Residential Solar Photovoltaic (PV) Permit — Gallup, New Mexico · Requirements sheet
Verified 2026-07-23 · Source: https://www.rld.nm.gov/construction-industries/forms-and-applications/fees/
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Residential Solar Photovoltaic (PV) Permit in Gallup, New Mexico
Rooftop or ground-mount residential solar PV installation in Gallup is regulated by the state Construction Industries Division (CID), the same agency that has issued electrical permits in Gallup both before and after the City's July 6, 2026 general-construction transition. CID's electrical classification rules (14.6.6 NMAC) require anyone bidding or contracting a solar PV electric system installation to hold an EE-98, EL-1, or ER-1 license classification (or, for structural modifications to the mounting/racking, a GB-2 residential or GB-98 general building classification, now also CID-administered in Gallup post-transition). CID's published Electrical Bureau fee schedule does not itemize a solar/PV-specific line, so the electrical scope is billed under the Electrical Bureau's general schedule; a City of Gallup Site Development Permit (zoning) prerequisite may also apply if the installation is part of new construction or requires a structural addition.
Verified 2026-07-23 · Source
When you need this permit
- Contractor bidding/installing the solar PV electric system must hold a valid CID EE-98, EL-1, or ER-1 license classification (14.6.6 NMAC, Electrical Classifications, PV-specific scope)
- Installer performing the physical PV electrical work must hold a valid CID journeyman certificate (EE-98J, EL-1J, or ER-1J) or be a certified apprentice working under direct journeyman supervision
- If the installation requires structural modifications to the roof or mounting structure, that work must be performed under a GB-2 (residential) or GB-98 (general) building license classification — filed as a CID General Construction Building Permit, since Gallup's own certified building official retired and the City no longer issues general-construction building permits as of July 6, 2026
- City of Gallup Site Development Permit (zoning compliance, infrastructure review) may be required first if the PV installation is part of new construction or a structural addition, per the City's July 2026 CID Transition notice
- Governed by the 2020 New Mexico Electrical Code (NMAC 14.10.4) / 2020 NEC as statewide-adopted
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
NM RLD Construction Industries Division Fees page, Electrical Bureau schedule. Show full citationHide
NM RLD Construction Industries Division Fees page, Electrical Bureau schedule. No solar/PV-specific line item is published in CID's Electrical Bureau fee schedule; this is the closest published catch-all line for an electrical scope of work with no itemized fee of its own. If the PV installation is tied to a new or upgraded electrical service, the applicable service-amperage tier fee (e.g., $45-$360, per the electrical-permit entry) would apply instead.R2004-40 (gallupnm.gov/DocumentCenter/View/4612) is directly attached as the fee schedule to the City's CURRENT, live Contractor's and Homeowner's Site Development Permit Applications… Show full citationHide
R2004-40 (gallupnm.gov/DocumentCenter/View/4612) is directly attached as the fee schedule to the City's CURRENT, live Contractor's and Homeowner's Site Development Permit Applications (gallupnm.gov/DocumentCenter/View/4601 and /4606) — it is not merely historical/legacy context; it is the document the City itself packages as this permit's fee schedule. Confirm the exact total for a PV-driven structural application with narchie@gallupnm.gov / (505) 863-1240.Review timeline
Inspection process
- 1
Electrical Inspection (CID Electrical Bureau)
Interconnection, disconnect placement, and wiring verified per the 2020 NEC
- 2
Frame/Final Inspection (if structural building permit required)
Racking/mounting attachment and roof penetration sealing verified against approved CID building permit plans
See the full Gallup inspection guide — scheduling & re-inspection fees →
Tips
- There is no separate 'solar permit' fee line published by CID — a PV installation's electrical scope is billed under the Electrical Bureau's general fee schedule (service-amperage tier if applicable, otherwise the $27 minimum/not-listed fee).
- If your PV installation requires structural roof/mounting modifications, that scope now goes through CID (not the City of Gallup) as a General Construction Building Permit, since the City stopped issuing general-construction permits effective July 6, 2026 — filed under a GB-2 (residential) or GB-98 (general) contractor license. Contractor
- Confirm whether a City of Gallup Site Development Permit (zoning) applies to your specific installation before applying to CID — this City permit is governed by Resolution No. R2004-40's valuation-based fee schedule (confirmed 2026-07-23, attached to the current live application packet).
- The nearest permanent CID office to Gallup/McKinley County is Albuquerque, (505) 222-9800/9801.
- NMAC 14.5.5.11 sets the general-construction building-permit fee tiers ($3.00/$1,000 up to $15,000, $1.00/$1,000 thereafter), and the CID fee page publishes the $27 minimum-inspection-fee and the amperage-tier electrical schedule; these are the governing, citable dollar figures for the solar PV permit's electrical and (if applicable) structural scopes. The City of Gallup Site Development Permit fee remains the only unresolved line item.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-23.
Fee schedules
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Gallup building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Gallup's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Gallup yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Gallup lands. Privacy.
Other permits in Gallup
Residential Solar Photovoltaic (PV) Permit in other cities
Compare residential solar photovoltaic (pv) permit fees across New Mexico →
Look up this fee in a different city →
Now live
Build your Gallup project checklist
Describe your project once and get every permit, document, and fee it triggers in Gallup — in one checklist. Free, for any city and any number of projects.
Get started →