Gallup building inspections
VerifiedInspection sequence, scheduling, and re-inspection fees for building permits in Gallup, New Mexico.
Verified 2026-07-23 · Source
How to schedule
Inspections are requested through the building department below.
- Address
- City of Gallup Planning & Development: 110 W. Aztec Avenue, Gallup, NM 87301 (mailing: PO Box 1270, Gallup, NM 87305). Nearest CID office: Albuquerque, 5500 San Antonio Dr. Suite F, Albuquerque, NM 87109
- Phone
- City of Gallup Planning & Development: (505) 863-1240 (fax (505) 722-5131 / 5134); CID Albuquerque: (505) 222-9800/9801; CID Santa Fe: (505) 476-4700; CID inspection scheduling: (505) 222-9813 or (877) 243-0979
- Office hours
- City of Gallup Planning & Development Department: Monday-Friday 8:00 a.m.-5:00 p.m. (MST)
- Website
- Official site
Published scheduling rules
- To schedule an inspection, call (505) 222-9813 or (877) 243-0979, per the City of Gallup Homeowner's Building Permit Application useful phone numbers (Electrical Permit)
- To schedule an inspection, call (505) 222-9813 or (877) 243-0979, per the City of Gallup Homeowner's Building Permit Application useful phone numbers (EV Charger / EVSE Permit)
Inspection sequence
Applies to: Residential Building Permit (New Construction)
- 1
Foundation Inspection
Made after excavations for footings are complete and required reinforcing steel is in place, before concrete placement; conducted by CID under the same statewide inspection framework applied in other NM CID-administered jurisdictions
- 2
Concrete Slab / Under-Floor Inspection
Made after all in-slab or under-floor building service equipment, conduit, and piping are in place, but before concrete is placed or floor sheathing installed
- 3
Frame Inspection
Made after roof, framing, fire blocking, and bracing are in place; the City's Homeowner's Building Permit Application confirms general-construction (frame/final) inspections will not proceed until plumbing, electrical, and mechanical inspections have passed CID
- 4
Final Inspection
Made after finish grading and building completion; final electrical, plumbing, and mechanical inspections must be conducted first. CID issues the Certificate of Occupancy after approving the final inspection
Applies to: Plumbing Permit
- 1
Underground / Slab Plumbing
Before concrete pour — verify pipe slope, materials, cleanouts
- 2
Rough-In
After pipes installed, before walls closed
- 3
Final
All fixtures connected, no leaks, proper venting verified
Applies to: Change of Use / Change of Occupancy Permit
- 1
Final Inspection / Certificate of Occupancy Inspection
Verifies the structure complies with the applicable code for its new occupancy classification; no occupancy change is permitted until this inspection is approved and a C/O or approved final inspection is issued, per 14.5.3.13 NMAC
- 2
Fire Code Official Inspection
Verifies compliance with the amended IFC Section 102.3 change-of-occupancy provisions, particularly where the new use is more hazardous (life/fire risk) than the existing use
Applies to: Demolition Permit
- 1
Pre-Backfill / Site Restoration
Verification that footing/foundation removal and utility capping are complete before site restoration
- 2
Final
Site restoration complete; dumping tickets provided to the building inspector
Applies to: Electrical Permit
- 1
Rough-In Inspection
Wiring and conduit installed before walls closed
- 2
Final Inspection
All devices installed, panel labeled, system energized
Applies to: EV Charger / EVSE Permit
- 1
Rough-In Inspection
EVSE circuit wiring and conduit installed before walls closed
- 2
Final Inspection
EVSE unit connections, breaker/disconnect, and grounding verified; system energized
Applies to: Fire Sprinkler / Fire Alarm System Permit
- 1
Final Acceptance Testing
Required to be recorded as complete before the fire protection system is approved by the State Fire Marshal or local Fire Marshal, per 10.25.5.18(G) NMAC
- 2
Post-Installation Inspection and Maintenance Verification
Ongoing inspection/maintenance per applicable NFPA standards and the 2021 IFC, performed by an individual holding a current State Fire Marshal Certificate of Fitness; records submitted to the City of Gallup Fire Prevention office within 14 calendar days of each inspection
Applies to: Mechanical / HVAC Permit
- 1
Rough-In / Equipment
Ductwork and mechanical equipment rough-in before walls closed
- 2
Final
Equipment operational, combustion air verified, venting correct
Applies to: Residential Addition / Alteration / Remodel Permit
- 1
Frame Inspection
After framing complete; rough electrical, plumbing, and heating must be CID-approved first
- 2
Final Inspection
After completion; final electrical, plumbing, and mechanical CID inspections conducted first
Applies to: Residential Solar Photovoltaic (PV) Permit
- 1
Electrical Inspection (CID Electrical Bureau)
Interconnection, disconnect placement, and wiring verified per the 2020 NEC
- 2
Frame/Final Inspection (if structural building permit required)
Racking/mounting attachment and roof penetration sealing verified against approved CID building permit plans
Applies to: Roofing Permit (Reroof)
- 1
Decking Inspection
Required upon removal of the existing roof, before new roofing material is applied
- 2
Final Inspection
Upon completion of the roofing project or application of the roof coating system
Final inspection only: Fence Permit, Sign Permit
Re-inspection fees
Sources & verification
Verified against official sources. Last reviewed 2026-07-23.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Gallup building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Gallup building permits
Get alerts for Gallup
We'll email you when Gallup's fees, documents, or codes change — not often.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.