Residential Solar Photovoltaic (PV) Permit in Gallup, New Mexico
Rooftop or ground-mount residential solar PV installation in Gallup is regulated by the state Construction Industries Division (CID), the same agency that has issued electrical permits in Gallup both before and after the City's July 6, 2026 general-construction transition. CID's electrical classification rules (14.6.6 NMAC) require anyone bidding or contracting a solar PV electric system installation to hold an EE-98, EL-1, or ER-1 license classification (or, for structural modifications to the mounting/racking, a GB-2 residential or GB-98 general building classification, now also CID-administered in Gallup post-transition). CID's published Electrical Bureau fee schedule does not itemize a solar/PV-specific line, so the electrical scope is billed under the Electrical Bureau's general schedule; a City of Gallup Site Development Permit (zoning) prerequisite may also apply if the installation is part of new construction or requires a structural addition.
Verified 2026-07-23 · Source
When you need this permit
- Contractor bidding/installing the solar PV electric system must hold a valid CID EE-98, EL-1, or ER-1 license classification (14.6.6 NMAC, Electrical Classifications, PV-specific scope)
- Installer performing the physical PV electrical work must hold a valid CID journeyman certificate (EE-98J, EL-1J, or ER-1J) or be a certified apprentice working under direct journeyman supervision
- If the installation requires structural modifications to the roof or mounting structure, that work must be performed under a GB-2 (residential) or GB-98 (general) building license classification — filed as a CID General Construction Building Permit, since Gallup's own certified building official retired and the City no longer issues general-construction building permits as of July 6, 2026
- City of Gallup Site Development Permit (zoning compliance, infrastructure review) may be required first if the PV installation is part of new construction or a structural addition, per the City's July 2026 CID Transition notice
- Governed by the 2020 New Mexico Electrical Code (NMAC 14.10.4) / 2020 NEC as statewide-adopted
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Electrical Inspection (CID Electrical Bureau)
Interconnection, disconnect placement, and wiring verified per the 2020 NEC
- 2
Frame/Final Inspection (if structural building permit required)
Racking/mounting attachment and roof penetration sealing verified against approved CID building permit plans
See the full Gallup inspection guide — scheduling & re-inspection fees →
Tips
- There is no separate 'solar permit' fee line published by CID — a PV installation's electrical scope is billed under the Electrical Bureau's general fee schedule (service-amperage tier if applicable, otherwise the $27 minimum/not-listed fee).
- If your PV installation requires structural roof/mounting modifications, that scope now goes through CID (not the City of Gallup) as a General Construction Building Permit, since the City stopped issuing general-construction permits effective July 6, 2026 — filed under a GB-2 (residential) or GB-98 (general) contractor license. Contractor
- Confirm whether a City of Gallup Site Development Permit (zoning) applies to your specific installation before applying to CID — this City permit is governed by Resolution No. R2004-40's valuation-based fee schedule (confirmed 2026-07-23, attached to the current live application packet).
- The nearest permanent CID office to Gallup/McKinley County is Albuquerque, (505) 222-9800/9801.
- Re-chase pass (2026-07-20): independently re-verified NMAC 14.5.5.11 general-construction building-permit fee tiers ($3.00/$1,000 up to $15,000, $1.00/$1,000 thereafter) against the Cornell LII mirror and confirmed the CID fee page's $27 minimum-inspection-fee and amperage-tier electrical schedule are still live and unchanged; these remain the governing, citable dollar figures for the solar PV permit's electrical and (if applicable) structural scopes. The City of Gallup Site Development Permit fee remains the only unresolved line item.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-23.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Gallup building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Gallup
Residential Solar Photovoltaic (PV) Permit in other cities
Compare residential solar photovoltaic (pv) permit fees across New Mexico →
Look up this fee in a different city →
Now live
Build your Gallup project checklist
Describe your project once and get every permit, document, and fee it triggers in Gallup — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →