Plumbing / Mechanical Permit in Unincorporated Doña Ana County, New Mexico
Required for plumbing and mechanical (HVAC/gas) installations, alterations, and repairs in unincorporated Doña Ana County. Doña Ana County uses a single combined Plumbing/Mechanical permit form and fee schedule covering both trades, priced per fixture/appliance item. Obtained separately from — and only after — the building permit is issued.
Verified 2026-07-05 · Source
When you need this permit
- Cannot be issued until an associated building permit (or MHIP) has been issued, or in conjunction with an existing remodel not requiring a building permit
- Covers plumbing fixtures, water distribution, building drains, water heaters, swimming pools, water conditioners, backflow devices, evaporative coolers, ventilation/exhaust, refrigeration, ductwork, solar water heating, in-floor heating, gas piping, grease interceptors, and roof drains
- Gas unit items priced separately per unit: yard line, wall heater, range, capped opening, boiler, central furnace (by BTU), water heater (by BTU), pool heater (by BTU)
- Work must be performed by a New Mexico-licensed plumbing or mechanical contractor for tradesman-pulled permits
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Plumbing Rough-In / Top Out
1st phase: all drain and water lines installed before slab placement; 2nd phase: all vents extended through roof, water and gas piping installed
- 2
HVAC Rough-In
All ductwork with insulation, gas vents through roof, gas piping, and dryer vent — 2nd phase
- 3
Plumbing Final / HVAC Final
All fixtures, water heater, gas piping system tested and drains in working condition (plumbing); all heating and cooling equipment installed with registers in place (HVAC). Inspection phone: (575) 647-7350.
See the full Unincorporated Doña Ana County inspection guide — scheduling & re-inspection fees →
Tips
- Doña Ana County combines plumbing and mechanical into a single permit application and fee form, unlike jurisdictions that separate them into distinct Plumbing and Mechanical permit types.
- A flat $15.00 Administration Fee and $10.00 Final Inspection Fee apply on top of the itemized fixture/appliance fees for every plumbing/mechanical permit.
- Gas-fired appliances (furnace, water heater, pool heater) are billed both as a gas unit ($3.00 each) and, where applicable, under their specific equipment line item.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-05.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Doña Ana County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Unincorporated Doña Ana County
Plumbing / Mechanical Permit in other cities
Compare plumbing / mechanical permit fees across New Mexico →
Look up this fee in a different city →
Now live
Build your Unincorporated Doña Ana County project checklist
Describe your project once and get every permit, document, and fee it triggers in Unincorporated Doña Ana County — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →