This is PermitBase’s published record for North Logan as of 2026-07-19. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.
North Logan building permits
VerifiedNorth Logan, Utah — as published 2026-07-19.
Verified 2026-07-08 · Source
Codes adopted
Permit types & fees
Residential Building Permit
VerifiedRequired for new single-family residential construction and any structure over 200 sq ft in North Logan. Must be preceded by a Zoning Clearance (Step 1) before the Building Permit (Step 2) can be requested. Fee is valuation-based under the 1997 Uniform Building Code Table No. 3-A, adjusted annually by CPI, per North Logan Municipal Code § 9-205 and the city's Master Fee Schedule.
Verified 2026-07-08 · Source
Requirements
- New single-family residential construction, or any structure over 200 sq. ft.
- Zoning Clearance (Step 1) must be obtained first via the CivicReview portal before a Building Permit application can be submitted — applies to primary structures, accessory structures, agricultural structures, signs, fences, pools, or retaining walls over 3 feet in height
- Written application accompanied by 2 sets of plans and specifications stating the specific nature of construction, per NLMC § 9-203
- Soils Hazard Mitigation Plan required if the site's NRCS soils rating is 'very limited,' per NLMC § 9-206
- Concrete inspection required for curb, gutter, and sidewalk work, with at least 24-hour advance notice
Required documents
- RequiredZoning Clearance ApplicationSubmitted online via the CivicReview portal (app.civicreview.com); required before a Building Permit can be requested, per North Logan's official Building Department page.
- RequiredBuilding Permit Application (CityInspect)Submitted online via nlogan.cityinspect.com after Zoning Clearance approval; applicant uploads the zoning clearance approval letter along with applicable building plans, per North Logan's official Building Department page.
- Required2 Sets of Plans and SpecificationsRequired with the written building permit application per North Logan Municipal Code § 9-203; one set is retained by the Building Inspector.
- OptionalOwner/Builder Certification FormUtah Department of Commerce, Division of Occupational and Professional Licensing form, required when the owner acts as their own contractor; available as a downloadable PDF on North Logan's Building Department page.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee | As established in the 1997 Uniform Building Code (Table No. 3-A), adjusted annually by the CPI | North Logan Master Fee Schedule, 'Building Permit Fees' section (current as of 5/5/2026), citing North Logan Municipal Code § 9-205: 'The Treasurer shall collect a fee for the Building Permit from… Show full citationHideNorth Logan Master Fee Schedule, 'Building Permit Fees' section (current as of 5/5/2026), citing North Logan Municipal Code § 9-205: 'The Treasurer shall collect a fee for the Building Permit from the applicant in an amount in accordance with Table No. 3-A of the Uniform Building Code.' A down payment is due at application: Single Family Home $50; permits where the total fee is likely to be less than $100.00, $0 down payment. |
| Combined Electrical, Mechanical, Plumbing Permit Fee | 27.5% of the Building Permit Fee | North Logan Master Fee Schedule, 'Building Permit Fees' section (current as of 5/5/2026). |
| Road Impact Fee (Single Family Detached) | $2,432 per housing unit | North Logan Master Fee Schedule, 'Building Permit Fees' section — Road Impact Fee table, Residential (per housing unit), citing the North Logan Impact Fee Analysis report dated June 25, 2024. |
| Water Impact Fee (3/4-inch meter, standard residential) | $4,841 per meter | North Logan Master Fee Schedule, 'Building Permit Fees' section — Water Impact Fee table by meter size. |
| Residential Sewer Impact Fee (Single Family Residential) | $6,697 (North Service Area) or $4,039 (South Service Area) | North Logan Master Fee Schedule, 'Building Permit Fees' section — Residential Sewer Impact Fee table, varies by service area. |
| Parks & Trails Impact Fee (Residential) | $5,315 per household/housing unit | North Logan Master Fee Schedule, 'Building Permit Fees' section. |
| Logan City Imposed Wastewater Treatment Impact Fee (LCIWTIF) — Single Family Unit | $2,433.00 per unit (1 ERU multiplier) | North Logan Master Fee Schedule, 'Building Permit Fees' section, per Resolution 25-02 (2/19/2025); collected by North Logan and remitted per agreement with Logan City for wastewater treatment capacity. |
| Water Meter Fee | Direct market cost of meter and supplies, plus $60.00 installation fee | North Logan Master Fee Schedule, 'Building Permit Fees' section; cost verified by the Public Works Department. |
Combined Electrical, Mechanical, Plumbing Permit
VerifiedRequired for standalone electrical, mechanical, or plumbing work in North Logan not part of a new residential building permit. Exempt from the Zoning Clearance requirement and can be applied for directly. Fee is calculated as a percentage of what the corresponding Building Permit Fee would be. EV charger/EVSE installation is electrical work and falls under this combined Electrical, Mechanical, Plumbing Permit; North Logan's Master Fee Schedule does not publish a separate EV-charger fee line item.
Verified 2026-07-08 · Source
Requirements
- Electrical, mechanical, or plumbing work performed independently of new construction
- Exempt from Zoning Clearance (Step 1) — apply directly for the permit
- Subject to the adopted 2023 NEC (electrical), 2024 IMC (mechanical), and 2024 IPC (plumbing) per North Logan Municipal Code Title 9
Required documents
- RequiredBuilding Permit Application (CityInspect)Submitted online via nlogan.cityinspect.com; no Zoning Clearance approval letter required for these exempt permit types.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Combined Electrical, Mechanical, Plumbing Permit Fee | 27.5% of the Building Permit Fee | North Logan Master Fee Schedule, 'Building Permit Fees' section (current as of 5/5/2026). The underlying Building Permit Fee is calculated per the 1997 Uniform Building Code Table No. 3-A valuation table, adjusted annually by CPI, per North Logan Municipal Code § 9-205. |
Encroachment Permit
VerifiedRequired for work within the public right-of-way in North Logan, including street excavation, road cuts, boring, and utility trenching. Fees are structured around inspection and surety/cash bond deposits tied to the type and age of the disturbed surface.
Verified 2026-07-08 · Source
Requirements
- Required for any work within the public right-of-way
- Applies to street excavation, asphalt/concrete penetration, boring, and utility trenching
- Cash fee or surety bond required, refunded/released after 24 months if the excavation surface is accepted by a city official
Required documents
- RequiredEncroachment Permit Application (CivicReview)Submitted online via the CivicReview portal (app.civicreview.com), per North Logan's official Building Department page, 'Additional Permits' section.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Narrow Trench (<6" wide) Boring Permit Fee | $0.60 per linear foot | North Logan Master Fee Schedule, 'Other Construction Related Permits' section, Street Excavation Permits or Encroachment Permits table. |
| Road Cut — No Disturbance of Asphalt / Road >3 years | $1,000.00 non-refundable fee plus $500.00 deposit; if disturbed area exceeds 300 sq ft, $3.50 per sq ft of asphalt disturbed | North Logan Master Fee Schedule, 'Other Construction Related Permits' section. |
| New Road Cut Permit Fee (<3 years) | $5,000.00 non-refundable fee plus $500.00 deposit; if disturbed area exceeds 300 sq ft, $16.50 per sq ft of asphalt disturbed | North Logan Master Fee Schedule, 'Other Construction Related Permits' section. |
| Asphalt or Concrete Surface Penetration | $25.00 non-refundable inspection fee plus cash fee or surety bond of $200.00 or $3.00 per sq ft, whichever is greater | North Logan Master Fee Schedule, 'Other Construction Related Permits' section. |
| Pothole Fee | $250 per pothole, non-refundable fee | North Logan Master Fee Schedule, 'Other Construction Related Permits' section. |
| Sidewalk, Street, Driveway, and Building Material on Street Permits | No fee, but applicant must pay any costs incurred by the city | North Logan Master Fee Schedule, 'Other Construction Related Permits' section. |
Commercial Building Permit
VerifiedRequired for new commercial building construction in North Logan. Governed by the same two-step Zoning Clearance (Step 1) + Building Permit (Step 2) process and the same 1997 Uniform Building Code Table No. 3-A valuation-based fee (NLMC § 9-205) as residential construction, but subject to a distinct commercial down payment tier and commercial-specific road, water, sewer, and wastewater-treatment impact fees per the North Logan Master Fee Schedule.
Verified 2026-07-19 · Source
Requirements
- New commercial building construction, or any structure over 200 sq. ft.
- Zoning Clearance (Step 1) must be obtained first via the CivicReview portal before a Building Permit application can be submitted — North Logan's official Building Department page describes this requirement as applying to 'the construction or modification of any permanent structure' with no residential/commercial carve-out
- Written application accompanied by 2 sets of plans and specifications stating the specific nature of construction, per NLMC § 9-203
- Down payment of $1,100 due at application for 'New building other than single family home,' per the North Logan Master Fee Schedule's Building Permit Fees down-payment table
- Soils Hazard Mitigation Plan required if the site's NRCS soils rating is 'very limited,' per NLMC § 9-206
- Concrete inspection required for curb, gutter, and sidewalk work, with at least 24-hour advance notice
Required documents
- RequiredZoning Clearance ApplicationSubmitted online via the CivicReview portal (app.civicreview.com); required before a Building Permit can be requested, per North Logan's official Building Department page (live-checked 2026-07-19).
