West Point building permits

Verified

West Point, Utah — as published 2026-07-16.

Verified 2026-07-08 · Source

Codes adopted

2024 International Building Code (IBC), including appendices C & J — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(a); supersedes the 2021 edition. West Point City's official New Home Design Criteria document (re-fetched live 2026-07-16, unchanged) still lists '2021 International Building Code, including appendices C & J' effective July 1, 2023, and has not been updated for the 7/1/2026 statewide transition — the statute controls over the lagging city document.2021 International Residential Code, including appendix AQ, except residential provisions of Chapter 11 (Energy Efficiency) — REMAINS CURRENT; Utah Code § 15A-2-103(1)(b)/(c) did NOT change this edition in the 7/1/2026 amendment. Consistent with West Point's own New Home Design Criteria document.2024 International Plumbing Code (IPC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(d); supersedes the 2021 edition. West Point's Design Criteria document (re-fetched live 2026-07-16) still lists '2021 International Plumbing Code' and has not been updated.2024 International Mechanical Code (IMC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(e); supersedes the 2021 edition. West Point's Design Criteria document (re-fetched live 2026-07-16) still lists '2021 International Mechanical Code' and has not been updated.2024 International Fuel Gas Code (IFGC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(f); supersedes the 2021 edition. West Point's Design Criteria document (re-fetched live 2026-07-16) still lists '2021 International Fuel Gas Code' and has not been updated.2023 National Electrical Code (NEC) — CURRENT statewide per Utah Code § 15A-2-103(1)(g); UNCHANGED by the 7/1/2026 amendment (2023 has been the statewide NEC edition since before this cycle). West Point's Design Criteria document (re-fetched live 2026-07-16) lists '2020 National Electrical Code issued by the National Fire Protection Association (NFPA),' which is NOT a valid statewide-adopted edition and has not been corrected by the City — the statute controls. Confirm the currently enforced NEC edition directly with the Building Department before relying on the City's own document for a live project.2024 International Energy Conservation Code (IECC), single unsplit statewide edition — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(h); COLLAPSES the residential/commercial split previously listed here into one edition, since § 15A-2-103 does not carry a residential/commercial IECC split. West Point's own Design Criteria document (re-fetched live 2026-07-16, unchanged) still splits '2015 International Energy Conservation Code (residential)' and '2021 International Energy Conservation Code (commercial)' — both stale editions, both now superseded by the single 2024 statewide edition; the prior residential/commercial split is preserved below as explicit history.HISTORY (superseded by the single 2024 IECC entry above): West Point's Design Criteria document lists the residential IECC as the 2015 edition and the commercial IECC as the 2021 edition, both effective July 1, 2023 — this residential/commercial split reflected the pre-7/1/2026 code cycle and does not exist under the current statute, which adopts one unsplit IECC edition.2024 International Existing Building Code (IEBC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(i); supersedes the 2021 edition. West Point's Design Criteria document (re-fetched live 2026-07-16) still lists '2021 International Existing Building Code' and has not been updated.Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(n); supersedes the 2021 edition. West Point's Design Criteria document (re-fetched live 2026-07-16) still lists '2021 International Swimming Pool & Spa' and has not been updated.MBI 1200 and MBI 1205 (manufactured/modular construction standards) — statewide per Utah Code § 15A-2-103(1)(o); not itemized in West Point's Design Criteria document, added here per statute since the City's own materials omit it.NOTE (2026-07-16 re-verification): Utah Code § 15A-2-103, version effective 7/1/2026 (superseded 1/1/2027), took effect 15 days before this re-verification. IBC/IPC/IMC/IFGC/IECC/IEBC/residential ISPSC are now 2024 statewide; IRC (2021) and NEC (2023) did NOT change. West Point's own New Home Design Criteria PDF was re-fetched live 2026-07-16 and is byte-identical in substance to what this file previously described: still headed 'Effective July 1, 2023' and listing 2021 IBC/IPC/IMC/IFGC/IEBC/ISPSC, a residential/commercial IECC split (2015/2021), and an outright incorrect '2020 National Electrical Code' — none of these have been updated by the City. The statute is cited directly as governing throughout; the City's lagging document is preserved above as recorded history, not deleted.

