Tremonton building permits

Verified

Tremonton, Utah — as published 2026-07-16.

Verified 2026-07-08 · Source

Codes adopted

2024 International Building Code (IBC), including Appendices C and J — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(a); supersedes the 2021 edition previously listed here. Tremonton's own Building Criteria PDF (live-checked 2026-07-16, still hosted at the same URL, last modified April 2024) still lists '2021 International Building Code' and has not been updated to reflect the 7/1/2026 statewide edition change — the statute controls over the lagging city document.2021 International Residential Code (IRC) — REMAINS CURRENT; Utah Code § 15A-2-103(1)(b) did NOT change this edition in the 7/1/2026 statewide amendment. Consistent with Tremonton's own Building Criteria document.Appendix AQ of the 2021 IRC — statewide per Utah Code § 15A-2-103(1)(c); not itemized in Tremonton's own Building Criteria document, added here per statute.2021 International Fire Code (IFC) — per Tremonton's own Building Criteria document; NOTE: the IFC is adopted under Utah Code Title 15A Chapter 5, not § 15A-2-103 (which governs the IBC/IRC/IPC/IMC/IFGC/IECC/IEBC/NEC/residential-ISPSC/MBI editions listed in this array) — § 15A-2-103 does not itself adopt or list an IFC edition, so this entry is unaffected by the 7/1/2026 § 15A-2-103 amendment.2024 International Fuel Gas Code (IFGC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(f); supersedes the 2021 edition. Tremonton's own Building Criteria document (live-checked 2026-07-16) still lists '2021 International Fuel Gas Code' and has not been updated.2024 International Mechanical Code (IMC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(e); supersedes the 2021 edition. Tremonton's own Building Criteria document (live-checked 2026-07-16) still lists '2021 International Mechanical Code' and has not been updated.2024 International Plumbing Code (IPC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(d); supersedes the 2021 edition. Tremonton's own Building Criteria document (live-checked 2026-07-16) still lists '2021 International Plumbing Code' and has not been updated.2021 International Property Maintenance Code (IPMC) — per the same document; not adopted or superseded by § 15A-2-103, which does not list an IPMC edition, so this entry is unaffected by the 7/1/2026 amendment2024 International Energy Conservation Code (IECC), single unsplit statewide edition — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(h); supersedes the 2021 edition. Tremonton's own Building Criteria document (live-checked 2026-07-16) still lists '2021 Energy Conservation Code' and has not been updated.2023 National Electrical Code (NEC) — CURRENT statewide per Utah Code § 15A-2-103(1)(g); UNCHANGED by the 7/1/2026 amendment (2023 has been the statewide NEC edition since before this cycle). Tremonton's own Building Criteria document (live-checked 2026-07-16, still hosted at the same URL) lists '2020 National Electrical Code,' which is NOT a valid statewide-adopted edition and has not been corrected by the City — the statute controls. Confirm the currently enforced NEC edition directly with the Building Department before relying on the City's own document for a live project.1997 Edition of the Uniform Code for the Abatement of Dangerous Buildings — per the same document; not governed by § 15A-2-1032017 Edition of the ICC/ANSI A117.1 Standard for Accessibility — per the same document; not governed by § 15A-2-1032024 International Existing Building Code (IEBC) — statewide per Utah Code § 15A-2-103(1)(i); not itemized in Tremonton's own Building Criteria document, added here per statute since the City's own materials omit it.Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — statewide per Utah Code § 15A-2-103(1)(n); not itemized in Tremonton's own Building Criteria document, added here per statute since the City's own materials omit it.MBI 1200 and MBI 1205 (manufactured/modular construction standards) — statewide per Utah Code § 15A-2-103(1)(o); not itemized in Tremonton's own Building Criteria document, added here per statute since the City's own materials omit it.NOTE (2026-07-16 re-verification): Utah Code § 15A-2-103, version effective 7/1/2026 (superseded 1/1/2027), took effect 15 days before this re-verification. IBC/IPC/IMC/IFGC/IECC/IEBC/residential ISPSC are now 2024 statewide; IRC (2021) and NEC (2023) did NOT change from the prior cycle. Tremonton's own Building Criteria PDF (tremontoncity.gov/wp-content/uploads/2024/04/BUILDING-DESIGN-CRITERIA.pdf) was re-fetched live 2026-07-16 and still lists 2021 IBC/IFGC/IMC/IPC/'2021 Energy Conservation Code' and an outright incorrect '2020 National Electrical Code' — none of these have been updated by the City to reflect the statewide 7/1/2026 transition or the pre-existing 2023 NEC requirement. The statute is cited directly as governing throughout; the City's lagging document is preserved above as recorded history, not deleted.

Permit types & fees

Residential Building Permit

Verified

Required for new single-family dwelling construction, residential outbuildings, and any work regulated by the adopted 2024 IBC / 2021 IRC in Tremonton (2024 IBC current per Utah Code § 15A-2-103(1)(a) effective 7/1/2026; IRC remains 2021 per § 15A-2-103(1)(b)). Permit fee is valuation-based (1% of Building Valuation per the ICC Building Valuation Table) rather than a flat fee, per the City's official Consolidated Fees and Fines Schedule (Resolution No. 25-42, effective August 26, 2025).

Verified 2026-07-08 · Source

Requirements

  • New single-family dwelling or residential outbuilding construction
  • Any work regulated by the adopted 2024 IBC / 2021 IRC
  • Plans submitted electronically via the City's CivicReview portal, drawn to scale by a Structural Engineer or Architect licensed in Utah for non-conventional designs
  • Sidewalks required along all street frontages per Tremonton City Code § 1.28.015 (waivable by written request to the Land Use Authority Board)

Required documents

  • RequiredEngineered Plan SetRequired for Home, Outbuilding, or ADU applications per the City's official Building & Solar Permit Requirements page.
  • RequiredPlot PlanSite/plot plan on regular size (8.5" x 11") paper, scale no less than 1 inch = 20 feet, showing applicant info, subdivision/lot number, site square footage, setbacks, property lines, easements, and adjacent streets/alleys, per Tremonton City Code § 1.28.025(B).
  • RequiredWall Section PlanRequired residential submittal item per the Building & Solar Permit Requirements page.
  • RequiredFloor PlanMust show the use of all rooms; unfinished rooms may be considered storage but future use should be indicated, per the Building & Solar Permit Requirements page.
  • RequiredRes-CheckUtah Model Energy Code compliance checklist for residential construction, per the Building & Solar Permit Requirements page (equivalent to the 'Model Energy Code Check List' referenced in Tremonton City Code § 1.28.025(C)).
  • OptionalProof of SepticRequired only in areas without municipal sewer availability; approved through the Bear River Health Department (435-257-3318), per the Building & Solar Permit Requirements page.
  • RequiredContractor's State LicensePhotocopy of State of Utah contractor's license required for all contractors; owner-builders intending to occupy the structure are exempt, per Tremonton City Code § 1.28.025(E).

Fee schedule

Fee typeAmountNotes
Permit Fee (valuation-based)1% of Building ValuationTremonton City Consolidated Fees and Fines Schedule, Resolution No. 25-42 (effective 08/26/2025), Section 3.1 'Residential Dwelling & Residential Outbuilding Inspection Fees'. Building Valuation is determined according to the most recent Building Valuation Table from the International Code Council. Each project is also assessed a separate State Fee (below).
State Fee1% of the Permit FeeResolution No. 25-42, Section 3.1. Statutory state surcharge collected alongside the local Permit Fee.
Plan Review Fee (residential & outbuilding)35% of the Permit Fee and State FeeResolution No. 25-42, Section 3.2 'Residential & Outbuilding Plan Review Fees'.
Garbage Can Purchase (new residential unit)See Garbage Can Setup Fee, $150.00Resolution No. 25-42, Section 3.1 footnote and Section 8.1: property owners pay the purchase cost of the first garbage can when applying for a building permit for a new residential unit; the City retains ownership of the can.
Re-inspection Fee$90.00Resolution No. 25-42, Section 3.1 'Residential Dwelling & Residential Outbuilding Inspection Fees'.

Commercial / Industrial Building Permit

Verified

Required for new commercial and industrial construction in Tremonton. Requires professionally drawn plans wet-stamped by a State of Utah licensed Engineer or Architect. Uses the same valuation-based fee structure as residential but with a substantially higher plan review percentage.

Verified 2026-07-19 · Source

Requirements

  • New commercial, industrial, institutional, or governmental construction
  • Plans must be professionally drawn and include a Utah-licensed Engineer or Architect wet stamp prior to final review or permit issuance, per the City's official Building & Solar Permit Requirements page
  • Water rights dedication to the City required for Industrial, Commercial, Institutional, and Multi-Family Dwelling uses prior to permit issuance, per Tremonton City Code § 1.28.035(B)(7)

Required documents

  • RequiredArchitectural Plans and Cover SheetRequired commercial submittal item per the Building & Solar Permit Requirements page.
  • RequiredStructural Engineered Plan SetMust be drawn/engineered and stamped by a licensed Architect and/or Structural Engineer in the State of Utah for all commercial and industrial plans, per the Building & Solar Permit Requirements page.
  • RequiredCom-CheckCommercial energy code compliance checklist, per the Building & Solar Permit Requirements page.
  • OptionalFire Sprinkler PlanRequired if applicable, per the Building & Solar Permit Requirements page.
  • RequiredADA Accessibility PlanRequired commercial submittal item, consistent with the City's adopted 2017 ICC/ANSI A117.1 Standard for Accessibility.

Fee schedule

Fee typeAmountNotes
Permit Fee (valuation-based)1% of Building ValuationResolution No. 25-42, Section 3.3 'Industrial, Institutional, Commercial, & Governmental Inspection Fees'. Building Valuation determined per the most recent ICC Building Valuation Table.
State Fee1% of the Permit FeeResolution No. 25-42, Section 3.3.
Plan Review Fee (commercial/industrial/institutional/governmental)65% of the Permit Fee and State FeeResolution No. 25-42, Section 3.4 'Industrial, Institutional, Commercial, & Governmental Plan Review Fees'. A $200.00 deposit is required with plan submission; no plan review costs are refunded once the review is completed.

Solar Panel (PV) Permit

Verified

Required for residential and commercial rooftop or ground-mounted solar photovoltaic installations in Tremonton. The City publishes a dedicated Solar Permit Requirements checklist distinct from its standard residential/commercial submittal lists.

Verified 2026-07-08 · Source

Requirements

  • Structural engineering letter confirming the roof or mounting structure can support the added solar array load
  • Site plan showing system layout
  • One-line electrical diagram
  • Module, inverter, and (if applicable) battery specifications
  • Signage plan for required solar disconnect/warning labeling
  • Interior and exterior photos of panels and system components

Required documents

  • RequiredStructural Engineering and LetterRequired per the City's official Building & Solar Permit Requirements page, 'Solar Permit Requirements' section.
  • RequiredSite PlanRequired per the Solar Permit Requirements checklist.
  • RequiredOne-Line DiagramRequired per the Solar Permit Requirements checklist.
  • RequiredModule and Inverter SpecificationsManufacturer specification sheets, required per the Solar Permit Requirements checklist.
  • OptionalBattery SpecificationsRequired if an energy storage system is part of the installation, per the Solar Permit Requirements checklist.
  • RequiredSignage PlanRequired per the Solar Permit Requirements checklist.
  • RequiredPhotos (Interior and Exterior Panels / System Components)Required per the Solar Permit Requirements checklist.

Fee schedule

Fee typeAmountNotes
Permit Fee (valuation-based, residential)1% of Building ValuationTremonton's fee resolution (No. 25-42) does not list a separate line-item solar fee; solar installations are billed under the same Section 3.1 Residential Dwelling & Residential Outbuilding valuation-based Permit Fee (1% of Building Valuation) plus the standard State Fee (1% of Permit Fee) that applies to all residential building permits. No dedicated 'solar permit' fee line exists in the official schedule as of Resolution 25-42 (08/26/2025).
State Fee1% of the Permit FeeResolution No. 25-42, Section 3.1, applies to all residential permits including solar.

Re-Roofing Permit

Verified

Required for roof replacement/re-roofing in Tremonton. The City publishes a distinct flat fee for re-roofing, separate from its general valuation-based building permit fee.

Verified 2026-07-08 · Source

Requirements

  • Complete roof replacement (tear-off and re-roof)

Required documents

  • RequiredBuilding Permit Application (CivicReview)Submitted electronically via app.civicreview.com per the City's Building & Solar Permit Requirements page.

Fee schedule

Fee typeAmountNotes
Re-Roofing Permit Fee$150.00Tremonton City Consolidated Fees and Fines Schedule, Resolution No. 25-42, Section 3.5 'Miscellaneous Building Inspection Service Fees': 'Re-Roofing Permit — $150.00.'

Water Heater / Furnace / Electric Meter Permit (Standalone Trade)

Verified

Required for standalone water heater, furnace, or electric meter installation/replacement in Tremonton, each billed as a distinct flat Miscellaneous Building Inspection Service fee.

Verified 2026-07-20 · Source

Requirements

  • Standalone water heater installation or replacement
  • Standalone furnace installation or replacement
  • Standalone electric meter work

Required documents

  • RequiredBuilding Permit Application (CivicReview)Submitted electronically via app.civicreview.com per the City's Building & Solar Permit Requirements page.

Fee schedule

Fee typeAmountNotes
Water Heater Permit$75.00Resolution No. 25-42, Section 3.5 Miscellaneous Building Inspection Service Fees.
Furnace Permit$75.00Resolution No. 25-42, Section 3.5.
Electric Meter Permit$75.00Resolution No. 25-42, Section 3.5.
Small Scale Remodel or Construction — Electrical Inspection Only$60.00Resolution No. 25-42, Section 3.1.
Small Scale Remodel or Construction — Plumbing Inspection Only25% of the Permit Fee and State FeeResolution No. 25-42, Section 3.1.
Small Scale Remodel or Construction — Mechanical Inspection Only25% of the Permit Fee and State FeeResolution No. 25-42, Section 3.1.

Manufactured Home / Mobile Home Permit

Verified

Required for placement of manufactured or mobile homes in Tremonton. Manufactured/Modular Homes must comply with the Residential Architectural Standards in the City's Supplementary Regulations, per Tremonton City Code § 1.28.035(B)(5)-(6).

Verified 2026-07-08 · Source

Requirements

  • Manufactured Homes or Mobile Homes must comply with applicable standards in Chapter 19 Supplementary Regulations, per Tremonton City Code § 1.28.035(B)(5)
  • Must comply with the Residential Architectural Standards contained in Chapter 19 Supplementary Regulations, per § 1.28.035(B)(6)

Required documents

  • RequiredBuilding Permit Application (CivicReview)Submitted electronically via app.civicreview.com per the City's Building & Solar Permit Requirements page.

Fee schedule

Fee typeAmountNotes
Mobile Home / Manufactured Housing Fee$150.00Resolution No. 25-42, Section 3.5 Miscellaneous Building Inspection Service Fees: 'For all Mobile Homes and Manufactured Housing — $150.00.'

Commercial Tenant Improvement / Tenant Finish Permit

Verified

Tremonton does not publish a separate tenant-improvement fee category. The City's Consolidated Fees and Fines Schedule (Resolution No. 25-42, effective 08/26/2025), Sections 3.3-3.4, bills all 'Industrial, Institutional, Commercial, & Governmental' work -- new construction, additions, and interior tenant-improvement/remodel projects alike -- under the same uniform structure: a 1%-of-Building-Valuation Permit Fee, a 1%-of-Permit-Fee State Fee, and a 65%-of-(Permit Fee + State Fee) Plan Review Fee (versus the 35% residential rate), with no separate tenant-improvement or commercial-remodel line item anywhere in the schedule. This is confirmed by direct read of the full Section 3.3/3.4 fee tables, which list only 'Permit Fee' and 'State Fee' (3.3) and 'Plan Review Fee' (3.4) rows -- no tenant-improvement or remodel sub-category exists on the commercial side, in contrast to Section 3.1's residential-only 'Small Scale Remodel or Construction' reduced-rate carve-outs (e.g., $60.00 electrical-only inspection).

Verified 2026-07-19 · Source

Requirements

  • Interior tenant-improvement/build-out or remodel of an existing commercial, industrial, institutional, or governmental space
  • Plans professionally drawn and wet-stamped by a Utah-licensed Engineer or Architect prior to final review or permit issuance -- the same requirement stated for new commercial construction on the City's official Building & Solar Permit Requirements page
  • Com-Check commercial energy code compliance checklist, where the tenant-improvement scope affects the building envelope, lighting, or mechanical systems
  • Submitted electronically via the City's CivicReview portal (app.civicreview.com), the same portal used for new commercial/industrial permits

Required documents

  • RequiredStructural Engineered Plan SetRequired for commercial/industrial plans per the Building & Solar Permit Requirements page; applies to tenant-improvement scopes involving structural, life-safety, or MEP work.
  • RequiredArchitectural Plans and Cover SheetRequired commercial submittal item per the Building & Solar Permit Requirements page.
  • OptionalCom-CheckCommercial energy code compliance checklist, required where the tenant-improvement scope affects the building envelope or mechanical/lighting systems.

