Version history — Centerville, Utah
This is PermitBase’s own verified record for Centerville, reconstructed from this dataset’s version-controlled history. Each version below reflects what our record stated as of that date — it is not a warranty of what Centerville’s actual law was at that time.
Permanent link to today’s record
Look up a specific date
Pick a date and we’ll show you the record as it stood then.
All versions
- 2026-08-26Current record
- 2026-08-21Superseded
- 2026-08-17Superseded
- 2026-07-22Superseded
- 2026-07-20Superseded
- Centerville, Utah — Sign Permit fee record added: Sign Permit Fee (standard) (Based on Building Valuation — same fee table as CFS 4 (Building Permit Fees))
- Centerville, Utah — Sign Permit fee record added: Temporary Sign Permit Fee ($30.00)
- Centerville, Utah — Sign Permit fee record added: Street Signs (See CFS 17 (Street and Excavation Permit Fees))
- Centerville, Utah — Sign Permit fee record removed: Sign Permit Fee
- Centerville, Utah — EV Charger / EVSE Permit record added
- Centerville, Utah — Sign Permit record added
- 2026-07-19Superseded
- 2026-07-16Superseded
- 2026-07-08Superseded
- Centerville, Utah — plan-review timeline record updated: 3–3 business days
- 2026-07-07Initial record — coverage of Centerville began