Skip to main content
PermitBase

Version history — Buhl, Idaho

This is PermitBase’s own verified record for Buhl, reconstructed from this dataset’s version-controlled history. Each version below reflects what our record stated as of that date — it is not a warranty of what Buhl’s actual law was at that time.

Permanent link to today’s record

/idaho/twin-falls-county/buhl/as-of/2026-08-02/

Look up a specific date

Pick a date and we’ll show you the record as it stood then.

All versions

  • 2026-08-02Current record
    • Buhl, Idaho — Building Permit (Commercial New Construction, Additions, Remodels, Tenant Improvements, Repairs) record added
    • Buhl, Idaho — Building Permit (Residential New Construction, Additions, Remodels, Repairs) fee record updated: 25% of the base Building Permit Fee → 50% of the Building Permit Fee, not to exceed 65% of the Building Permit Fee
    • Buhl, Idaho — Demolition Permit fee record updated: 25% of the Demolition Permit Fee → 50% of the Demolition Permit Fee, not to exceed 65%
    • Buhl, Idaho — Photovoltaic Project Permit fee record updated: 25% of permit fee → 50% of permit fee, not to exceed 65%
  • 2026-07-20Superseded
    • Buhl, Idaho — Sign Permit fee record added: Sign Permit Fee (valuation-based, per City Building Permit Fee Schedule) ($23.50 minimum (for $1-500 estimated sign value), scaling per the City's tiered Building Permit Fee Schedule table (e.g. $69.25 at $2,000; $181.25 at $10,000; $391.25 at $25,000))
    • Buhl, Idaho — Sign Permit fee record added: Plan Check Fee (50% of the Permit Fee)
    • Buhl, Idaho — EV Charger / EVSE Permit record added
    • Buhl, Idaho — Photovoltaic Project Permit record added
  • 2026-07-13Superseded
  • 2026-07-07Initial record — coverage of Buhl began