Permit types & fees

Residential Building Permit

Verified

Required for new single-family residential construction in West Point. Applications are submitted through the city's online permit portal (City Inspect) with builder valuation and square footage; the Building Permit Fee itself is calculated from project valuation and square footage per the city's official Fee Schedule, with no separate flat fee published.

Verified 2026-07-19 · Source

Requirements

  • A set of plans to scale, stamped by an engineer
  • A set of structural calculations stamped by an engineer
  • A copy of MEC Check (Model Energy Code) and a copy of RES Check
  • Site plans showing address, lot number, and all setbacks (front, rear, and sides), including a drainage plan with elevations matching development drawings
  • A DOPL Owner/Builder Certificate, completed, signed, and notarized (if applicable)
  • Building permit application submitted via the City Inspect online portal with all fees paid before construction begins
  • Code summary referencing the applicable adopted codes, per West Point's New Home Design Criteria document (which itself still lists 2021 IBC/IPC/IMC/IFGC/IEBC, 2020 NEC, and a split 2015/2021 IECC as of live re-check 2026-07-16 — statewide-current editions are 2024 IBC/IPC/IMC/IFGC/IEBC, 2023 NEC, and a single unsplit 2024 IECC per Utah Code § 15A-2-103; 2021 IRC is unchanged)

Required documents

  • RequiredChecklist for New Residential ConstructionWest Point City's official checklist enumerating required stamped plans, structural calculations, energy compliance documents (MEC/RES Check), site plan, and DOPL Owner/Builder Certificate.
  • RequiredNew Home Design CriteriaOfficial document listing seismic, snow load, wind, and frost-depth design criteria plus the full list of codes that must be referenced in the submitted code summary.
  • RequiredBuilding Permit Application (City Inspect portal)Submitted online at westpoint.cityinspect.com/login, including builder valuation, square footage, and all contractor information.

Fee schedule

Fee typeAmountNotes
Building Permit FeeBased on building valuation and square footageWest Point City Fee Schedule, Fiscal Year 2026 (effective July 1, 2025), Safety/Inspection Fees section: 'Building Permit Fee — Based on building valuation and square footage.' No separate flat-dollar valuation table is published on the public fee schedule; valuation and square footage are entered directly into the City Inspect portal at time of application, per the Building Permit Procedures document.
Residential Plan Review and Inspection Fee25% of permit feeWest Point City Fee Schedule FY2026: 'Residential plan review and inspection fee — 25% of permit fee.'
Re-inspection Fee$50West Point City Fee Schedule FY2026, Safety/Inspection Fees section.
One-time Inspection Fee$50West Point City Fee Schedule FY2026, Safety/Inspection Fees section.

Basement Finish Permit

Verified

Required for finishing a basement (framing, electrical, plumbing, HVAC) in an existing West Point home. West Point publishes a dedicated code-minimums document and checklist distinct from its new-construction requirements.

Verified 2026-07-08 · Source

Requirements

  • Drawings of rooms to be finished, with sizes and locations of all electrical outlets, lights, and smoke detectors
  • Permit application filed on the City Inspect portal with all drawings uploaded
  • Compliance with West Point's published Basement Finish code minimums (egress, ceiling height, fire blocking, electrical, ventilation, insulation)

Required documents

  • RequiredBasement Finish ChecklistWest Point City's official checklist for basement finish permit submittals, covering required drawings and the 4-Way/Insulation/Final inspection sequence.
  • RequiredCode for Finishing BasementsWest Point City's official document listing 17 local code minimums for basement finishes, including egress window/window-well dimensions, minimum ceiling heights, fire blocking, receptacle spacing, GFCI/AFCI requirements, smoke/CO alarms, dryer vent length limits, and minimum R-13 foundation wall insulation.
  • RequiredBuilding Permit Application (City Inspect portal)Submitted online at westpoint.cityinspect.com/login.

Fee schedule

Fee typeAmountNotes
Building Permit FeeBased on building valuation and square footageWest Point does not publish a separate basement-finish fee line; basement finish permits are charged under the same valuation/square-footage-based Building Permit Fee as new construction, per the West Point City Fee Schedule FY2026, plus the 25% Residential Plan Review and Inspection Fee.
Residential Plan Review and Inspection Fee25% of permit feeWest Point City Fee Schedule FY2026, Safety/Inspection Fees section.

Accessory Structure / Accessory Building Permit

Verified

Required for sheds, garages, workshops, and other accessory buildings over 200 square feet in West Point. Buildings 200 square feet or less have a separate no-fee application track.