- RequiredBuilding Permit Application (CityInspect)Submitted online via nlogan.cityinspect.com after Zoning Clearance approval; applicant uploads the zoning clearance approval letter along with applicable building plans, per North Logan's official Building Department page.
- Required2 Sets of Plans and SpecificationsRequired with the written building permit application per North Logan Municipal Code § 9-203; one set is retained by the Building Inspector. NLMC Title 9 does not itemize additional commercial-specific plan documents (e.g., a separate site plan or SWPPP requirement) beyond this general application requirement.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee | As established in the 1997 Uniform Building Code (Table No. 3-A), adjusted annually by the CPI | North Logan Master Fee Schedule, 'Building Permit Fees' section (fetched via print-preview 2026-07-19): 'Building Permit Fee*** As established in the 1997 Uniform Building Code adjusted annually by… Show full citationHideNorth Logan Master Fee Schedule, 'Building Permit Fees' section (fetched via print-preview 2026-07-19): 'Building Permit Fee*** As established in the 1997 Uniform Building Code adjusted annually by the CPI,' citing North Logan Municipal Code § 9-205. This is the same underlying valuation fee table used for residential construction; NLMC Title 9 does not publish a separate commercial fee table. |
| Down Payment — New Building Other Than Single Family Home | $1,100 | North Logan Master Fee Schedule, 'Building Permit Fees' section, down-payment table (fetched 2026-07-19): 'New building other than single family home $1,100.' Due when the applicant first applies for the building permit; Show full citationHideNorth Logan Master Fee Schedule, 'Building Permit Fees' section, down-payment table (fetched 2026-07-19): 'New building other than single family home $1,100.' Due when the applicant first applies for the building permit; forfeited to the city if the application is withdrawn after plan review or not completed, per the same section. |
| Combined Electrical, Mechanical, Plumbing Permit Fee | 27.5% of the Building Permit Fee | North Logan Master Fee Schedule, 'Building Permit Fees' section (fetched 2026-07-19): 'Combined Electrical, Mechanical, Plumbing Permit Fee — 27.5% of the Building Permit Fee.' |
| Zoning Clearance Fee | $125.00 | North Logan Master Fee Schedule, 'Development Fees' section, 'Misc. Development Fees' table (fetched 2026-07-19): 'Zoning Clearance fee $125.00.' Applies to the Step 1 Zoning Clearance required before the Step 2 Building Permit can be requested. |
| Road Impact Fee — Commercial/Industrial (per 1,000 sq. ft.) | Small Office Building $3,427; Medical or Dental Office Building $7,777; Apparel Store $13,887; Light Industrial $1,517; Warehousing $877; Manufacturing $1,487 | North Logan Master Fee Schedule, 'Building Permit Fees' section, Road Impact Fee table, Commercial/Industrial (per 1,000 square feet) (fetched 2026-07-19). Show full citationHideNorth Logan Master Fee Schedule, 'Building Permit Fees' section, Road Impact Fee table, Commercial/Industrial (per 1,000 square feet) (fetched 2026-07-19). Verbatim note in the same table: 'For building types other than those listed above, fee will be calculated by utilizing the Institute of Transportation Engineers (ITE) Manual and the North Logan Impact Fee Analysis report dated June 25, 2024.' |
| Water Impact Fee (by meter size) | 3/4-inch $4,841; 1-inch $8,084; 1.5-inch $16,120; 2-inch $25,801; 3-inch $72,611; 4-inch $161,342 | North Logan Master Fee Schedule, 'Building Permit Fees' section, Water Impact Fee table by meter size (fetched 2026-07-19) — the same table applies to commercial connections, which typically use larger meter sizes than the standard residential 3/4-inch meter. |
| Non-Residential Sewer Impact Fee (by pipe size) | North Service Area: 4-inch $6,697, 6-inch $15,068, 8-inch $26,788, 12-inch $60,274. South Service Area: 4-inch $4,039, 6-inch $9,088, 8-inch $16,157, 12-inch $36,353 | North Logan Master Fee Schedule, 'Building Permit Fees' section, 'Non-Residential Sewer Impact Fee' table by pipe size and service area (fetched 2026-07-19). 'For pipes other than those listed above, fee will be calculated by the "Capacity Ratio to 4" Sewer Pipe".' |
| Logan City Imposed Wastewater Treatment Impact Fee (LCIWTIF) — Non-Standard Impact Fee (Commercial/Industrial) | 2-inch Displacement Compound Meter (3.2 ERU multiplier): $7,786.00 minimum fee; 4-inch Compound Meter (10 ERU multiplier): $24,327.00 minimum fee; otherwise (actual GPD / 245 GPD) x $2,433.00 | North Logan Master Fee Schedule, 'Building Permit Fees' section, LCIWTIF table (fetched 2026-07-19): 'NON-STANDARD IMPACT FEE** ... Show full citationHideNorth Logan Master Fee Schedule, 'Building Permit Fees' section, LCIWTIF table (fetched 2026-07-19): 'NON-STANDARD IMPACT FEE** ... ** LCIWTIF Definition: Non-Standard Impact Fee: Defined as commercial and industrial facilities, and public facilities.' Per Resolution 25-02 (2/19/2025), same resolution cited for the residential LCIWTIF fee in this file. |
