Centerville building permits
VerifiedCenterville, Utah — as published 2026-07-16.
Verified 2026-07-07 · Source
Codes adopted
Permit types & fees
Residential Building Permit (New Home / Addition / Remodel)
VerifiedRequired for new single-family/multi-family residential construction, additions, remodels, swimming pools, detached structures, and decks in Centerville, per the city's official Building Permit Application. The Permit Fee is valuation-based per Centerville City's own Total Building Valuation Chart (Fee Schedule § 4.010), not pegged to an outside ICC table.
Verified 2026-07-07 · Source
Requirements
- New single-family dwelling, multi-family/town home construction, addition, remodel, swimming pool, detached structure, or deck (per the official Building Permit Application permit-type checkboxes)
- Estimated permit valuation (dollar amount for the project, including market value of labor and materials) must be provided at time of application, per CMC § 10.04.120
- Licensed Contractor Declaration or Owner-Builder Declaration (with Owner-Builder Certification Form) required on the application
- $1,000 refundable Construction Bond due prior to issuance, per Fee Schedule § 4.010
Required documents
- RequiredBuilding Permit ApplicationOfficial Centerville City Community Development Department form (655 North 1250 West); submitted, with site plan and plans, by email to donna.wilkinson@centervilleutah.gov. 'New' Commercial Build and Large Tenant Finish projects require (2) sets of 24x36 plans for review.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee (valuation-based) | $1 to $500: $28.30. $501 to $2,000: $28.30 for the first $500 plus $23.66 per additional $1,000 or fraction, to $2,000. $2,001 to $25,000: $83.10 for the first $2,000 plus $16.80 per additional $1,000 or fraction, to $25,000. $25,001 to $50,000: $470.10 for the first $25,000 plus $12.12 per additional $1,000 or fraction, to $50,000. $50,001 to $100,000: $772.50 for the first $50,000 plus $8.40 per additional $1,000 or fraction, to $100,000. $100,001 to $500,000: $1,192.50 for the first $100,000 plus $6.72 per additional $1,000 or fraction, to $500,000. $500,001 to $1,000,000: $3,880.50 for the first $500,000 plus $5.70 per additional $1,000 or fraction, to $1,000,000. $1,000,001 and up: $6,730.50 for the first $1,000,000 plus $4.38 per additional $1,000 or fraction. | Centerville City Fee Schedule § 4.010 (Building Permits), 'Total Building Valuation Chart', adopted by Res. 2017-18 on 8/15/2017 — this remains the currently codified table per the live municipal code fee book as of 2026-07-07 (no later amending resolution is listed against Chapter 4 in the code's own history log). |
| Residential Building Plan Review Fee | 25% of Building Permit Fee | Centerville City Fee Schedule § 4.040 (Plan Reviews), 'Residential Building Plan Review (including single-family dwellings, private garages, carports, and sheds)', adopted by Res. 2017-18. Due prior to issuance. |
| Construction Bond (refundable) | $1,000.00 | Centerville City Fee Schedule § 4.010, 'Construction Bond ... refundable upon final approval.' Due prior to issuance. |
| Permit Fee for Work Commenced Without a Permit | Applicable Permit Fee + 50% | Centerville City Fee Schedule § 4.010. |
| Temporary Certificate of Occupancy | $50.00 | Centerville City Fee Schedule § 4.010, subject to CMC § 10.06.050. |
| Extension of Temporary Certificate of Occupancy | $25.00 | Centerville City Fee Schedule § 4.010, subject to CMC § 10.06.050. |
| Identical (Cardfile) Plan Check — Single-Family Residential | $70.00 | Centerville City Fee Schedule § 4.040, 'Indentical (Cardfile) Plan Check ... Single-Family Residential - $70.' Due prior to issuance. |
Roofing Permit
VerifiedRequired for new felt/roofing material, decking replacement, or structural changes to a roof in Centerville, per the city's official Roofing Permit Application. Structural changes require submission of structural calculations and a plan review with additional fees.
Verified 2026-07-07 · Source
Requirements
- New felt, decking replacement, or structural changes to roofing
- Structural changes require submission of structural calculations and are subject to a Plan Review with additional fees added to the permit cost
- Licensed Contractor Declaration or Owner-Builder Declaration (with Certification Form)
Required documents
- RequiredRoofing Permit ApplicationOfficial Centerville City form; email completed application to donna.wilkinson@centervilleutah.gov.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Roofing Permit Fee | $141.40 | Centerville City official Roofing Permit Application (PDF): 'PERMIT FEE ... $141.40 (Credit/Debit Card Payments Accepted).' This figure is more current/precise than the flat $70 'Building Permit' minor-trade figure shown in the codified Fee Schedule table (Res. 2017-18); the standalone application PDF is the operative fee document for this specific permit type as of 2026-07-07. |
Plumbing Permit
VerifiedRequired for water heater installation/replacement, tankless water heaters, or new plumbing work in Centerville, per the city's official Plumbing Permit Application.
Verified 2026-07-07 · Source
Requirements
- Water heater (new or replacement)
- Tankless water heater — requires a schematic; no over-the-counter issuance, must be reviewed
- New plumbing work (described on the application)
- Licensed Contractor Declaration or Owner-Builder Declaration
Required documents
- RequiredPlumbing Permit ApplicationOfficial Centerville City form; email completed application to donna.wilkinson@centervilleutah.gov.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Plumbing Permit Fee | $70.70 | Centerville City official Plumbing Permit Application (PDF): 'PERMIT FEE ... $70.70 (Credit/Debit Card Payments Accepted, Check or Cash).' This precise figure supersedes the flat $70 'Plumbing Permit' figure in the codified Fee Schedule table (Res. 2017-18) as the operative current fee. |
Mechanical Permit
VerifiedRequired for furnace/air conditioner installation or replacement, or gas line new/upgrade/removal work in Centerville, per the city's official Mechanical Permit Application.
Verified 2026-07-07 · Source
Requirements
- Furnace (new or replacement)
- Air conditioner (new or replacement)
- Gas line (new or upgrade)
- Gas line (removal)
- Licensed Contractor Declaration or Owner-Builder Declaration
Required documents
- RequiredMechanical Permit ApplicationOfficial Centerville City form; email completed application to donna.wilkinson@centervilleutah.gov.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Mechanical Permit Fee | $70.70 | Centerville City official Mechanical Permit Application (PDF): 'PERMIT FEE ... $70.70 (Credit/Debit Card Payments Accepted, Check or Cash).' |
Electrical Permit
VerifiedRequired for power service upgrades, power to panel work, temporary power pedestals, EV charging stations, or meter-mounted transfer switches (solar/generator) in Centerville, per the city's official Electrical Permit Application. 'EV Charging Station' is its own explicit checkbox on the application (confirmed by direct PDF review 2026-07-19), but Centerville does not bill it as a distinct fee — it is billed at the same standard $70.70 permit fee as the other checkbox categories, unless the installation also requires Power to Panel work ($141.40) or a service upgrade.
Verified 2026-07-07 · Source
Requirements
- Power service upgrade (amperage and work order number specified)
- Power to panel — outside service box, inside panel, or both (higher fee for both)
- Temporary power pedestal
- EV charging station
- Meter-mounted transfer switch (solar or generator) — must be inspected prior to meter set
- Licensed Contractor Declaration or Owner-Builder Declaration
Required documents
- RequiredElectrical Permit ApplicationOfficial Centerville City form; email completed application to donna.wilkinson@centervilleutah.gov.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Electrical Permit Fee (standard) | $70.70 | Centerville City official Electrical Permit Application (PDF): 'PERMIT FEE ... $70.70 (Credit/Debit Card Payments Accepted, Check or Cash).' |
| Power to Panel — Outside & Inside Panel | $141.40 | Centerville City official Electrical Permit Application (PDF): 'POWER TO PANEL ... Outside & Inside Panel (Fee $141.40).' |
Solar Panel (PV) Permit
VerifiedRequired for solar panel installations, battery backup for solar systems, and meter-mounted transfer switches for solar systems in Centerville, per the city's official Solar Permit Application and Solar Array Permit Requirements document. This is the only Centerville permit type with a city-published numeric review-timeline commitment.
Verified 2026-07-07 · Source
Requirements
- Structural engineer's letter confirming existing trusses support solar panel loads, indicating wind loads of 140 MPH
- Complete set of construction drawings and one-line electrical diagram(s)
- Roof layout and panel locations meeting clearance-to-peak/hips/valleys/pathways requirements per the adopted International Fire Code (IFC)
- Complete manufacturer specifications for micro-inverters, modules/panels, disconnect switches, any new AC panelboards, and the supporting racking system
- Any detached structure on the property receiving panels must be shown
- Plans must be submitted to South Davis Metro Fire Agency (sdmetrofire.gov, Plan Review) for a separate fire plan review, with a $100 fee for the first hour of review, paid before review begins
- After fire approval, email the Centerville City Solar Permit Application plus the fire-approved (stamped and dated) plans/specifications to donna.wilkinson@centervilleutah.gov
Required documents
- RequiredSolar Permit ApplicationOfficial Centerville City form covering solar panels, battery backup, and meter-mounted transfer switch permit types.
- RequiredSolar Array Permit Requirements documentOfficial Centerville City Building & Safety Department document detailing structural, fire-review, and submittal requirements for solar installations.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Solar Panels Permit Fee | $379.76 | Centerville City official Solar Permit Application (PDF): 'SOLAR PANELS (FEE $379.76).' |
| Battery Backup for Solar System | $70.70 | Centerville City official Solar Permit Application (PDF): 'BATTERY BACKUP FOR SOLAR SYSTEM (FEE $70.70).' |
| Meter-Mounted Transfer Switch for Solar System | $70.70 | Centerville City official Solar Permit Application (PDF): 'METER-MOUNTED TRANSFER SWITCH FOR SOLAR SYSTEM (FEE $70.70).' |
| South Davis Metro Fire Agency Plan Review Fee | $100 for the first hour of review | Centerville City official Solar Array Permit Requirements document: fire plan review is required prior to City submittal, with payment due before review begins; contact sdmetrofire.gov or 801-677-2400. |
Grading Permit
VerifiedRequired for grading activities within Centerville, with fees based on total cubic yards of material moved, per the city's official Fee Schedule § 4.020.
Verified 2026-07-07 · Source
Requirements
- Grading activity within city limits
- Fee based on total cubic yards graded (see fee tiers)
Required documents
- RequiredGrading Permit ApplicationApplication per Centerville Municipal Code Title 10 grading-permit provisions; combined Grading Permit Fee and Grading Plan Review Fee due prior to issuance.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Grading Permit Fee (by cubic yards) | Less than 100 cubic yards: $70. 101-1,000 cubic yards: $99 for the first 100 cubic yards, plus $17.50 per additional 100 cubic yards or fraction. 1,001-10,000 cubic yards: $256.50 for the first 1,000 cubic yards, plus $14.50 per additional 1,000 cubic yards or fraction. 10,001-100,000 cubic yards: $387 for the first 10,000 cubic yards, plus $66 per additional 10,000 cubic yards or fraction. 100,001+ cubic yards: $981 for the first 100,000 cubic yards, plus $36.50 per additional 10,000 cubic yards or fraction. | Centerville City Fee Schedule § 4.020 (Grading Permits), 'Grading Permit Fee Chart,' adopted by Res. 2017-18 on 8/15/2017. |
| Permit Fee for Work Commenced Without a Permit | Applicable Permit Fee + 50% | Centerville City Fee Schedule § 4.020. |
Commercial Building Permit
VerifiedRequired for new commercial, industrial, or multi-family building construction in Centerville, governed by the 2024 IBC (Utah Code § 15A-2-103(1)(a), effective 7/1/2026; Centerville's own Municipal Code Title 10.03 is confirmed still codified at the 2021 IBC as of live re-check 2026-07-16 — see codesAdopted note). The base Building Permit Fee is calculated from the same Total Building Valuation Chart (Fee Schedule § 4.010) used for residential permits, but Commercial/Industrial/Multi-Family projects are billed a separate, higher Plan Review rate under Fee Schedule § 4.040.
Verified 2026-07-19 · Source
Requirements
- New commercial, industrial, or multi-family building construction (per the official Building Permit Application permit-type checkboxes)
- Estimated permit valuation must be provided at time of application, per CMC § 10.04.120
- 'New' Commercial Build projects require (2) sets of 24x36 plans for review, per the official Building Permit Application
- Licensed Contractor Declaration required on the application
- $1,000 refundable Construction Bond due prior to issuance, per Fee Schedule § 4.010
Required documents
- RequiredBuilding Permit ApplicationOfficial Centerville City Community Development Department form (655 North 1250 West); submitted, with site plan and (2) sets of 24x36 plans, by email to donna.wilkinson@centervilleutah.gov.
- RequiredConstruction Plans (2 sets, 24x36)Per the official Building Permit Application: 'New' Commercial Build projects require two sets of 24x36 plans for review.
- OptionalEnergy Code Compliance DocumentationCOMcheck or equivalent demonstrating compliance with the adopted commercial IECC (2024 statewide, per Utah Code § 15A-2-103(1)(h)).
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee (valuation-based, Total Building Valuation Chart) | $1 to $500: $28.30. $501 to $2,000: $28.30 for the first $500 plus $23.66 per additional $1,000 or fraction, to $2,000. $2,001 to $25,000: $83.10 for the first $2,000 plus $16.80 per additional $1,000 or fraction, to $25,000. $25,001 to $50,000: $470.10 for the first $25,000 plus $12.12 per additional $1,000 or fraction, to $50,000. $50,001 to $100,000: $772.50 for the first $50,000 plus $8.40 per additional $1,000 or fraction, to $100,000. $100,001 to $500,000: $1,192.50 for the first $100,000 plus $6.72 per additional $1,000 or fraction, to $500,000. $500,001 to $1,000,000: $3,880.50 for the first $500,000 plus $5.70 per additional $1,000 or fraction, to $1,000,000. $1,000,001 and up: $6,730.50 for the first $1,000,000 plus $4.38 per additional $1,000 or fraction. | Centerville City Fee Schedule § 4.010 (Building Permits), 'Total Building Valuation Chart,' adopted by Res. 2017-18 on 8/15/2017; re-confirmed live via browser render of centerville.municipalcodeonline.com/book?type=fees 2026-07-19. This is the same table used for residential permits — Centerville does not maintain a separate commercial valuation chart. |
| Commercial, Industrial, Multi-Family Building Plan Review | 65% of Building Permit Fee (plus actual billing cost for any peer review) | Centerville City Fee Schedule § 4.040 (Plan Reviews): 'Commercial, Industrial, Multi-Family Building Plan Review (excluding single-family dwellings, private garages, carports, sheds, and agricultural buildings) — 65% of Building Permit Fee (Peer review to be added fee of actual billing to City). Prior to Issuance.' Confirmed live 2026-07-19 — more than double the 25% residential plan-review rate. |
| Identical (Cardfile) Plan Check — Commercial, Industrial and Multi-Family | $140.00 | Centerville City Fee Schedule § 4.040: 'Indentical (Cardfile) Plan Check ... Commercial, Industrial and Multi-Family - $140.' (Twice the $70 single-family-residential cardfile rate.) Due prior to issuance. |
| Construction Bond (refundable) | $1,000.00 | Centerville City Fee Schedule § 4.010, 'Construction Bond ... refundable upon final approval.' Due prior to issuance; same flat figure applies to residential and commercial permits — the fee schedule does not publish a separate, larger commercial bond amount. |
| Permit Fee for Work Commenced Without a Permit | Applicable Permit Fee + 50% | Centerville City Fee Schedule § 4.010. |
Commercial Tenant Improvement / Tenant Finish Permit
VerifiedRequired for interior tenant-finish and tenant-improvement work within an existing commercial, industrial, or multi-family building in Centerville. Centerville's Building Permit Application groups 'Large Tenant Finish' projects with 'New' Commercial Build for plan-submittal purposes (both require 2 sets of 24x36 plans), and both are billed under the same Fee Schedule § 4.010 valuation chart and § 4.040 Commercial/Industrial/Multi-Family plan review rate — the fee schedule does not publish a separate, lower tenant-improvement fee table.
Verified 2026-07-19 · Source
Requirements
- Interior tenant-finish or tenant-improvement work within an existing commercial, industrial, or multi-family building
- 'Large Tenant Finish' projects require (2) sets of 24x36 plans for review, per the official Building Permit Application (grouped with 'New' Commercial Build in this requirement)
- Estimated permit valuation must be provided at time of application, per CMC § 10.04.120
- Licensed Contractor Declaration required on the application
Required documents
- RequiredBuilding Permit ApplicationOfficial Centerville City Community Development Department form (655 North 1250 West); submitted by email to donna.wilkinson@centervilleutah.gov. The application's own permit-type list groups 'Large Tenant Finish' with 'New' Commercial Build for the 2-sets-of-24x36-plans requirement.
- RequiredConstruction Plans (2 sets, 24x36, for large tenant-finish scopes)Per the official Building Permit Application: 'New' Commercial Build and Large Tenant Finish projects require two sets of 24x36 plans for review. Smaller tenant-finish scopes may not require the full 24x36 set — confirm with the Building and Renovating Division.
- OptionalEnergy Code Compliance DocumentationCOMcheck or equivalent where the adopted commercial IECC applies to the scope of work (e.g., new HVAC, envelope changes).
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee (valuation-based, Total Building Valuation Chart) | Same tiered chart as new commercial construction — e.g., $28.30 for the first $500 of valuation, up to $6,730.50 for the first $1,000,000 plus $4.38 per additional $1,000. | Centerville City Fee Schedule § 4.010, 'Total Building Valuation Chart,' adopted by Res. 2017-18 on 8/15/2017; re-confirmed live 2026-07-19. Centerville's fee schedule does not publish a separate, lower valuation table for tenant-improvement/remodel work versus new construction — the same chart and the same total-project-valuation methodology governs both. |
| Commercial, Industrial, Multi-Family Building Plan Review | 65% of Building Permit Fee (plus actual billing cost for any peer review) | Centerville City Fee Schedule § 4.040: 'Commercial, Industrial, Multi-Family Building Plan Review (excluding single-family dwellings, private garages, carports, sheds, and agricultural buildings) — 65% of Building Permit Fee.' This is the same line item and rate that applies to new commercial construction — the fee schedule does not carve out a discounted plan-review percentage for tenant-improvement projects. |
| Identical (Cardfile) Plan Check — Commercial, Industrial and Multi-Family | $140.00 | Centerville City Fee Schedule § 4.040: 'Indentical (Cardfile) Plan Check ... Commercial, Industrial and Multi-Family - $140.' Available where the tenant-finish layout matches a previously-reviewed identical plan on file. |
| Permit Fee for Work Commenced Without a Permit | Applicable Permit Fee + 50% | Centerville City Fee Schedule § 4.010. |
Sign Permit
VerifiedSigns in Centerville are regulated by a dedicated chapter of the Centerville Zoning Code (CZC § 12.54, Sign Regulations), most recently amended by Ordinance No. 2024-16 (adopted October 15, 2024, effective within 30 days), which rewrote § 12.54.120 (Signs in the Parrish Lane Gateway Commercial District) and § 12.54.130 (Signs in Commercial Zones) to allow increased free-standing sign heights. Re-chased 2026-07-20: the fee schedule is hosted on a JavaScript-rendered municipal code platform (centerville.municipalcodeonline.com/book?type=fees) that a plain HTTP fetch cannot render, but the platform's print-preview endpoint (centerville.municipalcodeonline.com/book/print?type=fees) served the entire consolidated Fee Schedule as static HTML. Chapter 20.120 (Signs) of that Fee Schedule states: standard Sign Permits are charged 'Based on Building Valuation, Per CFS 4 (Building Permit Fees)' (i.e. the same valuation-based building-permit fee table applies, due upon application), while a Temporary Sign Permit is a flat $30 due upon application; Street Signs are billed per CFS 17 (Street and Excavation Permit Fees). Adopted by Resolution 2017-18 on 8/15/2017, per the fee schedule's own history note (no later amendment to the Signs section was found).
