Centerville building permits

Verified

Centerville, Utah — as published 2026-07-16.

Verified 2026-07-07 · Source

Codes adopted

2024 International Building Code (IBC), including Appendices C and J — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(a); supersedes the 2021 edition CMC § 10.03.020 still codifies as of live re-check 2026-07-16 (adopted by Ord. 2017-03 4/4/2017, amended by Ord. 2019-18 8/6/2019, most recently amended by Ord. 2025-04 4/1/2025 — none of which updated the edition year to 2024). Centerville's own municipal code has not yet been amended to reflect the 7/1/2026 transition.2021 International Residential Code (IRC), including Appendices AE and AQ, plus the residential provisions of Chapter 11 (Energy Efficiency) of the 2015 IRC edition (subject to Utah Code § 15A-2-104) — REMAINS CURRENT, Utah Code § 15A-2-103(1)(b)/(c) did not change the base IRC edition in the 7/1/2026 amendment; CMC § 10.03.030 (last amended by Ord. 2025-04, 4/1/2025) is correct on this point.2024 International Plumbing Code (IPC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(d); supersedes the 2021 edition CMC § 10.03.040 still codifies as of live re-check 2026-07-16 (last amended by Ord. 2025-04, 4/1/2025).2024 International Mechanical Code (IMC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(e); supersedes the 2021 edition CMC § 10.03.050 still codifies as of live re-check 2026-07-16 (last amended by Ord. 2025-04, 4/1/2025).2024 International Fuel Gas Code (IFGC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(f); supersedes the 2021 edition CMC § 10.03.060 still codifies as of live re-check 2026-07-16 (last amended by Ord. 2025-04, 4/1/2025).2023 National Electrical Code (NEC) — REMAINS CURRENT, Utah Code § 15A-2-103(1)(g) did not change this edition in the 7/1/2026 amendment. CMC § 10.03.070 (adopted by Ord. 2017-03, amended by Ord. 2018-16 6/19/2018, amended by Ord. 2025-04, and MOST RECENTLY amended by Ord. 2026-03 on 3/3/2026 — Centerville's most recently touched construction-code chapter) is correct and confirms the 2023 edition, consistent with statute.2024 International Energy Conservation Code (IECC), single unsplit statewide edition — CURRENT as of 7/1/2026 per Utah Code § 15A-2-103(1)(h); supersedes the 2021 edition CMC § 10.03.080 still codifies as of live re-check 2026-07-16 (last amended by Ord. 2025-04, 4/1/2025).2024 International Existing Building Code (IEBC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(i); supersedes the 2021 edition CMC § 10.03.085 still codifies as of live re-check 2026-07-16 (last amended by Ord. 2025-04, 4/1/2025).Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(n); supersedes the 2021 edition CMC § 10.03.122 (Swimming Pools And Spa Code, adopted by Ord. 2025-04, 4/1/2025) still codifies — confirmed by live browser re-check 2026-07-16 (the JavaScript-rendered code viewer that previously blocked static text extraction was successfully read this session): 'The residential provisions of the Swimming Pool and Spa Code, 2021 Edition ... are hereby adopted.'Manufactured Housing standards per Utah Code § 15A-2-104, plus the HUD Code, Appendix AE of the 2021 IRC, and the 2005 NFPA 225 Model Manufactured Home Installation Standard — adopted by Ord. 2017-03, amended by Ord. 2025-04, per CMC § 10.03.090. Not affected by the § 15A-2-103 7/1/2026 amendment (governed by § 15A-2-104 instead).Uniform Code for the Abatement of Dangerous Buildings, 1997 Edition — adopted by Ord. 2017-03, amended by Ord. 2025-04, per CMC § 10.03.100. Not a § 15A-2-103 code; unaffected by the 7/1/2026 amendment.International Property Maintenance Code, 2006 Edition — adopted by Ord. 2017-03, amended by Ord. 2025-04, per CMC § 10.03.110. Not a § 15A-2-103 code; unaffected by the 7/1/2026 amendment.International Fire Code (IFC), 2021 Edition, excluding appendices, plus NFPA 1 Ch. 28 (2018), NFPA 54 (2024), and NFPA 58 (2024) — per CMC § 10.03.120, adopted by Ord. 2017-03, amended by Ord. 2018-07 (2/6/2018), amended by Ord. 2019-18 (8/6/2019), amended by Ord. 2025-04 (4/1/2025). CORRECTION (2026-07-16): this file's prior entry described the IFC edition as '2015 Edition per the 2017 code compilation text' and reported the full CMC § 10.03.120 text as unextractable due to JavaScript rendering — both are superseded by a successful live browser re-read of centerville.municipalcodeonline.com on 2026-07-16, which returned full section text confirming the 2021 IFC (not 2015) is currently codified. The IFC is NOT among the codes adopted by Utah Code § 15A-2-103 (Title 15A Chapter 2, State Construction Code) — Utah's Fire Code is separately adopted under Title 15A Chapter 5, State Fire Code Act — so no statutory edition change via § 15A-2-103 applies to this entry regardless.International Wildland-Urban Interface (WUI) Code — CMC § 10.03.125, confirmed via live browser re-read 2026-07-16 (previously unextractable): the 2006-edition Utah WUI Code (adopted by Ord. 2017-03, per Utah Code Title 65A Ch. 8) governs UNTIL January 1, 2027, at which point the 2024-edition International WUI Code (adopted by Ord. 2026-03 on 3/3/2026, amended by Ord. 2026-09 on 4/21/2026) takes over per a dual-dated code section. This is a Title 15A Ch. 2 local-amendment-adoptable code under § 15A-2-103(2), distinct from the seven codes listed in § 15A-2-103(1) that are the focus of this file's 7/1/2026 update.NOTE (2026-07-16 re-verification): The Utah Code § 15A-2-103 version effective 7/1/2026 (superseded 1/1/2027) took effect 15 days before this re-verification. IBC/IPC/IMC/IFGC/IECC/IEBC/residential ISPSC are now 2024 statewide; IRC (2021) and NEC (2023) did NOT change. Centerville Municipal Code Title 10.03 was live re-read in full via browser (centerville.municipalcodeonline.com, JavaScript-rendered — the WebFetch tool that previously reported this content as unextractable returns only template chrome; the Browser pane renders full section text) on 2026-07-16 and IS STILL LAGGING on every code family Utah Code § 15A-2-103(1) bumped to 2024: IBC/IPC/IMC/IFGC/IECC/IEBC/ISPSC(residential) all remain codified at their pre-7/1/2026 (2021) editions, most recently touched by Ord. 2025-04 (4/1/2025), which predates the statute's effective date. The NEC section (§ 10.03.070, amended by Ord. 2026-03 on 3/3/2026 — Centerville's most recent construction-code ordinance) is CORRECT at 2023, and the IRC section is correctly unchanged at 2021. The Utah Code § 15A-2-103 citation has been added to the sources array below, pointing to the current in-force version link.

