This is PermitBase’s published record for Tremonton as of 2026-07-19. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.

Tremonton building permits

Verified

Tremonton, Utah — as published 2026-07-19.

Verified 2026-07-08 · Source

Codes adopted

2024 International Building Code (IBC), including Appendices C and J — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(a); supersedes the 2021 edition previously listed here. Tremonton's own Building Criteria PDF (live-checked 2026-07-16, still hosted at the same URL, last modified April 2024) still lists '2021 International Building Code' and has not been updated to reflect the 7/1/2026 statewide edition change — the statute controls over the lagging city document.2021 International Residential Code (IRC) — REMAINS CURRENT; Utah Code § 15A-2-103(1)(b) did NOT change this edition in the 7/1/2026 statewide amendment. Consistent with Tremonton's own Building Criteria document.Appendix AQ of the 2021 IRC — statewide per Utah Code § 15A-2-103(1)(c); not itemized in Tremonton's own Building Criteria document, added here per statute.2021 International Fire Code (IFC) — per Tremonton's own Building Criteria document; NOTE: the IFC is adopted under Utah Code Title 15A Chapter 5, not § 15A-2-103 (which governs the IBC/IRC/IPC/IMC/IFGC/IECC/IEBC/NEC/residential-ISPSC/MBI editions listed in this array) — § 15A-2-103 does not itself adopt or list an IFC edition, so this entry is unaffected by the 7/1/2026 § 15A-2-103 amendment.2024 International Fuel Gas Code (IFGC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(f); supersedes the 2021 edition. Tremonton's own Building Criteria document (live-checked 2026-07-16) still lists '2021 International Fuel Gas Code' and has not been updated.2024 International Mechanical Code (IMC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(e); supersedes the 2021 edition. Tremonton's own Building Criteria document (live-checked 2026-07-16) still lists '2021 International Mechanical Code' and has not been updated.2024 International Plumbing Code (IPC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(d); supersedes the 2021 edition. Tremonton's own Building Criteria document (live-checked 2026-07-16) still lists '2021 International Plumbing Code' and has not been updated.2021 International Property Maintenance Code (IPMC) — per the same document; not adopted or superseded by § 15A-2-103, which does not list an IPMC edition, so this entry is unaffected by the 7/1/2026 amendment2024 International Energy Conservation Code (IECC), single unsplit statewide edition — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(h); supersedes the 2021 edition. Tremonton's own Building Criteria document (live-checked 2026-07-16) still lists '2021 Energy Conservation Code' and has not been updated.2023 National Electrical Code (NEC) — CURRENT statewide per Utah Code § 15A-2-103(1)(g); UNCHANGED by the 7/1/2026 amendment (2023 has been the statewide NEC edition since before this cycle). Tremonton's own Building Criteria document (live-checked 2026-07-16, still hosted at the same URL) lists '2020 National Electrical Code,' which is NOT a valid statewide-adopted edition and has not been corrected by the City — the statute controls. Confirm the currently enforced NEC edition directly with the Building Department before relying on the City's own document for a live project.1997 Edition of the Uniform Code for the Abatement of Dangerous Buildings — per the same document; not governed by § 15A-2-1032017 Edition of the ICC/ANSI A117.1 Standard for Accessibility — per the same document; not governed by § 15A-2-1032024 International Existing Building Code (IEBC) — statewide per Utah Code § 15A-2-103(1)(i); not itemized in Tremonton's own Building Criteria document, added here per statute since the City's own materials omit it.Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — statewide per Utah Code § 15A-2-103(1)(n); not itemized in Tremonton's own Building Criteria document, added here per statute since the City's own materials omit it.MBI 1200 and MBI 1205 (manufactured/modular construction standards) — statewide per Utah Code § 15A-2-103(1)(o); not itemized in Tremonton's own Building Criteria document, added here per statute since the City's own materials omit it.NOTE (2026-07-16 re-verification): Utah Code § 15A-2-103, version effective 7/1/2026 (superseded 1/1/2027), took effect 15 days before this re-verification. IBC/IPC/IMC/IFGC/IECC/IEBC/residential ISPSC are now 2024 statewide; IRC (2021) and NEC (2023) did NOT change from the prior cycle. Tremonton's own Building Criteria PDF (tremontoncity.gov/wp-content/uploads/2024/04/BUILDING-DESIGN-CRITERIA.pdf) was re-fetched live 2026-07-16 and still lists 2021 IBC/IFGC/IMC/IPC/'2021 Energy Conservation Code' and an outright incorrect '2020 National Electrical Code' — none of these have been updated by the City to reflect the statewide 7/1/2026 transition or the pre-existing 2023 NEC requirement. The statute is cited directly as governing throughout; the City's lagging document is preserved above as recorded history, not deleted.