Verified 2026-07-20 · Source
Requirements
- Signs in Centerville must comply with CZC § 12.54, including the district-specific standards in § 12.54.120 (Parrish Lane Gateway Commercial District) and § 12.54.130 (Commercial Zones)
- Parrish Lane Gateway Commercial District free-standing signs: total allowable sign area is 150 sq ft plus 10 sq ft per tenant (existing or approved), capped at 250 sq ft total; maximum height 30 feet unless otherwise provided
- Free-standing signs must be located a sufficient distance from a street or intersection to provide clear vision for traffic; no portion may be closer than 5 feet from an adjacent property line or right-of-way
- Each free-standing sign must be located in an area with a minimum of 1,000 sq ft of landscaping, with details reviewed and approved by the Planning Commission during site plan review
- A planned center may have one free-standing sign per street frontage, up to two per planned center, and the approving authority reviews compatibility with site/building design when approving the sign permit
- Free-standing freeway-oriented signs (near I-15/Frontage Road within 600 feet of the Parrish Lane centerline) are capped at 60 feet height / 200 sq ft (I-15 side) or 50 feet height / 165 sq ft with no changeable copy or digital elements (Frontage Road side)
Required documents
- RequiredSign Permit / Site Plan ApplicationReviewed as part of Centerville's zoning/site plan process; free-standing sign landscaping and design details are reviewed and approved by the Planning Commission during site plan review, per CZC § 12.54.120(b)(3)(A)(E).
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Sign Permit Fee (standard) | Based on Building Valuation — same fee table as CFS 4 (Building Permit Fees) | Centerville City Fee Schedule, chapter 20.120 (Signs): 'Sign Permit Based on Building Valuation, Per CFS 4 (Building Permit Fees), Upon Application.' Confirmed 2026-07-20 by fetching the fee schedule's print-preview endpoint (centerville.municipalcodeonline.com/book/print?type=fees), which serves the full consolidated fee schedule as static HTML unlike the JS-rendered book?type=fees viewer. Adopted by Resolution 2017-18 (8/15/2017). |
| Temporary Sign Permit Fee | $30.00 | Centerville City Fee Schedule, chapter 20.120 (Signs): 'Temporary Sign Permit $30, Upon Application.' Same source and confirmation method as above. |
| Street Signs | See CFS 17 (Street and Excavation Permit Fees) | Centerville City Fee Schedule, chapter 20.120 (Signs) cross-references CFS Chapter 17 for street-sign-specific fees rather than stating its own figure. |
EV Charger / EVSE Permit
VerifiedCenterville City's official Electrical Permit Application lists "EV Charging Station" as its own checkbox permit type, distinct from Power Service Upgrade, Power to Panel, and Temporary Power. It is billed at the city's standard flat Electrical Permit fee of $70.70 unless the installation also requires a service or panel upgrade, in which case the higher Power to Panel fee ($141.40) applies.
Verified 2026-07-20 · Source
Requirements
- Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property within Centerville City
- Work performed by a contractor licensed under the Construction Trades Licensing Act (58-55, UCA), or by the property owner under an Owner-Builder Declaration for private, non-commercial, non-public use
- If the charger requires added panel capacity or a new service, the Power Service Upgrade / Power to Panel box must also be checked and the corresponding fee paid
Required documents
- RequiredElectrical Permit ApplicationCenterville City's official form; check the "EV Charging Station" box under Permit Type. Submit to donna.wilkinson@centervilleutah.gov or in person at 655 North 1250 West, Centerville, UT 84014.
- RequiredLicensed Contractor Declaration or Owner-Builder DeclarationOne of the two declarations on the Electrical Permit Application must be completed, identifying either the licensed electrical contractor or the owner-builder performing the work.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| EV Charging Station (standard electrical permit fee) | $70.70 | Centerville City Electrical Permit Application: "EV CHARGING STATION" is a checked permit-type box on the same form as the standard $70.70 Electrical Permit Fee (Credit/Debit Card Payments Accepted, Check or Cash). |
| Power to Panel (if service/panel upgrade needed for the charger) | $141.40 | Centerville City Electrical Permit Application: "POWER TO PANEL ... Outside & Inside Panel (Fee $141.40)" — applies if the EV charger installation also requires a power-to-panel upgrade rather than a simple new circuit. |
Fire Sprinkler System Permit
VerifiedRequired for installation, modification, or removal from service of an automatic fire sprinkler (suppression) system in Centerville. Centerville's own City Fee Schedule (Chapter 4) has no fire-suppression line item because fire protection system plan review and permitting for Centerville is handled entirely by South Davis Metro Fire (SDMF), a special fire district confirmed by its own website to serve 'Bountiful, Centerville, North Salt Lake, West Bountiful, Woods Cross and the unincorporated areas of South Davis County' — a separate submittal, agency, and fee from the City's own Building Division / Sunrise Engineering building-permit process.
