Certificate of Occupancy / Change of Use Permit — Polson, Montana · Requirements sheet
Verified 2026-07-22 · Source: https://www.cityofpolson.com/media/10571
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Certificate of Occupancy / Change of Use Permit in Polson, Montana
Required when a structure's business use changes or a Certificate of Occupancy is needed, using the City's single combined 'Application for Certificate of Occupancy/Change of Use' form. The currently effective Planning and Public Works Fee Schedule (2026-01-15) separately lists 'Certificate of Occupancy' and 'Change of Use Permit' as two distinct $100 line items under Planning fees, even though the City's own application form is one combined document listing a single $100 fee.
Verified 2026-07-22 · Source
When you need this permit
- Application required for a Certificate of Occupancy and/or a Change of Use within a structure in Polson, using the combined 'Application for Certificate of Occupancy/Change of Use' form
- Applicant must provide business site address, mailing address, contractor/agent, property owner, legal description (subdivision/block/lot), lot size, zoning district, type of business proposed, previous business/use located in the structure, total square footage, number of stories, and type of construction (structural & exterior walls)
- Two (2) detailed site plans required, showing scale (preferred 1 inch = 20 feet), north arrow, lot boundaries with dimensions, location of existing/proposed roads and driveways, interior floor plan (rooms, halls, doorways with dimensions), distances of existing/proposed structures to property boundaries (property pins evident or survey retracement completed), and lettered/numbered identification of each existing and proposed structure
- Applicant grants permission for members of the Polson Building Department, Fire Department, or their designated agents to enter the property to evaluate the application and any resulting construction
- A separate sign permit and fee applies if new signage is part of the change — the application form explicitly flags 'Sign appl (separate appl/fee)'
- Incomplete or erroneous applications will be returned to the applicant
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
City of Polson Planning and Public Works Fee Schedule (effective January 15, 2026), Other Planning Fees section: 'Certificate of Occupancy $100'. Show full citationHide
City of Polson Planning and Public Works Fee Schedule (effective January 15, 2026), Other Planning Fees section: 'Certificate of Occupancy $100'. This 2026 schedule lists Certificate of Occupancy and Change of Use as two separate $100 line items even though the City's own application form combines both into one document with one stated $100 fee — this discrepancy is reported here rather than silently reconciled; a project needing both a COO and a Change of Use determination may be charged $100 for each per the current fee schedule, though the single combined application form does not itself clarify this.Review timeline
Inspection process
- 1
Site/Occupancy Evaluation
The application grants permission for the Polson Building Department, Fire Department, or their designated agents to enter the property to evaluate the application and any resulting construction; no further inspection sequence is published specifically for this permit type
See the full Polson inspection guide — scheduling & re-inspection fees →
Tips
- This is ONE combined application covering both a Certificate of Occupancy and a Change of Use, with a single $100 fee printed on the form itself — but the currently effective 2026 Planning and Public Works Fee Schedule lists 'Certificate of Occupancy' and 'Change of Use Permit' as two separate $100 line items, so confirm with Community Development whether your specific project is billed once or twice.
- If your change of use includes new signage, budget for a separate Sign Permit application and fee — the COO/Change of Use form itself flags this as a distinct process.
- Both the Building Department and Fire Department are granted entry rights under this application to evaluate the property, reflecting the combined building-code and fire-safety review built into a change-of-use determination.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-22.
Fee schedules
Applications & forms
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Polson building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Polson's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Polson yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Polson lands. Privacy.
Other permits in Polson
Compare certificate of occupancy / change of use permit fees across Montana →
Look up this fee in a different city →
Now live
Build your Polson project checklist
Describe your project once and get every permit, document, and fee it triggers in Polson — in one checklist. Free, for any city and any number of projects.
Get started →