Verified 2026-07-08 · Source

Requirements

  • Accessory building(s) may not exceed 10% of total lot area
  • Maximum height 18 feet on lots under 1/2 acre (21,780 sq ft) or 25 feet on lots 1/2 acre or larger, measured from the peak of the roof to ground level
  • Minimum 5-foot side-yard setback from any side property line
  • Minimum 5-foot setback from the main residence
  • Rear-yard setback scaling from 3 feet (wall height 0–12 feet) to 5 feet (12+–18 feet) to 10 feet (18+–25 feet), per the official setback table
  • Site plan showing the exact location of the proposed building on the property
  • Construction drawings illustrating the design and specifications of the building

Required documents

  • RequiredAccessory Structure RequirementsWest Point City's official handout ('Thinking of Adding an Accessory Building?') covering size limits, height limits, and setback requirements for accessory buildings.
  • OptionalNo Fee Accessory Building Application (for buildings 200 sq. ft. or less)Separate, no-fee application track for small accessory buildings not exceeding 200 square feet, per West Point City's published application form.
  • RequiredBuilding Permit Application (City Inspect portal)Required for accessory buildings over 200 square feet; submitted online at westpoint.cityinspect.com/login with a site plan and construction drawings.

Fee schedule

Fee typeAmountNotes
Building Permit FeeBased on building valuation and square footage (no fee if 200 sq. ft. or less)West Point does not publish a separate accessory-structure fee line on its Fee Schedule; accessory buildings over 200 sq. ft. are charged under the same valuation/square-footage-based Building Permit Fee per the FY2026 Fee Schedule. Buildings 200 sq. ft. or less use West Point's published 'No Fee Accessory Building Application' track.

EV Charger / EVSE Permit

Verified

West Point City has not published a distinct EV-charger fee category or a separate electrical-permit line item. The FY2026 Fee Schedule (effective July 1, 2025) lists only a single 'Building Permit Fee — Based on building valuation and square footage' under SAFETY/INSPECTION FEES, with no separate trade-specific (electrical, plumbing, mechanical) fee line published. EV charger/EVSE installation is billed under this same general Building Permit Fee, the same mechanism used for all other permit types in the city's schedule.

Verified 2026-07-20 · Source

Requirements

  • Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property

Required documents

  • RequiredBuilding Permit ApplicationFiled with West Point City; no dedicated EV-charger application or checklist exists.

Fee schedule

Fee typeAmountNotes
Building Permit FeeBased on building valuation and square footageWest Point City Fee Schedule, Fiscal Year 2026 (effective July 1, 2025), SAFETY / INSPECTION FEES: 'Building Permit Fee — Based on building valuation and square footage.' No separate electrical-permit or EV-charger line item is published.
Residential plan review and inspection fee25% of permit feeWest Point City Fee Schedule, Fiscal Year 2026.
Re-inspection fee$50West Point City Fee Schedule, Fiscal Year 2026.

Solar PV / Solar Panel Installation Permit

Verified

West Point City has not published a distinct solar or solar-PV permit type or fee category. The Building Department's official page lists building permits as required for re-roofs, electrical work, signs, and fences, with no separate solar or photovoltaic category mentioned; the FY2026 Fee Schedule (effective July 1, 2025) likewise lists only a single valuation/square-footage-based 'Building Permit Fee' under SAFETY/INSPECTION FEES, with no solar, photovoltaic, or renewable-energy line item anywhere in the document (confirmed by direct review of all 9 pages of the fee schedule). A rooftop or ground-mount solar PV installation is billed under this same general Building Permit Fee — the same mechanism the city uses for EV chargers and other trade work with no dedicated fee line — with PV wiring and interconnection work also falling under the Building Department's general 'electrical work' permit category.

Verified 2026-07-21 · Source

Requirements

  • Installation of a rooftop or ground-mount solar photovoltaic (PV) system at a residential or commercial property
  • Building permit application filed via the City Inspect online portal, including project valuation and system specifications
  • Compliance with the statewide-adopted 2023 National Electrical Code (NEC) for PV system wiring and interconnection, per Utah Code § 15A-2-103(1)(g)

Required documents

  • RequiredBuilding Permit Application (City Inspect portal)Filed with West Point City via westpoint.cityinspect.com/login; no dedicated solar-PV application or checklist is published by the city.

Fee schedule

Fee typeAmountNotes
Building Permit FeeBased on building valuation and square footageWest Point City Fee Schedule, Fiscal Year 2026 (effective July 1, 2025), SAFETY / INSPECTION FEES: 'Building Permit Fee — Based on building valuation and square footage.' No separate solar, photovoltaic, or renewable-energy line item is published anywhere in the schedule.
Residential plan review and inspection fee25% of permit feeWest Point City Fee Schedule, Fiscal Year 2026.
Re-inspection fee$50West Point City Fee Schedule, Fiscal Year 2026, Safety/Inspection Fees section.

Swimming Pool Permit

Verified

Required for in-ground and permanent swimming pool installation in West Point. West Point's Fee Schedule lists a distinct flat fee for this permit type, separate from the general valuation-based Building Permit Fee.

Verified 2026-07-08 · Source

Requirements

  • Pool must not be located closer than 5 feet from the property line
  • Pool must be walled or fenced to at least 6 feet in height
  • Compliance with the adopted residential provisions of the International Swimming Pool & Spa Code — CURRENT edition is 2024 per Utah Code § 15A-2-103(1)(n) as of 7/1/2026 (West Point's own Design Criteria document still lists the 2021 edition as of live re-check 2026-07-16)
  • Building permit application filed via the City Inspect portal

Required documents

  • RequiredBuilding Permit Application (City Inspect portal)Submitted online at westpoint.cityinspect.com/login.

Fee schedule

Fee typeAmountNotes
Swimming Pool Permit Fee$150West Point City Fee Schedule, Fiscal Year 2026, effective July 1, 2025, Safety/Inspection Fees section: 'Swimming Pool Permit — $150.'

Commercial Building Permit

Verified

Required for new commercial construction in West Point. Applications are submitted through the city's online City Inspect portal with builder valuation and square footage; the Building Permit Fee itself is calculated the same way as residential (valuation and square footage), but the Commercial Plan Review and Inspection Fee is 60% of the building permit fee — more than double the 25% residential rate.

Verified 2026-07-19 · Source

Requirements

  • New commercial construction regulated by the statewide-adopted 2024 IBC (Utah Code § 15A-2-103(1)(a))
  • A set of plans to scale, stamped by an engineer
  • A set of structural calculations stamped by an engineer
  • Building permit application submitted via the City Inspect online portal with all fees paid before construction begins
  • North Davis Fire District and North Davis Sewer District impact fees for commercial projects are determined and paid separately to those special districts, not to West Point City directly

Required documents

  • RequiredBuilding Permit Application (City Inspect portal)Submitted online at westpoint.cityinspect.com/login, including builder valuation, square footage, and all contractor information.
  • RequiredStamped Plans and Structural CalculationsA set of plans to scale and structural calculations, both stamped by a licensed engineer.
  • RequiredCode SummaryReferencing the applicable adopted codes for the project scope, per West Point's New Home Design Criteria document conventions applied to commercial projects.

Fee schedule

Fee typeAmountNotes
Building Permit FeeBased on building valuation and square footageWest Point City Fee Schedule, Fiscal Year 2026 (effective July 1, 2025), Safety/Inspection Fees section: 'Building Permit Fee — Based on building valuation and square footage.' Same basis used for residential; no separate flat-dollar commercial valuation table is published — valuation and square footage are entered directly into the City Inspect portal at application time.
Commercial Plan Review and Inspection Fee60% of building permit feesWest Point City Fee Schedule FY2026: 'Commercial plan review and inspection fee — 60% of building permit fees' (vs. 25% for Residential plan review and inspection fee).
Non-Residential Plan Review and Inspection Fee25% of the Permit FeeWest Point City Fee Schedule FY2026 lists this as a separate line from the 60% 'Commercial' rate immediately above it; the fee schedule does not explain how 'Commercial' and 'Non-Residential' categories differ in scope. Both figures are reported here as separately published by the city rather than reconciled — confirm which rate applies to a specific project type with the Building Department (801-776-0970).
Transportation Impact Fee (General Office)$2,984 per 1,000 sq. ft.West Point City Fee Schedule FY2026, Development Impact Fees (Commercial) section.
Transportation Impact Fee (Commercial)$7,635 per 1,000 sq. ft.West Point City Fee Schedule FY2026, Development Impact Fees (Commercial) section.
Transportation Impact Fee (Manufacturing/Industrial)$1,520 per 1,000 sq. ft.West Point City Fee Schedule FY2026, Development Impact Fees (Commercial) section.
Water Impact Fee (Commercial)$1,112/ERUWest Point City Fee Schedule FY2026, Development Impact Fees (Commercial) section — same per-ERU rate as residential.
Storm Water Impact Fee (Commercial)$4,727 per acreWest Point City Fee Schedule FY2026, Development Impact Fees (Commercial) section.
Sewer Impact Fee (Commercial)$827/ERUWest Point City Fee Schedule FY2026, Development Impact Fees (Commercial) section.
Meter Installation/Water Connection (commercial)1" $450; 1.5" $500; 2" $700; 2+" Cost+$100West Point City Fee Schedule FY2026, Connection Fees section (Water Connection Fees — commercial tier).
North Davis Fire District Impact Fee (Commercial)Determined by North Davis Fire DistrictWest Point City Fee Schedule FY2026, Non-City Impact Fees section — paid separately to the district, not to West Point City.
North Davis Sewer Impact Fee (Commercial)Determined by North Davis Sewer DistrictWest Point City Fee Schedule FY2026, Non-City Impact Fees section — paid separately to the district, not to West Point City.