Permit types & fees

Residential Building Permit

Verified

Required for new single-family dwelling construction, residential outbuildings, and any work regulated by the adopted 2024 IBC / 2021 IRC in Tremonton (2024 IBC current per Utah Code § 15A-2-103(1)(a) effective 7/1/2026; IRC remains 2021 per § 15A-2-103(1)(b)). Permit fee is valuation-based (1% of Building Valuation per the ICC Building Valuation Table) rather than a flat fee, per the City's official Consolidated Fees and Fines Schedule (Resolution No. 25-42, effective August 26, 2025).

Verified 2026-07-08 · Source

Requirements

  • New single-family dwelling or residential outbuilding construction
  • Any work regulated by the adopted 2024 IBC / 2021 IRC
  • Plans submitted electronically via the City's CivicReview portal, drawn to scale by a Structural Engineer or Architect licensed in Utah for non-conventional designs
  • Sidewalks required along all street frontages per Tremonton City Code § 1.28.015 (waivable by written request to the Land Use Authority Board)

Required documents

  • RequiredEngineered Plan SetRequired for Home, Outbuilding, or ADU applications per the City's official Building & Solar Permit Requirements page.
  • RequiredPlot PlanSite/plot plan on regular size (8.5" x 11") paper, scale no less than 1 inch = 20 feet, showing applicant info, subdivision/lot number, site square footage, setbacks, property lines, easements, and adjacent streets/alleys, per Tremonton City Code § 1.28.025(B).
  • RequiredWall Section PlanRequired residential submittal item per the Building & Solar Permit Requirements page.
  • RequiredFloor PlanMust show the use of all rooms; unfinished rooms may be considered storage but future use should be indicated, per the Building & Solar Permit Requirements page.
  • RequiredRes-CheckUtah Model Energy Code compliance checklist for residential construction, per the Building & Solar Permit Requirements page (equivalent to the 'Model Energy Code Check List' referenced in Tremonton City Code § 1.28.025(C)).
  • OptionalProof of SepticRequired only in areas without municipal sewer availability; approved through the Bear River Health Department (435-257-3318), per the Building & Solar Permit Requirements page.
  • RequiredContractor's State LicensePhotocopy of State of Utah contractor's license required for all contractors; owner-builders intending to occupy the structure are exempt, per Tremonton City Code § 1.28.025(E).

Fee schedule

Fee typeAmountNotes
Permit Fee (valuation-based)1% of Building Valuation
Tremonton City Consolidated Fees and Fines Schedule, Resolution No. Show full citation

Tremonton City Consolidated Fees and Fines Schedule, Resolution No. 25-42 (effective 08/26/2025), Section 3.1 'Residential Dwelling & Residential Outbuilding Inspection Fees'. Building Valuation is determined according to the most recent Building Valuation Table from the International Code Council. Each project is also assessed a separate State Fee (below).

State Fee1% of the Permit FeeResolution No. 25-42, Section 3.1. Statutory state surcharge collected alongside the local Permit Fee.
Plan Review Fee (residential & outbuilding)35% of the Permit Fee and State FeeResolution No. 25-42, Section 3.2 'Residential & Outbuilding Plan Review Fees'.
Garbage Can Purchase (new residential unit)See Garbage Can Setup Fee, $150.00Resolution No. 25-42, Section 3.1 footnote and Section 8.1: property owners pay the purchase cost of the first garbage can when applying for a building permit for a new residential unit; the City retains ownership of the can.
Re-inspection Fee$90.00Resolution No. 25-42, Section 3.1 'Residential Dwelling & Residential Outbuilding Inspection Fees'.

Commercial / Industrial Building Permit

Verified

Required for new commercial and industrial construction in Tremonton. Requires professionally drawn plans wet-stamped by a State of Utah licensed Engineer or Architect. Uses the same valuation-based fee structure as residential but with a substantially higher plan review percentage.

Verified 2026-07-19 · Source

Requirements

  • New commercial, industrial, institutional, or governmental construction
  • Plans must be professionally drawn and include a Utah-licensed Engineer or Architect wet stamp prior to final review or permit issuance, per the City's official Building & Solar Permit Requirements page
  • Water rights dedication to the City required for Industrial, Commercial, Institutional, and Multi-Family Dwelling uses prior to permit issuance, per Tremonton City Code § 1.28.035(B)(7)

Required documents

  • RequiredArchitectural Plans and Cover SheetRequired commercial submittal item per the Building & Solar Permit Requirements page.
  • RequiredStructural Engineered Plan SetMust be drawn/engineered and stamped by a licensed Architect and/or Structural Engineer in the State of Utah for all commercial and industrial plans, per the Building & Solar Permit Requirements page.
  • RequiredCom-CheckCommercial energy code compliance checklist, per the Building & Solar Permit Requirements page.
  • OptionalFire Sprinkler PlanRequired if applicable, per the Building & Solar Permit Requirements page.
  • RequiredADA Accessibility PlanRequired commercial submittal item, consistent with the City's adopted 2017 ICC/ANSI A117.1 Standard for Accessibility.

