Inspection sequence, scheduling, and re-inspection fees for building permits in City of Deer Lodge, Montana.

Verified 2026-07-06 · Source

How to schedule

Inspections are requested through the building department below.

Address
300 Main Street, Deer Lodge, MT 59722 (city Building Permits); Building Codes Bureau, PO Box 200517, Helena, MT 59620-0517 (state electrical/plumbing/mechanical permits)
Phone
(406) 310-6965 (Sean Beach, Building Inspector) / (406) 846-2238 (City Hall main line, fax 406-846-3925) / (406) 841-2056 (State Building Codes Bureau — electrical, plumbing, mechanical)
Office hours
Monday - Friday 8:00 AM - 5:00 PM, closed weekends and holidays

Published scheduling rules

  • A plumbing inspection must be requested and conducted before any plumbing work is covered (Plumbing Permit)

Inspection sequence

Applies to: Mechanical / HVAC Permit

  1. 1

    Gas Piping Pressure Test

    Required before concealing gas piping; 48 hours' notice required

  2. 2

    Rough-In

    Ductwork and mechanical equipment rough-in before walls closed

  3. 3

    Final

    Equipment operational, combustion air and venting verified

Applies to: Electrical Permit

  1. 1

    Rough-In

    Must be requested with 48 hours' notice before covering up work

  2. 2

    Final

    All devices installed, panel labeled, system energized; requires 48 hours' notice

Applies to: EV Charger / EVSE Permit (State-Issued Electrical Permit)

  1. 1

    Rough-In

    Must be requested with 48 hours' notice before covering up work

  2. 2

    Final

    Charger circuit/outlet installed, GFCI/breaker sized correctly, energized; requires 48 hours' notice

Applies to: Fire Sprinkler / Fire Alarm Permit (No Standalone Product — Folded Into the Commercial Building Permit and State Electrical Permit)

  1. 1

    Commercial Building / Fire Protection System Rough-In

    Where a sprinkler or alarm system is required under IBC Chapter 9, rough-in is inspected as part of the State Commercial Building Permit's inspection sequence, not as a separate fire-specific inspection product

  2. 2

    Electrical Final (Fire Alarm Wiring)

    Fire alarm control panel/wiring final inspection performed under the State Electrical Permit, requiring 48 hours' notice per this file's electrical-permit entry

Applies to: Plumbing Permit

  1. 1

    Rough-In

    Must be requested and conducted before covering any portion of plumbing work

  2. 2

    Final

    All fixtures connected, no leaks, proper venting verified

Applies to: Solar PV / Alternative Energy Permit (State-Issued)

  1. 1

    Rough-In (Electrical)

    Conduit runs, wire sizing, disconnect placement before covering/energizing; must be requested with 48 hours' notice

  2. 2

    Final Interconnection

    Per the state application form, a licensed electrical contractor must obtain and complete an additional permit/inspection for the final grid-tied utility connection before Permission to Operate

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the City of Deer Lodge building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

City of Deer Lodge building permits

Get alerts for City of Deer Lodge

We'll email you when City of Deer Lodge's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.