Polson building inspections
VerifiedInspection sequence, scheduling, and re-inspection fees for building permits in Polson, Montana.
Verified 2026-07-04 · Source
How to schedule
Inspections are requested through the building department below.
- Address
- 106 1st Street East, Polson, MT 59860
- Phone
- (406) 883-8214
- bp@cityofpolson.com
- Office hours
- City Hall main line (406) 883-8200, fax (406) 883-8238. Building Official: Lynda Benson, (406) 883-8216. Community Development Director: Rob Edington, (406) 883-8213. Applications may be submitted by mail (City of Polson, 106 1st Street East, Polson, MT 59860) or by email to bp@cityofpolson.com. The City also directs applicants to apply online at GovWell.com.
- Website
- Official site
Inspection sequence
Applies to: Zoning Conformance & Building Permit (New Construction / Addition / Remodel)
- 1
Foundation
Before concrete pour, per department inspection sheet requirements
- 2
Framing
Structural framing per approved plans before walls are closed
- 3
Final
Completed work verified against approved plans; a Certificate of Compliance and Occupancy is issued only after the department inspection sheet is submitted and signed off by each required department
Applies to: Electrical Permit
- 1
Rough-In
Wiring, box placement, and service connections before walls are closed
- 2
Final
Devices installed, panel labeled, protections verified per 2020 NEC
Applies to: EV Charger / EVSE Permit
- 1
Rough-In
EVSE circuit wiring, box placement, and service connections before walls are closed
- 2
Final
Charger installed, circuit labeled, protections verified per 2020 NEC
Applies to: Mechanical / HVAC Permit
- 1
Rough-In
Ductwork, gas piping, and mechanical equipment rough-in before walls closed
- 2
Final
Equipment operational, clearances and venting verified
Applies to: Plumbing Permit
- 1
Rough-In
After pipes installed, before walls closed
- 2
Final
All fixtures connected, water heater and venting verified, no leaks
Applies to: Solar Photovoltaic (PV) Permit
- 1
Rough Electrical
Conduit runs, wire sizing, and disconnect placement before energizing
- 2
Final
Final electrical/building inspection preceding sign-off
Final inspection only: Certificate of Occupancy / Change of Use Permit
Sources & verification
Verified against official sources. Last reviewed 2026-07-04.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Polson building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Polson building permits
Get alerts for Polson
We'll email you when Polson's fees, documents, or codes change — not often.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.