Fee schedule

Fee typeAmountNotes
Permit Fee (valuation-based)1% of Building ValuationTremonton City Consolidated Fees and Fines Schedule, Resolution No. 25-42 (effective 08/26/2025), Section 3.3 'Industrial, Institutional, Commercial, & Governmental Inspection Fees' -- the same table applies to tenant-improvement/interior-remodel work as to new commercial/industrial construction; no separate tenant-improvement fee line exists in the schedule.
State Fee1% of the Permit FeeResolution No. 25-42, Section 3.3.
Plan Review Fee (commercial/industrial/institutional/governmental)65% of the Permit Fee and State FeeResolution No. 25-42, Section 3.4. A $200.00 deposit is required with plan submission; no plan review costs are refunded once the review is completed. Applies uniformly to tenant-improvement/remodel plan review, same as new commercial construction.

Sign Permit

Verified

Required in Tremonton to erect, raise, move, place, reconstruct, extend, enlarge, alter, replace, or change the text of any sign, per Tremonton City Code Chapter 1.27 (Sign Permit). The flat Sign Permit fee is $50.00 per the city's Consolidated Fees & Fines Schedule. A Sign Permit may be submitted concurrently with a Building Permit, and it expires one year after approval unless a Building Permit, Business License, or other required permit is obtained.

Verified 2026-07-19 · Source

Requirements

  • Only property owners or their duly authorized agents may apply, on forms approved by the Zoning Administrator (§ 1.27.015.A)
  • Application must include the processing fee and all supporting materials required by Chapter 1.27; incomplete applications are not processed (§ 1.27.015.B)
  • One digital copy, sized at a maximum of ledger (11" x 17"), of each sheet of the Site Plan (§ 1.27.015.C.1)
  • Site Plan drawn to scale showing the proposed sign location, parking areas, landscaped areas, and buildings; if the sign is within 100 feet of a property line, those features must be shown for property within 100 feet of the sign (§ 1.27.020.A)
  • Signs other than monument-style must have a minimum 8-foot clearance from walking areas and must not project over a property line, with limited exceptions (§ 1.27.010 area)
  • No sign of any kind is allowed in a residential zone unless otherwise specifically noted in Chapter 1.27

Required documents

  • RequiredSign Permit ApplicationSubmitted on forms approved by the Zoning Administrator, per § 1.27.015
  • RequiredSite PlanScaled drawing showing proposed sign location, parking areas, landscaped areas, and buildings (and surrounding property within 100 ft if the sign is within 100 ft of a property line), per § 1.27.020.A

Fee schedule

Fee typeAmountNotes
Sign Permit$50.00Tremonton City Consolidated Fees & Fines Schedule, Section 5.1 Development Application Reviews table — visually confirmed via rendered PDF page (garbled in plain-text extraction), reviewed and approved November 7, 2023, Resolution No. 23-67, within the schedule document last updated 7/15/2025; directly fetched 2026-07-19 (tremontoncity.gov/wp-content/uploads/2025/07/Fee-and-Fine-Schedule-Updated-7.15.25.pdf)

EV Charger / EVSE Permit

Tremonton City does not publish a distinct EV charger / EVSE fee line item. The city's Consolidated Fees and Fines Schedule (Resolution No. 25-42) prices a 'Small Scale Remodel or Construction — Electrical Inspection Only' category at a flat $60.00, which is the fee category an EV charger circuit installation would most plausibly fall under, but the city does not explicitly name EV chargers, EVSE, or electric vehicle charging in any published fee document.

Reviewed 2026-07-20 · Source

Requirements

  • Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property within Tremonton City limits
  • New dedicated 240V circuit and/or panel capacity to serve the charger, inspected under the National Electrical Code
  • Permit application submitted through the city's CivicReview electronic portal

Required documents

  • RequiredBuilding/Electrical Permit Application (CivicReview)Submitted online via Tremonton City's CivicReview portal; describe the scope as an electrical circuit/EV charger installation.

Fee schedule

Fee typeAmountNotes
Small Scale Remodel or Construction — Electrical Inspection Only$60.00Tremonton City Consolidated Fees and Fines Schedule, Resolution No. 25-42 (adopted August 26, 2025), Section 3.1 Residential Dwelling & Residential Outbuilding Inspection Fees — closest published fee category for a standalone electrical scope such as an EV charger circuit; the city does not name EV chargers specifically.

Automatic Fire Sprinkler System Permit

Required for installation of automatic fire sprinkler systems in Tremonton. Tremonton City's own Fire Department page (tremontoncity.gov/services/firedept/) and its official Building & Solar Permit Requirements page do not publish a local fire-sprinkler plan review process or fee — the City's Consolidated Fees and Fines Schedule (Resolution No. 25-42) contains no fire-related fee line item anywhere in its full text. Fire sprinkler plans for Tremonton projects are therefore submitted to the Utah State Fire Marshal's Office (Sandy, UT), which runs the statewide Automatic Fire Sprinkler Plan Submittal process used by jurisdictions without their own local fire-plan-review authority. Tremonton's own commercial-building-permit submittal checklist separately lists an optional 'Fire Sprinkler Plan' document ('required if applicable'), consistent with this being routed as a companion submittal alongside the standard Building Permit rather than a City-run process.

Reviewed 2026-07-22 · Source

Requirements

  • Automatic fire sprinkler system design, alteration, or new installation subject to the adopted Fire Code (Tremonton has adopted the 2021 International Fire Code per its Building Criteria document)
  • Water supply analysis (static pressure, residual pressure, flow) provided per Utah Administrative Rule R710-4-5(A)(B)(C), sourced from contract specifications, a water supply analysis, the water purveyor, or a flow test
  • Plans, hydraulic calculations, and material submittals prepared/stamped by a licensed fire sprinkler contractor
  • Plan review fee paid to the Utah State Fire Marshal's Office before plan review is released

Required documents

  • RequiredAutomatic Fire Sprinkler Plan Submittal FormUtah State Fire Marshal's Office form; requires project name, location, square footage for the fee calculation, submitting company/license number, and architect/contact information.
  • RequiredAutomatic Sprinkler DrawingsNumber of sheets and drawing date, per the Submittal Form.
  • RequiredHydraulic CalculationsNumber of calculation sets and date, per the Submittal Form.
  • RequiredWater Supply AnalysisStatic pressure, residual pressure, and flow (gpm), sourced from contract specifications, a water supply analysis, the water purveyor, or a flow test, per Utah Admin. Rule R710-4-5.
  • OptionalMaterial SubmittalsProduct/material data for the sprinkler system, per the Submittal Form checklist.
  • OptionalSeismic CalculationsRequired where seismic bracing calculations apply, per the Submittal Form checklist.

Fee schedule

Fee typeAmountNotes
Fire Sprinkler Plan Review Fee$0.022 per square foot of review scope, $75.00 minimumUtah State Fire Marshal's Office Automatic Fire Sprinkler Plan Submittal Form: 'SQUARE FEET x .022 = $______. Note: Minimum fee is $75.' Fees must be paid before plan review will be released. No separate or additional fire-sprinkler fee is published in Tremonton City's own Consolidated Fees and Fines Schedule (Resolution No. 25-42) — a full-text review found no 'fire' line item in that document.

Fire Alarm System Permit

Required for installation of fire alarm systems in Tremonton. As with fire sprinkler systems, Tremonton City's own Fire Department and Building & Solar Permit Requirements pages do not publish a local fire-alarm plan review process or fee, and no 'fire' line item appears anywhere in the City's Consolidated Fees and Fines Schedule (Resolution No. 25-42). Fire alarm plans for Tremonton projects are therefore submitted to the Utah State Fire Marshal's Office (Sandy, UT) using its separate, dedicated Fire Alarm Plan Review Submittal Form — a distinct form and checklist from the Automatic Fire Sprinkler Plan Submittal Form, indicating the State Fire Marshal's Office organizes fire alarm and fire sprinkler plan review as two separate submittal processes rather than one combined process.