Commercial Tenant Improvement / Tenant Finish Permit
Required for interior remodel, tenant improvement, and tenant finish work in existing commercial buildings in North Logan, per NLMC § 9-201's general requirement that any alteration to a building or structure requires a building permit. North Logan does not publish a tenant-improvement-specific fee table separate from its general Building Permit Fee down-payment tiers, and its official materials do not explicitly state whether interior tenant improvement work triggers the Step 1 Zoning Clearance required for new/modified permanent structures.
Reviewed 2026-07-19 · Source
Requirements
- Alteration to an existing commercial building or structure — NLMC § 9-201 requires a permit for any construction or alteration of a building or structure (except a fence)
- Written application accompanied by 2 sets of plans and specifications stating the specific nature of the alteration, per NLMC § 9-203
- Down payment of $1,100 due at application if the remodel affects more than 3,000 sq. ft. of a building other than a single-family home AND requires structural changes; otherwise the $50 'all other permits' down payment tier applies, per the Master Fee Schedule's down-payment table
- Whether a Zoning Clearance (Step 1) is separately required is NOT explicitly stated for interior tenant improvement work — North Logan's Building Department page scopes Zoning Clearance to 'the construction or modification of any permanent structure,' with examples limited to primary/accessory/agricultural structures, signs, fences, pools, and retaining walls over 3 feet; interior finish work that does not modify the structure's exterior, footprint, or height is not listed as requiring or being exempt from Zoning Clearance
Required documents
- RequiredBuilding Permit Application (CityInspect)Submitted online via nlogan.cityinspect.com, per North Logan's official Building Department page.
- Required2 Sets of Plans and SpecificationsRequired with the written building permit application per North Logan Municipal Code § 9-203, describing the specific nature of the tenant improvement or remodel.
- OptionalZoning Clearance ApplicationRequired if the scope of work modifies a permanent structure (see requirements note above on the unresolved applicability to interior-only tenant improvement work); confirm with the Building Department, (435) 752-1310, before submitting a Building Permit application without it.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee | As established in the 1997 Uniform Building Code (Table No. 3-A), adjusted annually by the CPI | North Logan Master Fee Schedule, 'Building Permit Fees' section (fetched 2026-07-19), citing NLMC § 9-205. North Logan does not publish a separate tenant-improvement or commercial-remodel-specific fee table — the same valuation-based Table No. 3-A fee applies. |
| Down Payment — Remodel Other Than Single Family Home (>3,000 sq. ft. + structural changes) | $1,100 | North Logan Master Fee Schedule, 'Building Permit Fees' section, down-payment table (fetched 2026-07-19): 'Remodel to other than single family home affecting more than 3,000 sq. ft. and requiring structural changes $1,100.' |
| Down Payment — All Other Permits (below the 3,000 sq. ft./structural-change threshold) | $50 | North Logan Master Fee Schedule, 'Building Permit Fees' section, down-payment table (fetched 2026-07-19): 'All other permits $50.' Applies to smaller tenant improvement/remodel scopes that don't meet the $1,100 tier's size and structural-change criteria. |
| Combined Electrical, Mechanical, Plumbing Permit Fee | 27.5% of the Building Permit Fee | North Logan Master Fee Schedule, 'Building Permit Fees' section (fetched 2026-07-19) — applies if the tenant improvement scope includes electrical, mechanical, or plumbing trade work. |
Photovoltaic (PV) System Permit
Required for installation of a residential or commercial photovoltaic (solar) system in North Logan. Unlike a standard standalone electrical permit, PV installations follow their own documented submittal process — a dedicated Permit Application, plans emailed directly to the Building Department, and a PV System Plan Check Worksheet used to verify NEC code compliance. The underlying permit fee itself is the same valuation-based Building Permit Fee plus the 27.5% Combined Electrical/Mechanical/Plumbing Permit Fee documented in this file's electrical-mechanical-plumbing-permit entry — North Logan does not publish a separate dollar-amount solar fee tier — but the application path, required worksheet, and a $50 non-refundable deposit are solar-specific and distinct from other trade permits.