Fee schedule

Fee typeAmountNotes
Permit Fee (valuation-based)1% of Building ValuationResolution No. 25-42, Section 3.3 'Industrial, Institutional, Commercial, & Governmental Inspection Fees'. Building Valuation determined per the most recent ICC Building Valuation Table.
State Fee1% of the Permit FeeResolution No. 25-42, Section 3.3.
Plan Review Fee (commercial/industrial/institutional/governmental)65% of the Permit Fee and State FeeResolution No. 25-42, Section 3.4 'Industrial, Institutional, Commercial, & Governmental Plan Review Fees'. A $200.00 deposit is required with plan submission; no plan review costs are refunded once the review is completed.

Solar Panel (PV) Permit

Verified

Required for residential and commercial rooftop or ground-mounted solar photovoltaic installations in Tremonton. The City publishes a dedicated Solar Permit Requirements checklist distinct from its standard residential/commercial submittal lists.

Verified 2026-07-08 · Source

Requirements

  • Structural engineering letter confirming the roof or mounting structure can support the added solar array load
  • Site plan showing system layout
  • One-line electrical diagram
  • Module, inverter, and (if applicable) battery specifications
  • Signage plan for required solar disconnect/warning labeling
  • Interior and exterior photos of panels and system components

Required documents

  • RequiredStructural Engineering and LetterRequired per the City's official Building & Solar Permit Requirements page, 'Solar Permit Requirements' section.
  • RequiredSite PlanRequired per the Solar Permit Requirements checklist.
  • RequiredOne-Line DiagramRequired per the Solar Permit Requirements checklist.
  • RequiredModule and Inverter SpecificationsManufacturer specification sheets, required per the Solar Permit Requirements checklist.
  • OptionalBattery SpecificationsRequired if an energy storage system is part of the installation, per the Solar Permit Requirements checklist.
  • RequiredSignage PlanRequired per the Solar Permit Requirements checklist.
  • RequiredPhotos (Interior and Exterior Panels / System Components)Required per the Solar Permit Requirements checklist.

Fee schedule

Fee typeAmountNotes
Permit Fee (valuation-based, residential)1% of Building Valuation
Tremonton's fee resolution (No. 25-42) does not list a separate line-item solar fee; Show full citation

Tremonton's fee resolution (No. 25-42) does not list a separate line-item solar fee; solar installations are billed under the same Section 3.1 Residential Dwelling & Residential Outbuilding valuation-based Permit Fee (1% of Building Valuation) plus the standard State Fee (1% of Permit Fee) that applies to all residential building permits. No dedicated 'solar permit' fee line exists in the official schedule as of Resolution 25-42 (08/26/2025).

State Fee1% of the Permit FeeResolution No. 25-42, Section 3.1, applies to all residential permits including solar.

Re-Roofing Permit

Verified

Required for roof replacement/re-roofing in Tremonton. The City publishes a distinct flat fee for re-roofing, separate from its general valuation-based building permit fee.

Verified 2026-07-08 · Source

Requirements

  • Complete roof replacement (tear-off and re-roof)

Required documents

  • RequiredBuilding Permit Application (CivicReview)Submitted electronically via app.civicreview.com per the City's Building & Solar Permit Requirements page.

Fee schedule

Fee typeAmountNotes
Re-Roofing Permit Fee$150.00Tremonton City Consolidated Fees and Fines Schedule, Resolution No. 25-42, Section 3.5 'Miscellaneous Building Inspection Service Fees': 'Re-Roofing Permit — $150.00.'

Water Heater / Furnace / Electric Meter Permit (Standalone Trade)

Verified

Required for standalone water heater, furnace, or electric meter installation/replacement in Tremonton, each billed as a distinct flat Miscellaneous Building Inspection Service fee.

Verified 2026-07-08 · Source

Requirements

  • Standalone water heater installation or replacement
  • Standalone furnace installation or replacement
  • Standalone electric meter work

Required documents

  • RequiredBuilding Permit Application (CivicReview)Submitted electronically via app.civicreview.com per the City's Building & Solar Permit Requirements page.

Fee schedule

Fee typeAmountNotes
Water Heater Permit$75.00Resolution No. 25-42, Section 3.5 Miscellaneous Building Inspection Service Fees.
Furnace Permit$75.00Resolution No. 25-42, Section 3.5.
Electric Meter Permit$75.00Resolution No. 25-42, Section 3.5.
Small Scale Remodel or Construction — Electrical Inspection Only$60.00Resolution No. 25-42, Section 3.1.
Small Scale Remodel or Construction — Plumbing Inspection Only25% of the Permit Fee and State FeeResolution No. 25-42, Section 3.1.
Small Scale Remodel or Construction — Mechanical Inspection Only25% of the Permit Fee and State FeeResolution No. 25-42, Section 3.1.

