Skip to main content
PermitBase

Version history — Centerville, Utah

This is PermitBase’s own verified record for Centerville, reconstructed from this dataset’s version-controlled history. Each version below reflects what our record stated as of that date — it is not a warranty of what Centerville’s actual law was at that time.

Permanent link to today’s record

/utah/davis-county/centerville-ut/as-of/2026-08-26/

Look up a specific date

Pick a date and we’ll show you the record as it stood then.

All versions

  • 2026-08-26Current record
  • 2026-08-21Superseded
  • 2026-08-17Superseded
  • 2026-07-22Superseded
  • 2026-07-20Superseded
    • Centerville, Utah — Sign Permit fee record added: Sign Permit Fee (standard) (Based on Building Valuation — same fee table as CFS 4 (Building Permit Fees))
    • Centerville, Utah — Sign Permit fee record added: Temporary Sign Permit Fee ($30.00)
    • Centerville, Utah — Sign Permit fee record added: Street Signs (See CFS 17 (Street and Excavation Permit Fees))
    • Centerville, Utah — Sign Permit fee record removed: Sign Permit Fee
    • Centerville, Utah — EV Charger / EVSE Permit record added
    • Centerville, Utah — Sign Permit record added
  • 2026-07-19Superseded
  • 2026-07-16Superseded
  • 2026-07-08Superseded
    • Centerville, Utah — plan-review timeline record updated: 3–3 business days
  • 2026-07-07Initial record — coverage of Centerville began