Permit types & fees

Residential Building Permit (New Home / Addition / Remodel)

Verified

Required for new single-family/multi-family residential construction, additions, remodels, swimming pools, detached structures, and decks in Centerville, per the city's official Building Permit Application. The Permit Fee is valuation-based per Centerville City's own Total Building Valuation Chart (Fee Schedule § 4.010), not pegged to an outside ICC table.

Verified 2026-07-07 · Source

Requirements

  • New single-family dwelling, multi-family/town home construction, addition, remodel, swimming pool, detached structure, or deck (per the official Building Permit Application permit-type checkboxes)
  • Estimated permit valuation (dollar amount for the project, including market value of labor and materials) must be provided at time of application, per CMC § 10.04.120
  • Licensed Contractor Declaration or Owner-Builder Declaration (with Owner-Builder Certification Form) required on the application
  • $1,000 refundable Construction Bond due prior to issuance, per Fee Schedule § 4.010

Required documents

  • RequiredBuilding Permit ApplicationOfficial Centerville City Community Development Department form (655 North 1250 West); submitted, with site plan and plans, by email to donna.wilkinson@centervilleutah.gov. 'New' Commercial Build and Large Tenant Finish projects require (2) sets of 24x36 plans for review.

Fee schedule

Fee typeAmountNotes
Building Permit Fee (valuation-based)$1 to $500: $28.30. $501 to $2,000: $28.30 for the first $500 plus $23.66 per additional $1,000 or fraction, to $2,000. $2,001 to $25,000: $83.10 for the first $2,000 plus $16.80 per additional $1,000 or fraction, to $25,000. $25,001 to $50,000: $470.10 for the first $25,000 plus $12.12 per additional $1,000 or fraction, to $50,000. $50,001 to $100,000: $772.50 for the first $50,000 plus $8.40 per additional $1,000 or fraction, to $100,000. $100,001 to $500,000: $1,192.50 for the first $100,000 plus $6.72 per additional $1,000 or fraction, to $500,000. $500,001 to $1,000,000: $3,880.50 for the first $500,000 plus $5.70 per additional $1,000 or fraction, to $1,000,000. $1,000,001 and up: $6,730.50 for the first $1,000,000 plus $4.38 per additional $1,000 or fraction.Centerville City Fee Schedule § 4.010 (Building Permits), 'Total Building Valuation Chart', adopted by Res. 2017-18 on 8/15/2017 — this remains the currently codified table per the live municipal code fee book as of 2026-07-07 (no later amending resolution is listed against Chapter 4 in the code's own history log).
Residential Building Plan Review Fee25% of Building Permit FeeCenterville City Fee Schedule § 4.040 (Plan Reviews), 'Residential Building Plan Review (including single-family dwellings, private garages, carports, and sheds)', adopted by Res. 2017-18. Due prior to issuance.
Construction Bond (refundable)$1,000.00Centerville City Fee Schedule § 4.010, 'Construction Bond ... refundable upon final approval.' Due prior to issuance.
Permit Fee for Work Commenced Without a PermitApplicable Permit Fee + 50%Centerville City Fee Schedule § 4.010.
Temporary Certificate of Occupancy$50.00Centerville City Fee Schedule § 4.010, subject to CMC § 10.06.050.
Extension of Temporary Certificate of Occupancy$25.00Centerville City Fee Schedule § 4.010, subject to CMC § 10.06.050.
Identical (Cardfile) Plan Check — Single-Family Residential$70.00Centerville City Fee Schedule § 4.040, 'Indentical (Cardfile) Plan Check ... Single-Family Residential - $70.' Due prior to issuance.

Roofing Permit

Verified

Required for new felt/roofing material, decking replacement, or structural changes to a roof in Centerville, per the city's official Roofing Permit Application. Structural changes require submission of structural calculations and a plan review with additional fees.

Verified 2026-07-07 · Source

Requirements

  • New felt, decking replacement, or structural changes to roofing
  • Structural changes require submission of structural calculations and are subject to a Plan Review with additional fees added to the permit cost
  • Licensed Contractor Declaration or Owner-Builder Declaration (with Certification Form)

Required documents

  • RequiredRoofing Permit ApplicationOfficial Centerville City form; email completed application to donna.wilkinson@centervilleutah.gov.

Fee schedule

Fee typeAmountNotes
Roofing Permit Fee$141.40Centerville City official Roofing Permit Application (PDF): 'PERMIT FEE ... $141.40 (Credit/Debit Card Payments Accepted).' This figure is more current/precise than the flat $70 'Building Permit' minor-trade figure shown in the codified Fee Schedule table (Res. 2017-18); the standalone application PDF is the operative fee document for this specific permit type as of 2026-07-07.

Plumbing Permit

Verified

Required for water heater installation/replacement, tankless water heaters, or new plumbing work in Centerville, per the city's official Plumbing Permit Application.

Verified 2026-07-07 · Source

Requirements

  • Water heater (new or replacement)
  • Tankless water heater — requires a schematic; no over-the-counter issuance, must be reviewed
  • New plumbing work (described on the application)
  • Licensed Contractor Declaration or Owner-Builder Declaration

Required documents

  • RequiredPlumbing Permit ApplicationOfficial Centerville City form; email completed application to donna.wilkinson@centervilleutah.gov.

Fee schedule

Fee typeAmountNotes
Plumbing Permit Fee$70.70Centerville City official Plumbing Permit Application (PDF): 'PERMIT FEE ... $70.70 (Credit/Debit Card Payments Accepted, Check or Cash).' This precise figure supersedes the flat $70 'Plumbing Permit' figure in the codified Fee Schedule table (Res. 2017-18) as the operative current fee.

Mechanical Permit

Verified

Required for furnace/air conditioner installation or replacement, or gas line new/upgrade/removal work in Centerville, per the city's official Mechanical Permit Application.

Verified 2026-07-07 · Source

Requirements

  • Furnace (new or replacement)
  • Air conditioner (new or replacement)
  • Gas line (new or upgrade)
  • Gas line (removal)
  • Licensed Contractor Declaration or Owner-Builder Declaration

Required documents

  • RequiredMechanical Permit ApplicationOfficial Centerville City form; email completed application to donna.wilkinson@centervilleutah.gov.

Fee schedule

Fee typeAmountNotes
Mechanical Permit Fee$70.70Centerville City official Mechanical Permit Application (PDF): 'PERMIT FEE ... $70.70 (Credit/Debit Card Payments Accepted, Check or Cash).'

Electrical Permit

Verified

Required for power service upgrades, power to panel work, temporary power pedestals, EV charging stations, or meter-mounted transfer switches (solar/generator) in Centerville, per the city's official Electrical Permit Application. 'EV Charging Station' is its own explicit checkbox on the application (confirmed by direct PDF review 2026-07-19), but Centerville does not bill it as a distinct fee — it is billed at the same standard $70.70 permit fee as the other checkbox categories, unless the installation also requires Power to Panel work ($141.40) or a service upgrade.

Verified 2026-07-07 · Source

Requirements

  • Power service upgrade (amperage and work order number specified)
  • Power to panel — outside service box, inside panel, or both (higher fee for both)
  • Temporary power pedestal
  • EV charging station
  • Meter-mounted transfer switch (solar or generator) — must be inspected prior to meter set
  • Licensed Contractor Declaration or Owner-Builder Declaration

Required documents

  • RequiredElectrical Permit ApplicationOfficial Centerville City form; email completed application to donna.wilkinson@centervilleutah.gov.

Fee schedule

Fee typeAmountNotes
Electrical Permit Fee (standard)$70.70Centerville City official Electrical Permit Application (PDF): 'PERMIT FEE ... $70.70 (Credit/Debit Card Payments Accepted, Check or Cash).'
Power to Panel — Outside & Inside Panel$141.40Centerville City official Electrical Permit Application (PDF): 'POWER TO PANEL ... Outside & Inside Panel (Fee $141.40).'

Solar Panel (PV) Permit

Verified

Required for solar panel installations, battery backup for solar systems, and meter-mounted transfer switches for solar systems in Centerville, per the city's official Solar Permit Application and Solar Array Permit Requirements document. This is the only Centerville permit type with a city-published numeric review-timeline commitment.

Verified 2026-07-07 · Source

Requirements

  • Structural engineer's letter confirming existing trusses support solar panel loads, indicating wind loads of 140 MPH
  • Complete set of construction drawings and one-line electrical diagram(s)
  • Roof layout and panel locations meeting clearance-to-peak/hips/valleys/pathways requirements per the adopted International Fire Code (IFC)
  • Complete manufacturer specifications for micro-inverters, modules/panels, disconnect switches, any new AC panelboards, and the supporting racking system
  • Any detached structure on the property receiving panels must be shown
  • Plans must be submitted to South Davis Metro Fire Agency (sdmetrofire.gov, Plan Review) for a separate fire plan review, with a $100 fee for the first hour of review, paid before review begins
  • After fire approval, email the Centerville City Solar Permit Application plus the fire-approved (stamped and dated) plans/specifications to donna.wilkinson@centervilleutah.gov

Required documents

  • RequiredSolar Permit ApplicationOfficial Centerville City form covering solar panels, battery backup, and meter-mounted transfer switch permit types.
  • RequiredSolar Array Permit Requirements documentOfficial Centerville City Building & Safety Department document detailing structural, fire-review, and submittal requirements for solar installations.

Fee schedule

Fee typeAmountNotes
Solar Panels Permit Fee$379.76Centerville City official Solar Permit Application (PDF): 'SOLAR PANELS (FEE $379.76).'
Battery Backup for Solar System$70.70Centerville City official Solar Permit Application (PDF): 'BATTERY BACKUP FOR SOLAR SYSTEM (FEE $70.70).'
Meter-Mounted Transfer Switch for Solar System$70.70Centerville City official Solar Permit Application (PDF): 'METER-MOUNTED TRANSFER SWITCH FOR SOLAR SYSTEM (FEE $70.70).'
South Davis Metro Fire Agency Plan Review Fee$100 for the first hour of reviewCenterville City official Solar Array Permit Requirements document: fire plan review is required prior to City submittal, with payment due before review begins; contact sdmetrofire.gov or 801-677-2400.

Grading Permit

Verified

Required for grading activities within Centerville, with fees based on total cubic yards of material moved, per the city's official Fee Schedule § 4.020.

Verified 2026-07-07 · Source

Requirements

  • Grading activity within city limits
  • Fee based on total cubic yards graded (see fee tiers)

Required documents

  • RequiredGrading Permit ApplicationApplication per Centerville Municipal Code Title 10 grading-permit provisions; combined Grading Permit Fee and Grading Plan Review Fee due prior to issuance.

Fee schedule

Fee typeAmountNotes
Grading Permit Fee (by cubic yards)Less than 100 cubic yards: $70. 101-1,000 cubic yards: $99 for the first 100 cubic yards, plus $17.50 per additional 100 cubic yards or fraction. 1,001-10,000 cubic yards: $256.50 for the first 1,000 cubic yards, plus $14.50 per additional 1,000 cubic yards or fraction. 10,001-100,000 cubic yards: $387 for the first 10,000 cubic yards, plus $66 per additional 10,000 cubic yards or fraction. 100,001+ cubic yards: $981 for the first 100,000 cubic yards, plus $36.50 per additional 10,000 cubic yards or fraction.Centerville City Fee Schedule § 4.020 (Grading Permits), 'Grading Permit Fee Chart,' adopted by Res. 2017-18 on 8/15/2017.
Permit Fee for Work Commenced Without a PermitApplicable Permit Fee + 50%Centerville City Fee Schedule § 4.020.

Commercial Building Permit

Verified

Required for new commercial, industrial, or multi-family building construction in Centerville, governed by the 2024 IBC (Utah Code § 15A-2-103(1)(a), effective 7/1/2026; Centerville's own Municipal Code Title 10.03 is confirmed still codified at the 2021 IBC as of live re-check 2026-07-16 — see codesAdopted note). The base Building Permit Fee is calculated from the same Total Building Valuation Chart (Fee Schedule § 4.010) used for residential permits, but Commercial/Industrial/Multi-Family projects are billed a separate, higher Plan Review rate under Fee Schedule § 4.040.

Verified 2026-07-19 · Source

Requirements

  • New commercial, industrial, or multi-family building construction (per the official Building Permit Application permit-type checkboxes)
  • Estimated permit valuation must be provided at time of application, per CMC § 10.04.120
  • 'New' Commercial Build projects require (2) sets of 24x36 plans for review, per the official Building Permit Application
  • Licensed Contractor Declaration required on the application
  • $1,000 refundable Construction Bond due prior to issuance, per Fee Schedule § 4.010

Required documents

  • RequiredBuilding Permit ApplicationOfficial Centerville City Community Development Department form (655 North 1250 West); submitted, with site plan and (2) sets of 24x36 plans, by email to donna.wilkinson@centervilleutah.gov.
  • RequiredConstruction Plans (2 sets, 24x36)Per the official Building Permit Application: 'New' Commercial Build projects require two sets of 24x36 plans for review.
  • OptionalEnergy Code Compliance DocumentationCOMcheck or equivalent demonstrating compliance with the adopted commercial IECC (2024 statewide, per Utah Code § 15A-2-103(1)(h)).

Fee schedule

Fee typeAmountNotes
Building Permit Fee (valuation-based, Total Building Valuation Chart)$1 to $500: $28.30. $501 to $2,000: $28.30 for the first $500 plus $23.66 per additional $1,000 or fraction, to $2,000. $2,001 to $25,000: $83.10 for the first $2,000 plus $16.80 per additional $1,000 or fraction, to $25,000. $25,001 to $50,000: $470.10 for the first $25,000 plus $12.12 per additional $1,000 or fraction, to $50,000. $50,001 to $100,000: $772.50 for the first $50,000 plus $8.40 per additional $1,000 or fraction, to $100,000. $100,001 to $500,000: $1,192.50 for the first $100,000 plus $6.72 per additional $1,000 or fraction, to $500,000. $500,001 to $1,000,000: $3,880.50 for the first $500,000 plus $5.70 per additional $1,000 or fraction, to $1,000,000. $1,000,001 and up: $6,730.50 for the first $1,000,000 plus $4.38 per additional $1,000 or fraction.Centerville City Fee Schedule § 4.010 (Building Permits), 'Total Building Valuation Chart,' adopted by Res. 2017-18 on 8/15/2017; re-confirmed live via browser render of centerville.municipalcodeonline.com/book?type=fees 2026-07-19. This is the same table used for residential permits — Centerville does not maintain a separate commercial valuation chart.
Commercial, Industrial, Multi-Family Building Plan Review65% of Building Permit Fee (plus actual billing cost for any peer review)Centerville City Fee Schedule § 4.040 (Plan Reviews): 'Commercial, Industrial, Multi-Family Building Plan Review (excluding single-family dwellings, private garages, carports, sheds, and agricultural buildings) — 65% of Building Permit Fee (Peer review to be added fee of actual billing to City). Prior to Issuance.' Confirmed live 2026-07-19 — more than double the 25% residential plan-review rate.
Identical (Cardfile) Plan Check — Commercial, Industrial and Multi-Family$140.00Centerville City Fee Schedule § 4.040: 'Indentical (Cardfile) Plan Check ... Commercial, Industrial and Multi-Family - $140.' (Twice the $70 single-family-residential cardfile rate.) Due prior to issuance.
Construction Bond (refundable)$1,000.00Centerville City Fee Schedule § 4.010, 'Construction Bond ... refundable upon final approval.' Due prior to issuance; same flat figure applies to residential and commercial permits — the fee schedule does not publish a separate, larger commercial bond amount.
Permit Fee for Work Commenced Without a PermitApplicable Permit Fee + 50%Centerville City Fee Schedule § 4.010.

Commercial Tenant Improvement / Tenant Finish Permit

Verified

Required for interior tenant-finish and tenant-improvement work within an existing commercial, industrial, or multi-family building in Centerville. Centerville's Building Permit Application groups 'Large Tenant Finish' projects with 'New' Commercial Build for plan-submittal purposes (both require 2 sets of 24x36 plans), and both are billed under the same Fee Schedule § 4.010 valuation chart and § 4.040 Commercial/Industrial/Multi-Family plan review rate — the fee schedule does not publish a separate, lower tenant-improvement fee table.

Verified 2026-07-19 · Source

Requirements

  • Interior tenant-finish or tenant-improvement work within an existing commercial, industrial, or multi-family building
  • 'Large Tenant Finish' projects require (2) sets of 24x36 plans for review, per the official Building Permit Application (grouped with 'New' Commercial Build in this requirement)
  • Estimated permit valuation must be provided at time of application, per CMC § 10.04.120
  • Licensed Contractor Declaration required on the application

Required documents

  • RequiredBuilding Permit ApplicationOfficial Centerville City Community Development Department form (655 North 1250 West); submitted by email to donna.wilkinson@centervilleutah.gov. The application's own permit-type list groups 'Large Tenant Finish' with 'New' Commercial Build for the 2-sets-of-24x36-plans requirement.
  • RequiredConstruction Plans (2 sets, 24x36, for large tenant-finish scopes)Per the official Building Permit Application: 'New' Commercial Build and Large Tenant Finish projects require two sets of 24x36 plans for review. Smaller tenant-finish scopes may not require the full 24x36 set — confirm with the Building and Renovating Division.
  • OptionalEnergy Code Compliance DocumentationCOMcheck or equivalent where the adopted commercial IECC applies to the scope of work (e.g., new HVAC, envelope changes).

Fee schedule

Fee typeAmountNotes
Building Permit Fee (valuation-based, Total Building Valuation Chart)Same tiered chart as new commercial construction — e.g., $28.30 for the first $500 of valuation, up to $6,730.50 for the first $1,000,000 plus $4.38 per additional $1,000.Centerville City Fee Schedule § 4.010, 'Total Building Valuation Chart,' adopted by Res. 2017-18 on 8/15/2017; re-confirmed live 2026-07-19. Centerville's fee schedule does not publish a separate, lower valuation table for tenant-improvement/remodel work versus new construction — the same chart and the same total-project-valuation methodology governs both.
Commercial, Industrial, Multi-Family Building Plan Review65% of Building Permit Fee (plus actual billing cost for any peer review)Centerville City Fee Schedule § 4.040: 'Commercial, Industrial, Multi-Family Building Plan Review (excluding single-family dwellings, private garages, carports, sheds, and agricultural buildings) — 65% of Building Permit Fee.' This is the same line item and rate that applies to new commercial construction — the fee schedule does not carve out a discounted plan-review percentage for tenant-improvement projects.
Identical (Cardfile) Plan Check — Commercial, Industrial and Multi-Family$140.00Centerville City Fee Schedule § 4.040: 'Indentical (Cardfile) Plan Check ... Commercial, Industrial and Multi-Family - $140.' Available where the tenant-finish layout matches a previously-reviewed identical plan on file.
Permit Fee for Work Commenced Without a PermitApplicable Permit Fee + 50%Centerville City Fee Schedule § 4.010.

Sign Permit

Verified

Signs in Centerville are regulated by a dedicated chapter of the Centerville Zoning Code (CZC § 12.54, Sign Regulations), most recently amended by Ordinance No. 2024-16 (adopted October 15, 2024, effective within 30 days), which rewrote § 12.54.120 (Signs in the Parrish Lane Gateway Commercial District) and § 12.54.130 (Signs in Commercial Zones) to allow increased free-standing sign heights. Re-chased 2026-07-20: the fee schedule is hosted on a JavaScript-rendered municipal code platform (centerville.municipalcodeonline.com/book?type=fees) that a plain HTTP fetch cannot render, but the platform's print-preview endpoint (centerville.municipalcodeonline.com/book/print?type=fees) served the entire consolidated Fee Schedule as static HTML. Chapter 20.120 (Signs) of that Fee Schedule states: standard Sign Permits are charged 'Based on Building Valuation, Per CFS 4 (Building Permit Fees)' (i.e. the same valuation-based building-permit fee table applies, due upon application), while a Temporary Sign Permit is a flat $30 due upon application; Street Signs are billed per CFS 17 (Street and Excavation Permit Fees). Adopted by Resolution 2017-18 on 8/15/2017, per the fee schedule's own history note (no later amendment to the Signs section was found).

Verified 2026-07-20 · Source

Requirements

  • Signs in Centerville must comply with CZC § 12.54, including the district-specific standards in § 12.54.120 (Parrish Lane Gateway Commercial District) and § 12.54.130 (Commercial Zones)
  • Parrish Lane Gateway Commercial District free-standing signs: total allowable sign area is 150 sq ft plus 10 sq ft per tenant (existing or approved), capped at 250 sq ft total; maximum height 30 feet unless otherwise provided
  • Free-standing signs must be located a sufficient distance from a street or intersection to provide clear vision for traffic; no portion may be closer than 5 feet from an adjacent property line or right-of-way
  • Each free-standing sign must be located in an area with a minimum of 1,000 sq ft of landscaping, with details reviewed and approved by the Planning Commission during site plan review
  • A planned center may have one free-standing sign per street frontage, up to two per planned center, and the approving authority reviews compatibility with site/building design when approving the sign permit
  • Free-standing freeway-oriented signs (near I-15/Frontage Road within 600 feet of the Parrish Lane centerline) are capped at 60 feet height / 200 sq ft (I-15 side) or 50 feet height / 165 sq ft with no changeable copy or digital elements (Frontage Road side)

Required documents

  • RequiredSign Permit / Site Plan ApplicationReviewed as part of Centerville's zoning/site plan process; free-standing sign landscaping and design details are reviewed and approved by the Planning Commission during site plan review, per CZC § 12.54.120(b)(3)(A)(E).

Fee schedule

Fee typeAmountNotes
Sign Permit Fee (standard)Based on Building Valuation — same fee table as CFS 4 (Building Permit Fees)Centerville City Fee Schedule, chapter 20.120 (Signs): 'Sign Permit Based on Building Valuation, Per CFS 4 (Building Permit Fees), Upon Application.' Confirmed 2026-07-20 by fetching the fee schedule's print-preview endpoint (centerville.municipalcodeonline.com/book/print?type=fees), which serves the full consolidated fee schedule as static HTML unlike the JS-rendered book?type=fees viewer. Adopted by Resolution 2017-18 (8/15/2017).
Temporary Sign Permit Fee$30.00Centerville City Fee Schedule, chapter 20.120 (Signs): 'Temporary Sign Permit $30, Upon Application.' Same source and confirmation method as above.
Street SignsSee CFS 17 (Street and Excavation Permit Fees)Centerville City Fee Schedule, chapter 20.120 (Signs) cross-references CFS Chapter 17 for street-sign-specific fees rather than stating its own figure.

EV Charger / EVSE Permit

Verified

Centerville City's official Electrical Permit Application lists "EV Charging Station" as its own checkbox permit type, distinct from Power Service Upgrade, Power to Panel, and Temporary Power. It is billed at the city's standard flat Electrical Permit fee of $70.70 unless the installation also requires a service or panel upgrade, in which case the higher Power to Panel fee ($141.40) applies.

Verified 2026-07-20 · Source

Requirements

  • Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property within Centerville City
  • Work performed by a contractor licensed under the Construction Trades Licensing Act (58-55, UCA), or by the property owner under an Owner-Builder Declaration for private, non-commercial, non-public use
  • If the charger requires added panel capacity or a new service, the Power Service Upgrade / Power to Panel box must also be checked and the corresponding fee paid

Required documents

  • RequiredElectrical Permit ApplicationCenterville City's official form; check the "EV Charging Station" box under Permit Type. Submit to donna.wilkinson@centervilleutah.gov or in person at 655 North 1250 West, Centerville, UT 84014.
  • RequiredLicensed Contractor Declaration or Owner-Builder DeclarationOne of the two declarations on the Electrical Permit Application must be completed, identifying either the licensed electrical contractor or the owner-builder performing the work.

Fee schedule

Fee typeAmountNotes
EV Charging Station (standard electrical permit fee)$70.70Centerville City Electrical Permit Application: "EV CHARGING STATION" is a checked permit-type box on the same form as the standard $70.70 Electrical Permit Fee (Credit/Debit Card Payments Accepted, Check or Cash).
Power to Panel (if service/panel upgrade needed for the charger)$141.40Centerville City Electrical Permit Application: "POWER TO PANEL ... Outside & Inside Panel (Fee $141.40)" — applies if the EV charger installation also requires a power-to-panel upgrade rather than a simple new circuit.

Fire Sprinkler System Permit

Verified

Required for installation, modification, or removal from service of an automatic fire sprinkler (suppression) system in Centerville. Centerville's own City Fee Schedule (Chapter 4) has no fire-suppression line item because fire protection system plan review and permitting for Centerville is handled entirely by South Davis Metro Fire (SDMF), a special fire district confirmed by its own website to serve 'Bountiful, Centerville, North Salt Lake, West Bountiful, Woods Cross and the unincorporated areas of South Davis County' — a separate submittal, agency, and fee from the City's own Building Division / Sunrise Engineering building-permit process.

Verified 2026-07-21 · Source

Requirements

  • Installation, modification, or removal from service of an automatic fire protection (suppression) system, fire pumps and related fuel tanks, jockey pumps, controllers, or a standpipe system
  • Per International Fire Code Section 104.7.2, SDMF requires a 'technical opinion and report' (peer review) of plans for these systems
  • Projects with 10 or more sprinkler devices are treated as a deferred submittal and reviewed by a qualified third-party peer reviewer rather than by SDMF directly, per SDMF's own Plan Reviews page
  • Submit the plan review application and plans to fireplans@sdmetrofire.gov, separately from the Centerville City building permit submittal to donna.wilkinson@centervilleutah.gov

Required documents

  • RequiredSDMF Plan Review ApplicationSouth Davis Metro Fire plan review application form, submitted with fire sprinkler system plans and calculations to fireplans@sdmetrofire.gov.
  • RequiredFire Sprinkler System Plans and Hydraulic CalculationsPlans, specifications, device layout, and hydraulic calculations for the automatic sprinkler system.

Fee schedule

Fee typeAmountNotes
Sprinkler Plan Review$100 per hour, minimum 1 hourSDMF Fee Ordinance (04/2024), 'PERMITS/PLAN REVIEWS/INSPECTIONS' section: 'Sprinkler - Plan Review ... $100 per hour, Minimum 1 hour.' Confirmed by direct PDF fetch 2026-07-21 (sdmetrofire.gov/_files/ugd/39b2d8_f44d3ef1ace841c7b612589d1a5b0a54.pdf) and independently corroborated by SDMF's Plan Reviews page (sdmetrofire.gov/copy-of-plan-reviews-1, fetched live 2026-07-21), which states an additional $100 plan review fee applies for suppression systems with fewer than 10 devices.
Fire Sprinkler System Permit$300SDMF Fee Ordinance (04/2024), same section: 'Fire sprinkler system permit (3 Inspections) ... $300.' This flat $300 permit fee (covering 3 inspections per the ordinance) is separate from, and in addition to, the hourly Sprinkler Plan Review fee above. SDMF's Plan Reviews page independently confirms the $300 figure under 'SUPPRESSION REVIEWS - $300 (includes review and 2 inspections)' -- the formal, dated Fee Ordinance's '3 Inspections' is treated as authoritative over the website's '2 inspections' wording.
Deferred Submittal (10+ devices)No additional SDMF plan review fee (third-party reviewer paid separately by applicant)South Davis Metro Fire, Plan Reviews page (sdmetrofire.gov/copy-of-plan-reviews-1, fetched live 2026-07-21): projects with 10 or more devices are reviewed by a qualified third-party reviewer and do not require SDMF's own plan review fee. The $300 permit fee itself is not stated as waived.

Fire Alarm System Permit

Verified

Required for installation or modification of a fire alarm and detection system in Centerville. As with fire sprinkler permits, fire alarm plan review and permitting for Centerville is handled by South Davis Metro Fire (SDMF) -- a special fire district confirmed by its own website to serve 'Bountiful, Centerville, North Salt Lake, West Bountiful, Woods Cross and the unincorporated areas of South Davis County' -- separately from the City's own Building Division / Sunrise Engineering building-permit process.

Verified 2026-07-21 · Source

Requirements

  • Installation or modification of a fire alarm and detection system and related equipment
  • Per International Fire Code Section 104.7.2, SDMF requires a 'technical opinion and report' (peer review) of plans for fire alarm systems
  • Deferred submittals reviewed by a third-party peer reviewer are still billed at the same fee, per SDMF's own Plan Reviews page
  • Submit the plan review application and plans to fireplans@sdmetrofire.gov, separately from the Centerville City building permit submittal to donna.wilkinson@centervilleutah.gov

Required documents

  • RequiredSDMF Plan Review ApplicationSouth Davis Metro Fire plan review application form, submitted with fire alarm system plans to fireplans@sdmetrofire.gov.
  • RequiredFire Alarm System PlansPlans, specifications, and device layout for the fire alarm and detection system.

Fee schedule

Fee typeAmountNotes
Fire Alarm System Permit (plan review + 2 inspections)$200SDMF Fee Ordinance (04/2024), 'PERMITS/PLAN REVIEWS/INSPECTIONS' section: 'Fire alarm system permit (2 Inspections) ... $200.' Confirmed by direct PDF fetch 2026-07-21 (sdmetrofire.gov/_files/ugd/39b2d8_f44d3ef1ace841c7b612589d1a5b0a54.pdf). SDMF's Plan Reviews page (sdmetrofire.gov/copy-of-plan-reviews-1, fetched live 2026-07-21) independently corroborates: 'ALARM REVIEWS - $200 (includes review and 2 inspections)' and states the same $200 fee applies to deferred (third-party-reviewed) submittals.

Change of Occupancy Classification

Verified

Centerville Municipal Code § 10.06.010 (Certificate Required) directly addresses change of use: 'No building or structure shall be used or occupied, in whole or in part, for any purpose, and no change in the existing occupancy classification of a building or structure or portion thereof shall be made, until the City has issued a Final Inspection Certificate, Certificate of Occupancy, or Temporary Certificate of Occupancy.' Centerville does not publish a standalone 'change of use permit' application or fee, however -- confirmed 2026-07-21 by direct fetch of the full Municipal Code (Chapter 10.06) and the full Fee Schedule (no 'change of use,' 'change of occupancy,' or standalone Certificate of Occupancy fee line item exists; only the Temporary Certificate of Occupancy fee, $50, and its $25 extension are itemized under Fee Schedule § 4.010). A genuine change in occupancy classification is instead processed through Centerville's existing Building Permit Application (most often under the 'Commercial Tenant Finish' checkbox, since the City's own Building Permit Application PDF has no separate 'change of use' box) if any construction/plan review is involved, billed at the same valuation-based Building Permit Fee and 65% Commercial Plan Review rate as any other commercial permit (Fee Schedule §§ 4.010/4.040); or, where no construction is involved, through the City's Business License process (Chapter 5.010), which its own Business Licenses and Permits page confirms handles business 'location changes' and coordinates review with Zoning, Building, and safety requirements at the same flat Business License fee structure as a new business.

Verified 2026-07-21 · Source

Requirements

  • Per CMC § 10.06.010, no change in the existing occupancy classification of a building or structure (or portion thereof) may be made until the City issues a Final Inspection Certificate, Certificate of Occupancy, or Temporary Certificate of Occupancy
  • If the classification change involves construction or tenant-finish work, file the standard Building Permit Application (Commercial Tenant Finish checkbox) with the Community Development Department
  • If the classification change is purely a new business/tenant occupying an existing space with no construction, file through the City's Business License process (Govwell portal), which coordinates review with Zoning, Building, and safety requirements
  • Estimated permit valuation must be provided at time of application where a building permit is required, per CMC § 10.04.120

Required documents

  • OptionalBuilding Permit Application (Commercial Tenant Finish)Official Centerville City Community Development Department form; used when the occupancy-classification change involves construction or tenant-finish work. Submitted by email to donna.wilkinson@centervilleutah.gov.
  • OptionalBusiness License Application (Govwell portal)Official Centerville City business license application, which the City's Business Licenses and Permits page confirms also covers business 'location changes'; coordinated with Zoning, Building, and safety-requirement reviews prior to issuance. Used when no construction accompanies the change of use.

Fee schedule

Fee typeAmountNotes
Building Permit Fee (valuation-based) -- if construction/tenant-finish work accompanies the classification changeSame Total Building Valuation Chart as new commercial construction (Fee Schedule § 4.010), plus 65% Commercial Plan Review (Fee Schedule § 4.040)Centerville City Fee Schedule §§ 4.010/4.040, re-confirmed via direct fetch of the full fee schedule 2026-07-21. No separate, lower fee table exists for a change-of-occupancy scope -- it is billed identically to new commercial construction/tenant improvement.
Business License Fee (base + enhanced service fee) -- if no construction accompanies the classification change$40 base fee (all businesses except home occupations) plus a tiered Enhanced Service Fee by square footage ($50-$260) plus $4 per employeeCenterville City Fee Schedule, Chapter 5.010 (Business License), confirmed via direct fetch 2026-07-21. The same base fee/tier structure applies to new businesses, renewals, and location/use changes -- no distinct 'change of use' or 'change of occupancy' line item is itemized.

Sources & verification

Verified against official sources. Last reviewed 2026-07-07.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Centerville building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-07-08)View current record →All versions →

Permalink: /utah/davis-county/centerville-ut/as-of/2026-07-16/

Snapshot date: 2026-07-16

Commit: 9d25784

Reproducible from PermitBase’s version-controlled dataset, commit 9d25784.