Verified 2026-07-21 · Source
Requirements
- Installation, modification, or removal from service of an automatic fire protection (suppression) system, fire pumps and related fuel tanks, jockey pumps, controllers, or a standpipe system
- Per International Fire Code Section 104.7.2, SDMF requires a 'technical opinion and report' (peer review) of plans for these systems
- Projects with 10 or more sprinkler devices are treated as a deferred submittal and reviewed by a qualified third-party peer reviewer rather than by SDMF directly, per SDMF's own Plan Reviews page
- Submit the plan review application and plans to fireplans@sdmetrofire.gov, separately from the Centerville City building permit submittal to donna.wilkinson@centervilleutah.gov
Required documents
- RequiredSDMF Plan Review ApplicationSouth Davis Metro Fire plan review application form, submitted with fire sprinkler system plans and calculations to fireplans@sdmetrofire.gov.
- RequiredFire Sprinkler System Plans and Hydraulic CalculationsPlans, specifications, device layout, and hydraulic calculations for the automatic sprinkler system.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Sprinkler Plan Review | $100 per hour, minimum 1 hour | SDMF Fee Ordinance (04/2024), 'PERMITS/PLAN REVIEWS/INSPECTIONS' section: 'Sprinkler - Plan Review ... $100 per hour, Minimum 1 hour.' Confirmed by direct PDF fetch 2026-07-21 (sdmetrofire.gov/_files/ugd/39b2d8_f44d3ef1ace841c7b612589d1a5b0a54.pdf) and independently corroborated by SDMF's Plan Reviews page (sdmetrofire.gov/copy-of-plan-reviews-1, fetched live 2026-07-21), which states an additional $100 plan review fee applies for suppression systems with fewer than 10 devices. |
| Fire Sprinkler System Permit | $300 | SDMF Fee Ordinance (04/2024), same section: 'Fire sprinkler system permit (3 Inspections) ... $300.' This flat $300 permit fee (covering 3 inspections per the ordinance) is separate from, and in addition to, the hourly Sprinkler Plan Review fee above. SDMF's Plan Reviews page independently confirms the $300 figure under 'SUPPRESSION REVIEWS - $300 (includes review and 2 inspections)' -- the formal, dated Fee Ordinance's '3 Inspections' is treated as authoritative over the website's '2 inspections' wording. |
| Deferred Submittal (10+ devices) | No additional SDMF plan review fee (third-party reviewer paid separately by applicant) | South Davis Metro Fire, Plan Reviews page (sdmetrofire.gov/copy-of-plan-reviews-1, fetched live 2026-07-21): projects with 10 or more devices are reviewed by a qualified third-party reviewer and do not require SDMF's own plan review fee. The $300 permit fee itself is not stated as waived. |
Fire Alarm System Permit
VerifiedRequired for installation or modification of a fire alarm and detection system in Centerville. As with fire sprinkler permits, fire alarm plan review and permitting for Centerville is handled by South Davis Metro Fire (SDMF) -- a special fire district confirmed by its own website to serve 'Bountiful, Centerville, North Salt Lake, West Bountiful, Woods Cross and the unincorporated areas of South Davis County' -- separately from the City's own Building Division / Sunrise Engineering building-permit process.
Verified 2026-07-21 · Source
Requirements
- Installation or modification of a fire alarm and detection system and related equipment
- Per International Fire Code Section 104.7.2, SDMF requires a 'technical opinion and report' (peer review) of plans for fire alarm systems
- Deferred submittals reviewed by a third-party peer reviewer are still billed at the same fee, per SDMF's own Plan Reviews page
- Submit the plan review application and plans to fireplans@sdmetrofire.gov, separately from the Centerville City building permit submittal to donna.wilkinson@centervilleutah.gov
Required documents
- RequiredSDMF Plan Review ApplicationSouth Davis Metro Fire plan review application form, submitted with fire alarm system plans to fireplans@sdmetrofire.gov.