Reviewed 2026-07-19 · Source
Requirements
- Permit Application identifying the primary contractor and any subcontractors, including contractor license numbers
- Plans submitted electronically in PDF format, emailed to plans@northlogancity.org (per the city's dedicated PV permit process page, archived 2024-02-28; a stamped copy is returned by email once approved)
- Structural plans required if the installation involves modification of a building or construction of any supporting structure for the PV system
- PV System Plan Check Worksheet completed and submitted with the plans — covers site diagram, one-line diagram, array configuration, equipment/system grounding, disconnect and point-of-connection details, inverter listing/utility-interactivity status, PV module listing and Pmax voltage/current, ground-fault and DC arc-fault protection (NEC 690.7/690.8/690.11), and for roof-mounted arrays, structural calculations and roof-attachment details, or for ground-mounted arrays, foundation/footing and mounting-structure details
- $50.00 non-refundable deposit due at submittal of the permit application and documents, applied toward the final calculated fees
Required documents
- RequiredPermit ApplicationIdentifies the primary contractor and subcontractors with license numbers; downloadable from the city's Building Department page.
- RequiredPV System Plan Check WorksheetNorth Logan's official worksheet for verifying NEC code compliance of the proposed PV system — covers supplied diagrams, inverter information, PV module information, array information (ground-fault/arc-fault protection, max array voltage, short-circuit current), and roof- or ground-mounting structural details. Listed as a current Building Department resource on northlogancity.gov (live-checked 2026-07-19); PDF text extracted from a 2016-dated version of the worksheet via Wayback Machine archive.
- OptionalStructural PlansRequired if the installation modifies a building or involves construction of a supporting structure for the PV system.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| PV System Application Deposit | $50.00 (non-refundable, applied toward final fees) | North Logan City 'Permit Process for Photovoltaic (PV) Systems' page: 'A $50.00 deposit will be required when the permit application and documents are submitted. Show full citationHideNorth Logan City 'Permit Process for Photovoltaic (PV) Systems' page: 'A $50.00 deposit will be required when the permit application and documents are submitted. This deposit is nonrefundable, but will be applied toward the fees calculated during permit finalization.' Sourced from a Wayback Machine archive dated 2024-02-28 (web.archive.org/web/20240228111527/https://northlogancity.org/permit-process-for-photovoltaic-pv-sytems/); the live page at this URL returns HTTP 404 as of 2026-07-19 re-check on the city's current React-based website, but the city's live Building Department page (northlogancity.gov/building, checked 2026-07-19) still lists a 'PV System Plan Check Worksheet' as a current Forms & Resources item, corroborating that PV permitting remains an active, distinct process. |
| Building Permit Fee + Combined Electrical, Mechanical, Plumbing Permit Fee | Building Permit Fee per 1997 UBC Table No. 3-A (adjusted annually by CPI) plus 27.5% of that fee for the combined electrical/mechanical/plumbing scope | Per the archived PV permit process page: 'The fees will include a building permit fee and impact fees. Show full citationHidePer the archived PV permit process page: 'The fees will include a building permit fee and impact fees. The amount of these fees will be calculated as part of the permit finalization process' — payment is due when the finalized permit is picked up, accepted only by check or cash. No PV-specific dollar-figure fee table is separately published; the underlying valuation-based Building Permit Fee (NLMC § 9-205) and 27.5% Combined Electrical/Mechanical/Plumbing Permit Fee (North Logan Master Fee Schedule, current as of 5/5/2026) documented elsewhere in this file are the applicable fees. |
Sources & verification
Verified against official sources. Last reviewed 2026-07-08.
Fee schedules
Online permit portal
Codes & ordinances
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the North Logan building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.