmountNotes
Demolition Permit — base fee based on estimated value of workCalculated using the same valuation-based Building Permit Fee Schedule as new constructionPer the Demolition Permit Application's Office Use Only fee section: Valuation of Work, Permit Fee, and Plan Check Fee (25% of Permit Fee) are itemized identically to the general Building Permit; no separate flat demolition fee is published
Plan Check Fee25% of the Demolition Permit FeeCity of Buhl Demolition Permit Application, Office Use Only fee section

Sign Permit

Verified

Required for erecting, moving, constructing, altering, or enlarging any sign in Buhl. Electrical signs additionally require an electrical permit. No permit is required for routine sign maintenance. Governed by Buhl Municipal Code Title 9, Chapter 14 (Signs and Billboards).

Verified 2026-07-20 · Source

Requirements

  • Required for any new sign, or moving/constructing/altering/enlarging an existing sign
  • Electrical signs require an additional electrical permit (issued by the State of Idaho DOPL)
  • No permit required for sign maintenance
  • Authorized work under a sign permit must be completed within 180 days of issuance
  • Short-term signs or banners placed across streets, highways, sidewalks, or alleys require a separate permit from the City Clerk-Treasurer's Office and must be timely removed per the permit's display period
  • Application made on forms furnished by the Building Inspector

Required documents

  • RequiredSign Permit ApplicationApplication furnished by the Buhl Building Inspector; accompanied by information necessary to ensure compliance with applicable laws and regulations

Fee schedule

Fee typeAmountNotes
Sign Permit Fee (valuation-based, per City Building Permit Fee Schedule)$23.50 minimum (for $1-500 estimated sign value), scaling per the City's tiered Building Permit Fee Schedule table (e.g. $69.25 at $2,000; $181.25 at $10,000; $391.25 at $25,000)Confirmed directly from the City's own Sign Permit Application form (item 12, 'Estimated Value', and the form's own 'PERMIT FEES' block: 'Valuation of Work / Permit Fee / Plan Check Fee (50% of permit fee) / Copies / Total Fees' — all blank fields computed at issuance, not a printed flat fee), read together with Municipal Code 9-14-7(D) ('fees for permitted signs shall be as outlined in the fee schedule of the Building Code') and the City's published Building Permit Fee Schedule PDF (1997 Uniform Code valuation table).
Plan Check Fee50% of the Permit FeeStated directly on the City's Sign Permit Application form's own Permit Fees block, distinct from the general Building Permit's Plan Review Fee percentage (documented elsewhere in this file for other permit types).

Manufactured Home Permit (In Park and On Permanent Foundation)

Required for placement of a manufactured/mobile home within Buhl, whether sited in a manufactured home park or set on a permanent foundation. Listed by the City of Buhl Building Department as one of its own permit types, alongside residential/commercial building, roof, fence, demolition, occupancy, sign, and solar permits.

Reviewed 2026-07-07 · Source

Requirements

  • Applies to manufactured/mobile homes placed in a manufactured home park or on a permanent foundation within city limits
  • Foundation and site work fall under the City's building permit and valuation-based fee schedule
  • Electrical connection and utility hookups are subject to separate State of Idaho DOPL electrical permitting

Required documents

  • RequiredBuilding Permit ApplicationCity of Buhl's standard building permit application is used for manufactured home placement, with scope of work described as manufactured home installation

Fee schedule

Fee typeAmountNotes

Photovoltaic Project Permit

Verified

Required for installation of roof- or ground-mounted photovoltaic array systems in Buhl. The City publishes a dedicated Photovoltaic Project Permit Application with a detailed submittal checklist; the City of Buhl oversees the structural building permit only, billed under the standard 1997 Uniform Code valuation-based fee table (no distinct solar/PV fee line), while electrical, mechanical, and plumbing work require separate permits from the Idaho Division of Occupational & Professional Licenses (IDOPL), which have their own fee schedules.

Verified 2026-07-20 · Source

Requirements

  • Contact Idaho Power before starting a solar project regarding the net metering application (Scott Gates, 208-888-2518 or netmetering@idahopower.com); Idaho Power conducts a system test after the system passes the State electrical inspection
  • Separate applications and fee schedules are required for electrical, mechanical, and plumbing work — obtained through the Idaho Division of Occupational & Professional Licenses (IDOPL), not the City
  • Panels and modules must be installed by a certified contractor; the State of Idaho requires a licensed electrical journeyman to complete installation beyond the converter box/AC combiner box
  • Site plan required showing the PV array location/layout, electrical equipment (service, sub-panels, back-fed panels, disconnects, inverters, battery backup), outside conduit routes, and the required Rapid Shutdown Device location per NEC 690.12
  • Roof plan required showing dimensions from the array to roof ridges/valleys/hips/edges, with required setbacks and access pathways (e.g., hip roofs: 3' wide clear access pathway from eave to ridge on each slope with panels)
  • Structural analysis stamped by a licensed Idaho Structural Engineer required, based on International Existing Building Code Article 1103.1 (Additional Gravity Loads)
  • Comprehensive one-line electrical diagram required per NEC Article 690 (General Requirements, Circuit Requirements, Disconnecting Means, Wiring Methods, Grounding, Marking, Connection to Other Sources, Energy Storage Systems), including Point of Connection type and NEC 705 load calculations
  • Equipment submittals (manufacturer specs, UL listings) required for all PV equipment, racking, and grounding systems
  • Pictures of existing service equipment (covers on and off) required, showing existing wiring and data labels
  • Rough-In (midpoint) and Final inspections required

Required documents

  • RequiredPhotovoltaic Project Permit ApplicationCity of Buhl Building Department's dedicated solar application form with attached submittal checklist
  • RequiredSite Plan and Roof PlanMinimum 11x17 paper, showing PV array location, electrical equipment, setbacks, and required access pathways
  • RequiredStructural AnalysisStamped by a licensed Idaho Structural Engineer per IEBC Article 1103.1
  • RequiredOne-Line Electrical DiagramPer NEC Article 690, with Point of Connection and NEC 705 load calculations
  • RequiredEquipment Submittals and Existing Service Equipment PhotosManufacturer specification sheets, UL listings, and photos of the existing service panel with covers on/off

Fee schedule

Fee typeAmountNotes
Building Permit — valuation $1 to $500 (structural/racking portion)$23.50City of Buhl Building Permit Fee Schedule, based on the 1997 Uniform Code fee table; no distinct solar/PV line item — the Photovoltaic Project Permit Application confirms 'the cost depends on the project value for your specific project. See our fee schedule.'
Building Permit — valuation $2,001 to $25,000$69.25 for the first $2,000, plus $14.00 for each additional $1,000 or fraction thereof, to and including $25,000City of Buhl Building Permit Fee Schedule (typical residential rooftop PV valuation range)
Plan Check Fee25% of permit feePhotovoltaic Project Permit Application, 'Office Use Only' fee block
Electrical, Mechanical, Plumbing PermitsSeparate fee schedules, not set by the CityObtained through the Idaho Division of Occupational & Professional Licenses (IDOPL), https://web.dbs.idaho.gov/etrakit3/, 208-334-3233

EV Charger / EVSE Permit

Verified

Installation of an electric vehicle charger (EVSE) at a Buhl property is electrical work, and the City of Buhl does not issue electrical permits at all — per the City's own Building Department webpage, separate permits for electrical, plumbing, heating, ventilation, and air conditioning work are issued directly by the State of Idaho Division of Occupational and Professional Licenses (DOPL), not the City of Buhl. There is no City-issued EV-charger-specific permit or fee.

Verified 2026-07-20 · Source

Requirements

  • Electrical permit obtained directly through the Idaho Division of Occupational and Professional Licenses (DOPL) Building Safety Program, not the City of Buhl
  • Idaho-licensed electrical contractor required
  • Dedicated branch circuit sized to EVSE manufacturer specifications, complying with the applicable NEC edition adopted by the State of Idaho
  • If the EVSE installation involves other City-permitted work (e.g., a new equipment enclosure), a separate City of Buhl building permit for that portion may still apply

Required documents

  • RequiredIdaho DOPL Building Safety Electrical Permit ApplicationState-issued electrical permit application (via the DOPL eTrakit3 portal); the City of Buhl has no local equivalent

Fee schedule

Fee typeAmountNotes
State Electrical Permit FeeSet by the Idaho Division of Occupational and Professional Licenses (DOPL) Building Safety Program, not the City of BuhlConfirm current state fee schedule via DOPL's eTrakit3 portal; no City-level fee applies to the EVSE circuit itself

Sources & verification

Verified against official sources. Last reviewed 2026-07-13.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Buhl building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-07-07)View current record →All versions →

Permalink: /idaho/twin-falls-county/buhl/as-of/2026-07-13/

Snapshot date: 2026-07-13

Commit: 50721e4

Reproducible from PermitBase’s version-controlled dataset, commit 50721e4.