Certificate of Occupancy

Verified

West Point City has not published a standalone 'change of use' permit type, application, or fee line — the official Applications and Forms page lists no such form, and the FY2026 Fee Schedule has no change-of-use or Certificate of Occupancy line item. Instead, West Point's official Commercial Business License Information page states plainly: 'For new construction, a Certificate of Occupancy must be issued before a West Point City business license can be issued,' making the Certificate of Occupancy — issued at the final building-permit inspection — the operative gate for opening or changing a commercial use. For a change of use in an existing building (no new construction), the functional equivalent is Step 1 of the same city process, 'Location & Zoning Verification,' which confirms the new use complies with land use and zoning ordinances before a business license issues.

Verified 2026-07-22 · Source

Requirements

  • For new construction: all required building-permit inspections passed and a Certificate of Occupancy issued by the West Point City Building Department before a commercial business license can be issued, per the city's official Commercial Business License Information page
  • For a change of use in an existing building without new construction: Location & Zoning Verification confirming the proposed use complies with West Point's land use and zoning ordinances, per Step 1 of the same official process (contact Planning at 801-776-0970 or planning@westpointcity.org)
  • State Business Registration with the Utah Department of Commerce Division of Corporations and the Utah Department of Workforce Services
  • State Tax Registration with the Utah State Tax Commission, with West Point listed as an outlet location, for businesses selling goods or services
  • Any additional county, state, or federal licenses or permits specific to the business type, with proof uploaded with the application
  • Commercial Business License Application submitted online, which cannot be issued until the Certificate of Occupancy (new construction) or zoning verification (existing building) step is complete

Required documents

  • RequiredCommercial Business License ApplicationWest Point City's official application, submitted online, covering the six-step process from zoning verification through final license issuance; for new construction this requires proof a Certificate of Occupancy has been issued.

Fee schedule

Fee typeAmountNotes
Certificate of Occupancy IssuanceNo separate fee publishedThe FY2026 Fee Schedule (effective July 1, 2025, reviewed in full across all 9 pages) has no distinct Certificate of Occupancy or change-of-use line item anywhere in the Safety/Inspection Fees or Planning and Zoning Fees sections. The Certificate of Occupancy is issued as part of the final inspection already covered under the Building Permit Fee and associated plan review/inspection fees paid for the underlying construction permit.
Commercial Business License Fee$85West Point City Fee Schedule, Fiscal Year 2026 (effective July 1, 2025), Administrative and Business License Fees section: 'Commercial Business License Fee — $85.' This is the fee for the business license that the Certificate of Occupancy (new construction) or zoning verification (existing building) step gates, not a fee for the Certificate of Occupancy itself.

Sign Permit

Verified

Required in West Point before displaying, erecting, relocating, or altering most signs, per West Point City Code (WPCC) § 17.110.050(A): 'Except as provided in this chapter, it shall be unlawful to display, erect, relocate, or alter any sign without first filing with the community development department an application in writing and obtaining a sign permit.' West Point publishes real, distinct flat fees for both permanent and temporary signs in its official Fee Schedule, separate from the general building permit fee table.

