EV Charger / EVSE Permit — Gallup, New Mexico · Requirements sheet
Verified 2026-07-23 · Source: https://www.rld.nm.gov/construction-industries/forms-and-applications/fees/
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
EV Charger / EVSE Permit in Gallup, New Mexico
Required for installation of a residential or commercial electric vehicle charging station (EVSE) in Gallup. As with all electrical work in this jurisdiction, the permit is issued directly by the New Mexico Construction Industries Division (CID), not the City of Gallup, under the 2020 New Mexico Electrical Code (based on the 2020 NEC). CID's statewide fee schedule has no distinct EV-charger/EVSE line item — a standalone EVSE circuit is billed under CID's flat statewide amp-based residential service fee if it involves a panel/service change, or the 'Minimum Inspection Fee for Items not Listed' ($27) catch-all if it does not.
Verified 2026-07-23 · Source
When you need this permit
- All electrical work must comply with the 2020 New Mexico Electrical Code (2020 NEC), NMAC 14.10.4
- Permit issued by CID, not the City of Gallup — per the City's own Homeowner's Building Permit Application: 'The State of New Mexico provides their own permits and inspections for plumbing, mechanical and electrical'
- All electrical work must be performed by a New Mexico CID-licensed electrical contractor unless the homeowner qualifies for and obtains a CID homeowner's electrical permit for their own primary residence under N.M. Admin. Code 14.5.2.18
- To schedule an inspection, call (505) 222-9813 or (877) 243-0979, per the City of Gallup Homeowner's Building Permit Application useful phone numbers
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough-In Inspection
EVSE circuit wiring and conduit installed before walls closed
- 2
Final Inspection
EVSE unit connections, breaker/disconnect, and grounding verified; system energized
See the full Gallup inspection guide — scheduling & re-inspection fees →
Tips
- Gallup does not issue electrical permits — an EV charger circuit is a State of New Mexico CID permit, the same authority split documented on this jurisdiction's other electrical, plumbing, and mechanical entries.
- CID has no distinct EV-charger fee line item; contact the CID Electrical Bureau or the Albuquerque CID office before applying to confirm whether your specific installation falls under the $27 catch-all minimum or a higher amp-based service fee.
- The City of Gallup's own Homeowner's Building Permit Application confirms the City inspector will not conduct any general construction inspections until CID's plumbing, electrical, and mechanical inspections have passed — sequence work accordingly if the EVSE install is part of a larger project.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-23.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Gallup building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Gallup
EV Charger / EVSE Permit in other cities
Compare ev charger / evse permit fees across New Mexico →
Look up this fee in a different city →
Related guides
Now live
Build your Gallup project checklist
Describe your project once and get every permit, document, and fee it triggers in Gallup — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →