Plumbing Permit in Hamilton, Montana

Required for plumbing installation, alteration, or repair work in Hamilton, governed by the 2021 Uniform Plumbing Code (UPC) as adopted by the City. Hamilton is a Montana DLI-certified jurisdiction for plumbing permitting. Work must be performed by a licensed Master Plumber.

Verified 2026-07-03 · Source

When you need this permit

  • Plumbing permit required for installation, alteration, or repair of plumbing fixtures, water/sewer service, water heaters, and related systems
  • Work must be performed by a licensed Montana Master Plumber holding a current Hamilton business license, per Title 50, Chapter 60, Section 505, MCA and ARM 8.70.302-.305
  • Permit becomes null and void if authorized work has not commenced within 180 days or the permit expiration date
  • 24 hours' notice required to schedule all plumbing inspections, at (406) 363-3316
  • Schedule of plumbing fixtures (bath tub, lavatory, shower, water closet, kitchen sink, etc.) must be itemized on the application

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Requested plumbing inspection feeCity of Hamilton Plumbing Permit Application, Note 1, Amended Schedule of Plumbing Permit Fees effective 1/1/2015
$75 (for services under 1 hour); $35 per additional 30-minute increment beyond 1 hour; travel/per diem may be charged at the State of Montana's existing rate
Re-inspection feeCity of Hamilton Plumbing Permit Application, Note 2
$45 (or the original permit fee if that amount does not exceed $30)
Per-fixture/per-item fees (fixture/trap, water service, sewer, storm drain, water heater new/replacement, backflow devices, sprinkler systems, etc.)The Plumbing Permit Application includes an itemized 'Schedule of Plumbing Fixtures' (Quantity x Cost = Total) covering each fixture/trap, water service, sewer fee, storm drain, water heater, treatment equipment, and sprinkler/backflow items, but the per-item dollar rates are entered on a fillable form field that did not carry a printed rate in the extracted document — only the line-item names extracted, not the associated dollar figures. Chase trail: fetched the PDF directly (Amended Schedule of Plumbing Permit Fees effective 1/1/2015) via curl and extracted text with pypdf; the rate column did not resolve to visible text (likely a form-fill table or scanned rate column not captured by the text layer). Left null rather than inventing a plausible per-fixture rate; confidence for this specific line-item pricing is unverified. The $75 inspection fee and $45 re-inspection fee (Notes 1-2) ARE printed as plain text and are verified above.
Not published — contact the department
Double Fee PenaltyCity of Hamilton Plumbing Permit Application, Note 3, citing Section 50-6-509, MCA
Fee doubled if work commences before permit application/fee submittal

Review timeline

Plan reviewTypical estimate — confirm current times with the Hamilton building department
~10–10 business days

How long did your Plumbing Permit permit actually take in Hamilton?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough-In

    After pipes installed, before walls closed; requires 24 hours' notice to schedule

  2. 2

    Final

    All fixtures connected, water heater and venting verified, no leaks

See the full Hamilton inspection guide — scheduling & re-inspection fees →

Tips

  • Montana uses the Uniform Plumbing Code (UPC), not the International Plumbing Code.
  • Hamilton is a Montana DLI-certified jurisdiction for plumbing (P) permitting within city limits.
  • 24 hours' notice is required for all plumbing inspections — call (406) 363-3316 to schedule.
  • A licensed Master Plumber must sign the application and perform the work; the permit becomes void if work has not commenced within 180 days of issuance.

Frequently asked questions

Yes. A plumbing permit performed by a licensed Master Plumber is required; 'Water heater – new or replacement' is a listed line item on the City of Hamilton Schedule of Plumbing Fixtures. The specific dollar rate for this line item was not resolvable from the published fee schedule PDF (see chase trail); contact the Building Department at (406) 363-3316 for the current rate.