Reviewed 2026-07-22 · Source

Requirements

  • Fire alarm system design, alteration, or new installation subject to the adopted Fire Code (Tremonton has adopted the 2021 International Fire Code per its Building Criteria document)
  • Floor plan indicating the size and use of all rooms, and the occupancy type of the building
  • Project code analysis and complete alarm system design documentation (see Documents)
  • Plan review fee paid to the Utah State Fire Marshal's Office before plan review is released

Required documents

  • RequiredFire Alarm Plan Review Submittal FormUtah State Fire Marshal's Office form; requires project name, location, square footage for the fee calculation, and submitting company/contact information.
  • RequiredFloor Plan (Room Size and Use)Required submittal item per the Fire Alarm Plan Review Submittal Form checklist.
  • RequiredProject Code Analysis and Occupancy TypeRequired submittal item per the Submittal Form checklist.
  • RequiredDevice Locations, Control/Trouble Signaling Equipment, and AnnunciationLocations of alarm-initiating and notification appliances, alarm control and trouble signaling equipment, and annunciation, per the Submittal Form checklist.
  • RequiredElectrical Design (Power, Battery, Conductor, Voltage Drop)Power connection, battery calculations, conductor type and sizes, and voltage drop calculations, per the Submittal Form checklist.
  • RequiredEquipment Cut Sheets and Construction DetailsManufacturer's model numbers and listing information for equipment/devices/materials, details of ceiling height and construction, and the interface of fire safety control functions, per the Submittal Form checklist.

Fee schedule

Fee typeAmountNotes
Fire Alarm Plan Review Fee$0.022 per square foot of review scope, $75.00 minimumUtah State Fire Marshal's Office Fire Alarm Plan Review Submittal Form: 'SQUARE FT x .022 = $______. Note: Minimum fee is $75.' Fees must be paid before plan review will be released. No separate or additional fire-alarm fee is published in Tremonton City's own Consolidated Fees and Fines Schedule (Resolution No. 25-42) — a full-text review found no 'fire' line item in that document.

Change of Use / Change of Occupancy Permit

Tremonton does not publish a distinct 'change of use' permit type separate from its standard Building Permit. Tremonton City Code § 1.28.010 (Permit Required) states directly: 'UCA 10-9a-802(b) requires a Building Permit be issued to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure...' A change of use/occupancy is therefore processed as a standard Building Permit application under Chapter 1.28, culminating in a Certificate of Occupancy issued by the Building Official under § 1.28.050 once the structure is confirmed compliant with the adopted Building Code, City Ordinances, and any conditions of a prior Site Plan Permit or Conditional Use Permit. The City's Consolidated Fees and Fines Schedule (Resolution No. 25-42) has no dedicated 'change of use' or 'change of occupancy' fee line item -- a full-text review confirmed this.

Reviewed 2026-07-22 · Source

Requirements

  • Building Permit application required whenever a change of occupancy is proposed for an existing building or structure, per Tremonton City Code § 1.28.010 (citing UCA 10-9a-802(b))
  • Zoning Administrator review to confirm the new use conforms to zoning requirements, per § 1.28.035(A)
  • Building Official review to confirm the structure conforms to the adopted Building Code and City Ordinances for the new occupancy, per § 1.28.035(B)
  • Final inspection and issuance of a Certificate of Occupancy by the Building Official before the new use may commence, per § 1.28.050

Required documents

  • RequiredBuilding Permit Application (CivicReview)Submitted electronically via app.civicreview.com per the City's Building & Solar Permit Requirements page; describe the scope as a change of use/occupancy rather than new construction.
  • RequiredFloor PlanMust show the proposed use of all rooms under the new occupancy classification, consistent with the floor-plan requirement used for other Tremonton building permits (Building & Solar Permit Requirements page).
  • OptionalSite/Plot PlanRequired where the change of use affects parking, access, or site improvements subject to Title II review, per Tremonton City Code § 1.28.025(B).

Fee schedule

Fee typeAmountNotes
Permit Fee (valuation-based, if construction/alteration accompanies the use change)1% of Building Valuation (residential) or 1% of Building Valuation (commercial/industrial/institutional/governmental)If the change of use involves construction or alteration work, Tremonton bills it under the same Section 3.1 (residential) or Section 3.3 (commercial/industrial/institutional/governmental) valuation-based Permit Fee structure used for new construction, per Resolution No. 25-42.
Inspections for which no fee is specifically indicated$75.00 per hour (minimum charge — one-half hour)Resolution No. 25-42, Section 3.5 Miscellaneous Building Inspection Service Fees. This is the closest published catch-all fee category for a change-of-use/occupancy review with no accompanying construction valuation to base the standard percentage-based Permit Fee on; the schedule does not name 'change of use' or 'change of occupancy' specifically, so this category is not confirmed by the City to apply verbatim -- confirm directly with the Building Department, (435) 564-0897, before budgeting a specific project.

Sources & verification

Verified against official sources. Last reviewed 2026-07-08.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Tremonton building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-07-07)View current record →All versions →