Verified 2026-07-20 · Source

Requirements

  • Written application filed with the Community Development Department and a sign permit obtained before displaying, erecting, relocating, or altering any sign, except as exempted, per § 17.110.050(A)
  • A separate permit is required for the sign(s) of each business entity, and a separate permit is required for each group of signs on a single supporting structure, per § 17.110.050(A)
  • Structural and electrical permits are additionally required through the Building Department, depending on sign type, per § 17.110.050(A)
  • Application must be made by the property/business owner or tenant, their authorized agent, or a licensed sign contractor, on the form provided by the Community Development Department, per § 17.110.050(B)
  • Written consent of the property/building owner (or person entitled to possession) required before erecting, constructing, or maintaining any sign, per § 17.110.050(E)
  • Work authorized under a sign permit must be completed within 180 days of issuance or the permit expires and becomes null and void, with no fee refund, per § 17.110.050(D)
  • Certain signs do NOT require a sign permit, per § 17.110.050(G): changing the text/copy of an already-permitted sign; electrical, painting, or cleaning maintenance/repair of a permitted sign per its permit; interior signs; real estate signs ≤6 sq ft; political signs ≤32 sq ft (must be on private property, ≥10 ft from a driveway); window signs; memorial/building-name signs cut into a facade; official public-officer notices; public necessity/danger/railroad-crossing/public-service-company signs; national or political-subdivision flags/emblems/insignias; religious symbols and historical commemorative plaques ≤10 sq ft; house numbers/nameplates ≤2 sq ft per residential building; trespassing signs; and subdivision development signs

Required documents

  • RequiredSign Permit ApplicationWritten application filed with the Community Development Department on the department's provided form; may be submitted by the property/business owner, tenant, authorized agent, or a licensed sign contractor, per § 17.110.050(B).
  • RequiredWritten Property Owner ConsentRequired before erecting, constructing, or maintaining a sign on property the applicant does not own, per § 17.110.050(E).

Fee schedule

Fee typeAmountNotes
Permanent Sign Permit$75West Point City Fee Schedule, Fiscal Year 2026 (effective July 1, 2025), row 'Permanent Sign Permit': $75.
Temporary Sign Permit$10/signWest Point City Fee Schedule, Fiscal Year 2026, PLANNING AND ZONING FEES section, row 'Temporary Sign Permit': $10/sign.

Commercial Tenant Improvement / Tenant Finish Permit

Required for tenant improvement and remodel work in existing commercial buildings in West Point. The FY2026 Fee Schedule does not publish a tenant-improvement-specific fee line — the same valuation/square-footage-based Building Permit Fee and 60% Commercial plan review and inspection fee that apply to new commercial construction apply to tenant improvements.

Reviewed 2026-07-20 · Source

Requirements

  • Tenant improvement or remodel work in an existing commercial building, regulated by the statewide-adopted 2024 IBC (Utah Code § 15A-2-103(1)(a))
  • Building permit application submitted via the City Inspect online portal with builder valuation and square footage

Required documents

  • RequiredBuilding Permit Application (City Inspect portal)Submitted online at westpoint.cityinspect.com/login.

Fee schedule

Fee typeAmountNotes
Building Permit FeeBased on building valuation and square footageWest Point City Fee Schedule FY2026, Safety/Inspection Fees section — West Point does not publish a separate tenant-improvement fee line; tenant improvement permits are charged under the same valuation/square-footage-based Building Permit Fee as new commercial construction.
Commercial Plan Review and Inspection Fee60% of building permit feesWest Point City Fee Schedule FY2026 — no distinct tenant-improvement plan-review percentage is published; the same 60% commercial rate applies.

Fire Sprinkler System Permit

Verified

Required for installation of an automatic fire sprinkler system in West Point. West Point is a member city of North Davis Fire District (NDFD), which also serves Clearfield, Sunset, and areas of unincorporated Davis County. NDFD's Fire Marshal's Office handles fire sprinkler plan review and permitting separately from the City's own building permit process.