Manufactured Home / Mobile Home Permit

Verified

Required for placement of manufactured or mobile homes in Tremonton. Manufactured/Modular Homes must comply with the Residential Architectural Standards in the City's Supplementary Regulations, per Tremonton City Code § 1.28.035(B)(5)-(6).

Verified 2026-07-08 · Source

Requirements

  • Manufactured Homes or Mobile Homes must comply with applicable standards in Chapter 19 Supplementary Regulations, per Tremonton City Code § 1.28.035(B)(5)
  • Must comply with the Residential Architectural Standards contained in Chapter 19 Supplementary Regulations, per § 1.28.035(B)(6)

Required documents

  • RequiredBuilding Permit Application (CivicReview)Submitted electronically via app.civicreview.com per the City's Building & Solar Permit Requirements page.

Fee schedule

Fee typeAmountNotes
Mobile Home / Manufactured Housing Fee$150.00Resolution No. 25-42, Section 3.5 Miscellaneous Building Inspection Service Fees: 'For all Mobile Homes and Manufactured Housing — $150.00.'

Commercial Tenant Improvement / Tenant Finish Permit

Verified

Tremonton does not publish a separate tenant-improvement fee category. The City's Consolidated Fees and Fines Schedule (Resolution No. 25-42, effective 08/26/2025), Sections 3.3-3.4, bills all 'Industrial, Institutional, Commercial, & Governmental' work -- new construction, additions, and interior tenant-improvement/remodel projects alike -- under the same uniform structure: a 1%-of-Building-Valuation Permit Fee, a 1%-of-Permit-Fee State Fee, and a 65%-of-(Permit Fee + State Fee) Plan Review Fee (versus the 35% residential rate), with no separate tenant-improvement or commercial-remodel line item anywhere in the schedule. This is confirmed by direct read of the full Section 3.3/3.4 fee tables, which list only 'Permit Fee' and 'State Fee' (3.3) and 'Plan Review Fee' (3.4) rows -- no tenant-improvement or remodel sub-category exists on the commercial side, in contrast to Section 3.1's residential-only 'Small Scale Remodel or Construction' reduced-rate carve-outs (e.g., $60.00 electrical-only inspection).

Verified 2026-07-19 · Source

Requirements

  • Interior tenant-improvement/build-out or remodel of an existing commercial, industrial, institutional, or governmental space
  • Plans professionally drawn and wet-stamped by a Utah-licensed Engineer or Architect prior to final review or permit issuance -- the same requirement stated for new commercial construction on the City's official Building & Solar Permit Requirements page
  • Com-Check commercial energy code compliance checklist, where the tenant-improvement scope affects the building envelope, lighting, or mechanical systems
  • Submitted electronically via the City's CivicReview portal (app.civicreview.com), the same portal used for new commercial/industrial permits

Required documents

  • RequiredStructural Engineered Plan SetRequired for commercial/industrial plans per the Building & Solar Permit Requirements page; applies to tenant-improvement scopes involving structural, life-safety, or MEP work.
  • RequiredArchitectural Plans and Cover SheetRequired commercial submittal item per the Building & Solar Permit Requirements page.
  • OptionalCom-CheckCommercial energy code compliance checklist, required where the tenant-improvement scope affects the building envelope or mechanical/lighting systems.

Fee schedule

Fee typeAmountNotes
Permit Fee (valuation-based)1% of Building Valuation
Tremonton City Consolidated Fees and Fines Schedule, Resolution No. Show full citation

Tremonton City Consolidated Fees and Fines Schedule, Resolution No. 25-42 (effective 08/26/2025), Section 3.3 'Industrial, Institutional, Commercial, & Governmental Inspection Fees' -- the same table applies to tenant-improvement/interior-remodel work as to new commercial/industrial construction; no separate tenant-improvement fee line exists in the schedule.

State Fee1% of the Permit FeeResolution No. 25-42, Section 3.3.
Plan Review Fee (commercial/industrial/institutional/governmental)65% of the Permit Fee and State FeeResolution No. 25-42, Section 3.4. A $200.00 deposit is required with plan submission; no plan review costs are refunded once the review is completed. Applies uniformly to tenant-improvement/remodel plan review, same as new commercial construction.

Sources & verification

Verified against official sources. Last reviewed 2026-07-08.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Tremonton building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-07-16)Later version (2026-07-20) →View current record →All versions →

Permalink: /utah/box-elder-county/tremonton/as-of/2026-07-19/

Snapshot date: 2026-07-19

Commit: 514bf3c

Reproducible from PermitBase’s version-controlled dataset, commit 514bf3c.