- RequiredFire Alarm System PlansPlans, specifications, and device layout for the fire alarm and detection system.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Fire Alarm System Permit (plan review + 2 inspections) | $200 | SDMF Fee Ordinance (04/2024), 'PERMITS/PLAN REVIEWS/INSPECTIONS' section: 'Fire alarm system permit (2 Inspections) ... $200.' Confirmed by direct PDF fetch 2026-07-21 (sdmetrofire.gov/_files/ugd/39b2d8_f44d3ef1ace841c7b612589d1a5b0a54.pdf). SDMF's Plan Reviews page (sdmetrofire.gov/copy-of-plan-reviews-1, fetched live 2026-07-21) independently corroborates: 'ALARM REVIEWS - $200 (includes review and 2 inspections)' and states the same $200 fee applies to deferred (third-party-reviewed) submittals. |
Change of Occupancy Classification
VerifiedCenterville Municipal Code § 10.06.010 (Certificate Required) directly addresses change of use: 'No building or structure shall be used or occupied, in whole or in part, for any purpose, and no change in the existing occupancy classification of a building or structure or portion thereof shall be made, until the City has issued a Final Inspection Certificate, Certificate of Occupancy, or Temporary Certificate of Occupancy.' Centerville does not publish a standalone 'change of use permit' application or fee, however -- confirmed 2026-07-21 by direct fetch of the full Municipal Code (Chapter 10.06) and the full Fee Schedule (no 'change of use,' 'change of occupancy,' or standalone Certificate of Occupancy fee line item exists; only the Temporary Certificate of Occupancy fee, $50, and its $25 extension are itemized under Fee Schedule § 4.010). A genuine change in occupancy classification is instead processed through Centerville's existing Building Permit Application (most often under the 'Commercial Tenant Finish' checkbox, since the City's own Building Permit Application PDF has no separate 'change of use' box) if any construction/plan review is involved, billed at the same valuation-based Building Permit Fee and 65% Commercial Plan Review rate as any other commercial permit (Fee Schedule §§ 4.010/4.040); or, where no construction is involved, through the City's Business License process (Chapter 5.010), which its own Business Licenses and Permits page confirms handles business 'location changes' and coordinates review with Zoning, Building, and safety requirements at the same flat Business License fee structure as a new business.
Verified 2026-07-21 · Source
Requirements
- Per CMC § 10.06.010, no change in the existing occupancy classification of a building or structure (or portion thereof) may be made until the City issues a Final Inspection Certificate, Certificate of Occupancy, or Temporary Certificate of Occupancy
- If the classification change involves construction or tenant-finish work, file the standard Building Permit Application (Commercial Tenant Finish checkbox) with the Community Development Department
- If the classification change is purely a new business/tenant occupying an existing space with no construction, file through the City's Business License process (Govwell portal), which coordinates review with Zoning, Building, and safety requirements
- Estimated permit valuation must be provided at time of application where a building permit is required, per CMC § 10.04.120
Required documents
- OptionalBuilding Permit Application (Commercial Tenant Finish)Official Centerville City Community Development Department form; used when the occupancy-classification change involves construction or tenant-finish work. Submitted by email to donna.wilkinson@centervilleutah.gov.
- OptionalBusiness License Application (Govwell portal)Official Centerville City business license application, which the City's Business Licenses and Permits page confirms also covers business 'location changes'; coordinated with Zoning, Building, and safety-requirement reviews prior to issuance. Used when no construction accompanies the change of use.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee (valuation-based) -- if construction/tenant-finish work accompanies the classification change | Same Total Building Valuation Chart as new commercial construction (Fee Schedule § 4.010), plus 65% Commercial Plan Review (Fee Schedule § 4.040) | Centerville City Fee Schedule §§ 4.010/4.040, re-confirmed via direct fetch of the full fee schedule 2026-07-21. No separate, lower fee table exists for a change-of-occupancy scope -- it is billed identically to new commercial construction/tenant improvement. |
| Business License Fee (base + enhanced service fee) -- if no construction accompanies the classification change | $40 base fee (all businesses except home occupations) plus a tiered Enhanced Service Fee by square footage ($50-$260) plus $4 per employee | Centerville City Fee Schedule, Chapter 5.010 (Business License), confirmed via direct fetch 2026-07-21. The same base fee/tier structure applies to new businesses, renewals, and location/use changes -- no distinct 'change of use' or 'change of occupancy' line item is itemized. |
Sources & verification
Verified against official sources. Last reviewed 2026-07-07.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Centerville building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.