Verified 2026-07-19 · Source

Requirements

  • Installation of an automatic fire sprinkler system, sized by square footage of the protected building
  • Plan review and permit from North Davis Fire District's Fire Marshal's Office, in addition to the City building permit
  • Fire Marshal review covers plan review, construction, inspections, and code questions for fire protection systems

Required documents

  • RequiredFire Sprinkler System PlansPlans, specifications, and calculations for the automatic sprinkler system, submitted to the NDFD Fire Marshal's Office

Fee schedule

Fee typeAmountNotes
Fire Sprinkler System Plan Review — 0-3,000 Sq Ft (includes 1 plan review)$250.00North Davis Fire District Fee Schedule (2025.06 revision), 'Fire Sprinkler System — Plan review and permits' table, confirmed via direct page-image review of the PDF fetched live 2026-07-19.
Fire Sprinkler System Plan Review — 3,001-10,000 Sq Ft (includes 1 plan review)$350.00North Davis Fire District Fee Schedule (2025.06 revision).
Fire Sprinkler System Plan Review — 10,001+ Sq Ft (includes 1 plan review)$0.005 per square foot over 10,000 square feetNorth Davis Fire District Fee Schedule (2025.06 revision).
Fire Sprinkler System Plan Re-ReviewSame as initial plan reviewNorth Davis Fire District Fee Schedule (2025.06 revision) — each additional fire system plan review is billed at the same rate as the initial review.
Fire Sprinkler System Permit (flow, hydro, final — includes 3 inspections)$300.00North Davis Fire District Fee Schedule (2025.06 revision), 'Fire Sprinkler System — *Permits*' table: the $300 permit fee (which includes 3 inspections: flow, hydro, and final) applies uniformly across all three size tiers (0-3,000 Sq ft, 3,001-10,000 Sq ft, and 10,001+ Sq ft).
Fire Sprinkler System Additional Inspection$100.00North Davis Fire District Fee Schedule (2025.06 revision) — each inspection beyond the 3 included in the permit fee.
Fire Pump Plan Review$300.00North Davis Fire District Fee Schedule (2025.06 revision), 'Other Testing' table — applies when a fire pump is part of the sprinkler system design.
Routine Sprinkler Inspection (1-hour, business/annual)$100.00North Davis Fire District Fee Schedule (2025.06 revision), 'Inspections' table: 'Sprinkler Inspections (1-hour) — Includes 1 in-person inspection — $100.00.' This is a separate routine/annual inspection fee, distinct from the installation permit above.

Fire Alarm System Permit

Verified

Required for installation of a fire alarm system in West Point. As with fire sprinkler permits, fire alarm plan review and permitting is handled by North Davis Fire District (NDFD), the fire agency serving West Point, Clearfield, Sunset, and areas of unincorporated Davis County, separately from the City's own building permit process.

Verified 2026-07-19 · Source

Requirements

  • Installation of a fire alarm system
  • Plan review and permit from North Davis Fire District's Fire Marshal's Office, in addition to the City building permit

Required documents

  • RequiredFire Alarm System PlansPlans and specifications for the fire alarm system, submitted to the NDFD Fire Marshal's Office

Fee schedule

Fee typeAmountNotes
Fire Alarm System Installation Plan Review (includes 1 plan review)$250.00North Davis Fire District Fee Schedule (2025.06 revision), 'Fire Alarm System — Plan review and permits' table, confirmed via direct page-image review of the PDF fetched live 2026-07-19.
Fire Alarm System Plan Re-ReviewSame as initial reviewNorth Davis Fire District Fee Schedule (2025.06 revision) — each additional fire system plan review is billed at the same rate as the initial review.
Fire Alarm System Permit (includes 2 inspections)$200.00North Davis Fire District Fee Schedule (2025.06 revision), 'Fire Alarm System — *Permits*' table.
Fire Alarm System Additional InspectionSame as initial inspectionNorth Davis Fire District Fee Schedule (2025.06 revision) — each inspection beyond the 2 included in the permit fee is billed at the same rate.
Routine Alarm Inspection (1-hour, business/annual)$100.00North Davis Fire District Fee Schedule (2025.06 revision), 'Inspections' table: 'Alarm Inspections (1-hour) — Includes 1 in-person inspection — $100.00.' This is a separate routine/annual inspection fee, distinct from the installation permit above.

Sources & verification

Verified against official sources. Last reviewed 2026-07-08.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the West Point building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-07-07)View current record →All versions →

Permalink: /utah/davis-county/west-point-ut/as-of/2026-07-16/

Snapshot date: 2026-07-16

Commit: 9d25784

Reproducible from PermitBase’s version-controlled dataset, commit 9d25784.