Provisional Building Permit (Temporary/Accessory Structures) — West Wendover, Nevada · Requirements sheet
Verified 2026-07-03 · Source: https://www.westwendovercity.com/services/resources-and-forms-online/-folder-174
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Provisional Building Permit (Temporary/Accessory Structures) in West Wendover, Nevada
Covers temporary accessory structures (e.g., sheds) up to 200 sq ft and 12 feet in height, placed within side and rear yard setbacks, potentially over public utility easements. Governed by West Wendover City Code 8-5A-6(C). Not available for front or exterior side yard setbacks; structures must not include permanent surface treatments.
Verified 2026-07-03 · Source
When you need this permit
- Structure limited to R-3 occupancy only, maximum 12 feet height, maximum 200 square feet, single story
- Not permitted within front or exterior side yard setbacks
- No permanent surface treatments (concrete pads, asphalt paving, affixed decking) allowed under this permit
- May require review of current or future use of public utility/access easements associated with the property; the City may or may not allow placement over an active/inactive easement
- Site plan (scale no less than 1/8" = 1'), structure design/specifications (installation/erection instructions or cut sheets for prefabricated structures, or detailed construction drawings if built on-site), and engineered drawings/calculations for anchoring or spot footings (stamped by a Nevada licensed Structural Engineer) required
- Permit may be revoked at any time by the City for non-compliance or to protect public utility access/operation
- All permit fees due and payable at time of Provisional Building Permit issuance
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 3 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Building Official Inspection
The Building Official or representative inspects all work prior to concealment; 24-hour advance notice required
See the full West Wendover inspection guide — scheduling & re-inspection fees →
Tips
- This permit is explicitly for TEMPORARY structures only — no permanent surface treatments (concrete pads, asphalt, affixed decking) are allowed.
- The City may revoke a Provisional Building Permit at any time for non-compliance or to protect public utility easement access — this is a real risk for structures placed over an easement.
- Requires sign-off from both the Director of Community Development and the Director of Public Works on the application form itself.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-03.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the West Wendover building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in West Wendover
Compare provisional building permit (temporary/accessory structures) fees across Nevada →
Look up this fee in a different city →
Now live
Build your West Wendover project checklist
Describe your project once and get every permit, document, and fee it triggers in West Wendover — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →