Plumbing Permit in Polson, Montana

Required for plumbing installation, alteration, or repair work in Polson, governed by the 2021 Uniform Plumbing Code (UPC) per Title 50, Chapter 60, Section 505, MCA and ARM 24.301.301/.361. Polson is a Montana DLI-certified jurisdiction for plumbing permitting.

Verified 2026-07-04 · Source

When you need this permit

  • Plumbing permit required for installation, alteration, or repair of plumbing fixtures, water/sewer service, water heaters, gray water systems, medical gas piping, and related systems, per Title 50, Chapter 60, Section 505, MCA and ARM 24.301.301 and ARM 24.301.361
  • Application requires accurate location and owner information, 17-digit geocode, parcel/lot/section/township/range, type of building, type of work, sewer service type (public sewer or septic), and potable water source
  • Fee computed from an itemized 'Schedule of Fees' table (per-fixture and per-service-type line items)
  • Master Signature required; incomplete applications will be returned unprocessed

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Each Permit (base fee, except water heater replacement)City of Polson Building Department Fee Schedule / Application for Plumbing Permit
$35.00
Gray water system, commercial or residentialCity of Polson Building Department Fee Schedule
$75.00
Repair or alteration of drainage or vent pipingCity of Polson Building Department Fee Schedule
$10.00
Installation, alteration, or repair of water piping and/or treatmentCity of Polson Building Department Fee Schedule
$10.00
Water service tie-in (each)City of Polson Building Department Fee Schedule
$10.00
Building and trailer sewer tie-in (each)City of Polson Building Department Fee Schedule
$15.00
Water heater (or replacement), eachCity of Polson Building Department Fee Schedule / Application for Plumbing Permit
$10.00
Storm drain or storm drainage, eachCity of Polson Building Department Fee Schedule
$10.00
Lawn sprinkler, fire protection system, any meter, or backflow protection device, eachCity of Polson Building Department Fee Schedule
$10.00
1-4 hose bibb, unprotected fixture, vacuum breaker, and/or backflow protection, eachCity of Polson Building Department Fee Schedule
$7.00
5+ hose bibb, unprotected fixture, vacuum breaker, and/or backflow protection, each (beyond the first 4)City of Polson Building Department Fee Schedule; example given on the application form: 5 hose bibbs total = $30
$2.00
Industrial water pre-treatment equipment including drainage and vent, eachCity of Polson Building Department Fee Schedule
$10.00
Medical gas piping system, first 5 units (oxygen, nitrogen, vacuum, medical air)City of Polson Building Department Fee Schedule / Application for Plumbing Permit
$75.00
Medical gas piping system, each additional unit after initial fiveCity of Polson Building Department Fee Schedule
$10.00
Plumbing fixture or trap, eachCity of Polson Building Department Fee Schedule / Application for Plumbing Permit
$13.00

Review timeline

Plan reviewTypical estimate — confirm current times with the Polson building department
~Up to 10 business days

How long did your Plumbing Permit permit actually take in Polson?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough-In

    After pipes installed, before walls closed

  2. 2

    Final

    All fixtures connected, water heater and venting verified, no leaks

See the full Polson inspection guide — scheduling & re-inspection fees →

Tips

  • Montana uses the Uniform Plumbing Code (UPC), not the International Plumbing Code.
  • Polson is a Montana DLI-certified jurisdiction for plumbing (P) permitting within city limits.
  • The 17-digit GEOCODE and confirmation of whether the job is located within city limits are both required fields on the application — plumbing work just outside city limits may route to the state DLI Building Codes Bureau rather than the City.
  • Water heater replacement costs $10.00 per unit under the itemized fee schedule.

Frequently asked questions

Yes. A plumbing permit is required at $10.00 per water heater (or replacement), per the City of Polson's itemized plumbing fee schedule printed on the Application for Plumbing Permit.

In Polson, the published Each Permit (base fee, except water heater replacement) is: $35.00. Additional published fees: Gray water system, commercial or residential — $75.00; Repair or alteration of drainage or vent piping — $10.00; Installation, alteration, or repair of water piping and/or treatment — $10.00; Water service tie-in (each) — $10.00; Building and trailer sewer tie-in (each) — $15.00; Water heater (or replacement), each — $10.00; Storm drain or storm drainage, each — $10.00; Lawn sprinkler, fire protection system, any meter, or backflow protection device, each — $10.00; 1-4 hose bibb, unprotected fixture, vacuum breaker, and/or backflow protection, each — $7.00; 5+ hose bibb, unprotected fixture, vacuum breaker, and/or backflow protection, each (beyond the first 4) — $2.00; Industrial water pre-treatment equipment including drainage and vent, each — $10.00; Medical gas piping system, first 5 units (oxygen, nitrogen, vacuum, medical air) — $75.00; Medical gas piping system, each additional unit after initial five — $10.00; Plumbing fixture or trap, each — $13.00. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Plan review for a plumbing permit in Polson typically runs Up to 10 business days. This is an estimate, not a published figure — confirm current review times with City of Polson Building Department (Planning & Building Department) at (406) 883-8214.

You'll need: Application for Plumbing Permit. See the required-documents checklist on this page for details on each.

Polson requires 2 inspection(s) for a plumbing permit, in order: Rough-In, Final. Schedule each through City of Polson Building Department (Planning & Building Department) ((406) 883-8214).

Apply through City of Polson Building Department (Planning & Building Department) at 106 1st Street East, Polson, MT 59860. Phone: (406) 883-8214, email: bp@cityofpolson.com. Office hours: City Hall main line (406) 883-8200, fax (406) 883-8238. Building Official: Lynda Benson, (406) 883-8216. Community Development Director: Rob Edington, (406) 883-8213. Applications may be submitted by mail (City of Polson, 106 1st Street East, Polson, MT 59860) or by email to bp@cityofpolson.com. The City also directs applicants to apply online at GovWell.com.. Official information: https://www.cityofpolson.com/building.

Polson, Montana has adopted: Montana has a mandatory statewide building code administered by the Montana Department of Labor & Industry (DLI) Building Codes Bureau, amended by the Administrative Rules of Montana (ARM) Title 24, Chapter 301. Cities, counties, and towns may become 'certified' to locally administer permitting and inspection for all or part of the code; a certified local program's adopted code 'may include only codes adopted by the Building Codes Bureau' (ARM 24.301.202). Non-certified trades/areas fall under direct state administration by the DLI Building Codes Bureau. Source: Montana DLI Building Codes Bureau, Certified City, County and Town Programs (bsd.dli.mt.gov/_docs/building-codes-permits/certified-city.pdf, updated 04/22/2026).; Polson is a Montana DLI-certified jurisdiction for Building (B), Plumbing (P), Electrical (E), and Mechanical (M) — but explicitly NOT Swimming Pool (SP) — within Polson city limits. Certified program contact on file with DLI: 'Office', (406) 883-8214. Source: Montana DLI Building Codes Bureau, 'Montana Certified Local Government Program' roster (bsd.dli.mt.gov/_docs/building-codes-permits/certified-city.pdf, updated 04/22/2026), row 'Polson | B, P, E, M | Office | 883-8214 | City Limits'. Directly fetched and text-extracted from the PDF during this research pass (2026-07-04); no 'SP' designation appears for Polson in the roster, unlike Darby, Hamilton, Manhattan, and other full-trade-certified Montana towns in this same roster which explicitly list 'SP'. No separate Lake County-level DLI certification row exists in the roster (the county itself is not a certified jurisdiction), so there is no competing county-level certification for areas outside Polson city limits.; 2021 International Building Code (IBC), as amended by ARM 24.301.131 — per City of Polson Standards for Design & Construction page (Montana Building Codes / International Code Council list); 2021 International Residential Code (IRC), as amended by ARM 24.301.154 — per City of Polson Standards for Design & Construction page; 2021 International Energy Conservation Code (IECC), as amended by ARM 24.301.161 — per City of Polson Standards for Design & Construction page; 2021 International Existing Building Code (IEBC), as amended by ARM 24.301.171 — per City of Polson Standards for Design & Construction page; 2021 International Mechanical Code (IMC), as amended by ARM 24.301.172 — per City of Polson Standards for Design & Construction page; also cited directly on the City's Mechanical Permit Application ('Title 50, Chapter 60, Section 104, MCA and ARM 24.301.172'); 2021 International Fuel Gas Code (IFGC), as amended by ARM 24.301.173 — per City of Polson Standards for Design & Construction page; 2021 International Swimming Pool and Spa Code (ISPSC), as amended by ARM 24.301.175 — per City of Polson Standards for Design & Construction page. Note: this code is listed among Montana's statewide-adopted codes referenced by the City's own Standards page, but Polson is NOT DLI-certified for Swimming Pool (SP) permitting — see codesAdopted certification note above; pool-specific permitting/inspection is understood to route to the state DLI Building Codes Bureau rather than being issued locally by Polson.; 2021 Uniform Plumbing Code (UPC), as amended by ARM 24.301.301 — per City of Polson Standards for Design & Construction page; also cited directly on the City's Plumbing Permit Application ('Title 50, Chapter 60, Section 505, MCA and ARM 24.301.301 and ARM 24.301.361'). Montana uses the Uniform Plumbing Code, not the International Plumbing Code.; 2020 National Electrical Code (NEC) — effective statewide June 11, 2022 per Montana DLI Building Codes Bureau Current Codes summary; cited directly on the City of Polson Electrical Permit Application ('Title 50, Chapter 60, Section 604, MCA and ARM 24.301.431'). Not separately listed on the City's own Standards for Design & Construction code list (which enumerates only ICC/UPC family codes), but confirmed via the statewide DLI source and the City's own electrical permit application form citation.; All codes verified directly against the City of Polson 'Standards for Design & Construction' page (Montana Building Codes / International Code Council section), https://www.cityofpolson.com/building/page/standards-design-construction, fetched and read directly during this research pass (2026-07-04).. Local amendments apply — see the Polson overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-04.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Polson building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.