In Hamilton, the published Requested plumbing inspection fee is: $75 (for services under 1 hour); $35 per additional 30-minute increment beyond 1 hour; travel/per diem may be charged at the State of Montana's existing rate. Additional published fees: Re-inspection fee — $45 (or the original permit fee if that amount does not exceed $30); Double Fee Penalty — Fee doubled if work commences before permit application/fee submittal. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Plan review for a plumbing permit in Hamilton typically runs 10–10 business days. This is an estimate, not a published figure — confirm current review times with City of Hamilton Building Department at (406) 363-3316.

You'll need: Plumbing Permit Application. See the required-documents checklist on this page for details on each.

Hamilton requires 2 inspection(s) for a plumbing permit, in order: Rough-In, Final. Schedule each through City of Hamilton Building Department ((406) 363-3316).

Apply through City of Hamilton Building Department at 920 New York Ave, Hamilton, MT 59840. Phone: (406) 363-3316, email: dpwsec@cityofhamilton.net. Office hours: City Hall: 223 S. 2nd Street, Hamilton, MT 59840, main line (406) 363-2101. Building Department / Public Works office: 920 New York Ave, (406) 363-3316 or (406) 363-6717. Building Inspector Tim Netzley: (406) 880-5832, inspector@constructmt.com. Inspection scheduling line: (406) 552-3238. Inspections scheduled Monday & Wednesday 1pm-4pm and Fridays 8am-12pm per the Roof Permit Application; 24 hours' notice required for plumbing inspections per the Plumbing Permit Application.. Official information: https://www.cityofhamilton.net/departments/building_department/index.php.

Hamilton, Montana has adopted: Montana has a mandatory statewide building code administered by the Montana Department of Labor & Industry (DLI) Building Codes Bureau, amended by the Administrative Rules of Montana (ARM) Title 24, Chapter 301. Cities, counties, and towns may become 'certified' to locally administer permitting and inspection for all or part of the code; a certified local program's adopted code 'may include only codes adopted by the Building Codes Bureau' (ARM 24.301.202). Non-certified areas fall under direct state administration by the DLI Building Codes Bureau. Source: Montana DLI Building Codes Bureau, Certified City, County and Town Programs (bsd.dli.mt.gov/_docs/building-codes-permits/certified-city.pdf, updated 04/22/2026).; Hamilton is a Montana DLI-certified jurisdiction for Building (B), Plumbing (P), Mechanical (M), Electrical (E), and Swimming Pool (SP) — full-trade certification — within Hamilton city limits. Certified program contact on file with DLI: Tim Netzley, (406) 880-5832. Source: Montana DLI Building Codes Bureau, 'Certified City, County and Town Programs' roster (bsd.dli.mt.gov/_docs/building-codes-permits/certified-city.pdf, updated 04/22/2026), row 'Hamilton — B, P, M, E, SP — Tim Netzley — 880-5832 — City Limits'. Directly verified by fetching and OCR-extracting the PDF text during this research pass (2026-07-03).; 2021 International Building Code (IBC) — adopted by City of Hamilton per the Building Department's Adopted Codes list on the Residential Building Permit Application; 2021 International Residential Code (IRC) — adopted by City of Hamilton (referenced on the permit application as '2021 International Residential Building Code'); 2021 International Existing Building Code (IEBC) — adopted by City of Hamilton; 2021 International Mechanical Code (IMC) — adopted by City of Hamilton; 2021 International Fuel Gas Code (IFGC) — adopted by City of Hamilton; 2021 International Energy Conservation Code (IECC) — adopted by City of Hamilton; 2021 Uniform Plumbing Code (UPC) — adopted by City of Hamilton (Montana uses the Uniform Plumbing Code, not the International Plumbing Code); 2020 National Electrical Code (NEC) — adopted by City of Hamilton; 2021 International Swimming Pool and Spa Code (ISPSC) — adopted by City of Hamilton; consistent with Hamilton's DLI Swimming Pool (SP) certification; 2017 ICC A117.1 Accessibility — adopted by City of Hamilton; All codes listed verbatim on the City of Hamilton 2023 Residential Building Permit Application, page 2 ('All construction shall comply with the minimum requirements of the following codes'). Source: City of Hamilton Residential Building Permit Application (PDF).. Local amendments apply — see the Hamilton overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-03.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Hamilton building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.