This is PermitBase’s published record for West Point as of 2026-07-19. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.
West Point building permits
VerifiedWest Point, Utah — as published 2026-07-19.
Verified 2026-07-08 · Source
Codes adopted
Permit types & fees
Residential Building Permit
VerifiedRequired for new single-family residential construction in West Point. Applications are submitted through the city's online permit portal (City Inspect) with builder valuation and square footage; the Building Permit Fee itself is calculated from project valuation and square footage per the city's official Fee Schedule, with no separate flat fee published.
Verified 2026-07-19 · Source
Requirements
- A set of plans to scale, stamped by an engineer
- A set of structural calculations stamped by an engineer
- A copy of MEC Check (Model Energy Code) and a copy of RES Check
- Site plans showing address, lot number, and all setbacks (front, rear, and sides), including a drainage plan with elevations matching development drawings
- A DOPL Owner/Builder Certificate, completed, signed, and notarized (if applicable)
- Building permit application submitted via the City Inspect online portal with all fees paid before construction begins
- Code summary referencing the applicable adopted codes, per West Point's New Home Design Criteria document (which itself still lists 2021 IBC/IPC/IMC/IFGC/IEBC, 2020 NEC, and a split 2015/2021 IECC as of live re-check 2026-07-16 — statewide-current editions are 2024 IBC/IPC/IMC/IFGC/IEBC, 2023 NEC, and a single unsplit 2024 IECC per Utah Code § 15A-2-103; 2021 IRC is unchanged)
Required documents
- RequiredChecklist for New Residential ConstructionWest Point City's official checklist enumerating required stamped plans, structural calculations, energy compliance documents (MEC/RES Check), site plan, and DOPL Owner/Builder Certificate.
- RequiredNew Home Design CriteriaOfficial document listing seismic, snow load, wind, and frost-depth design criteria plus the full list of codes that must be referenced in the submitted code summary.
- RequiredBuilding Permit Application (City Inspect portal)Submitted online at westpoint.cityinspect.com/login, including builder valuation, square footage, and all contractor information.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee | Based on building valuation and square footage | West Point City Fee Schedule, Fiscal Year 2026 (effective July 1, 2025), Safety/Inspection Fees section: 'Building Permit Fee — Based on building valuation and square footage.' No separate… Show full citationHideWest Point City Fee Schedule, Fiscal Year 2026 (effective July 1, 2025), Safety/Inspection Fees section: 'Building Permit Fee — Based on building valuation and square footage.' No separate flat-dollar valuation table is published on the public fee schedule; valuation and square footage are entered directly into the City Inspect portal at time of application, per the Building Permit Procedures document. |
| Residential Plan Review and Inspection Fee | 25% of permit fee | West Point City Fee Schedule FY2026: 'Residential plan review and inspection fee — 25% of permit fee.' |
| Re-inspection Fee | $50 | West Point City Fee Schedule FY2026, Safety/Inspection Fees section. |
| One-time Inspection Fee | $50 | West Point City Fee Schedule FY2026, Safety/Inspection Fees section. |
Basement Finish Permit
VerifiedRequired for finishing a basement (framing, electrical, plumbing, HVAC) in an existing West Point home. West Point publishes a dedicated code-minimums document and checklist distinct from its new-construction requirements.
Verified 2026-07-08 · Source
Requirements
- Drawings of rooms to be finished, with sizes and locations of all electrical outlets, lights, and smoke detectors
- Permit application filed on the City Inspect portal with all drawings uploaded
- Compliance with West Point's published Basement Finish code minimums (egress, ceiling height, fire blocking, electrical, ventilation, insulation)
Required documents
- RequiredBasement Finish ChecklistWest Point City's official checklist for basement finish permit submittals, covering required drawings and the 4-Way/Insulation/Final inspection sequence.
- RequiredCode for Finishing BasementsWest Point City's official document listing 17 local code minimums for basement finishes, including egress window/window-well dimensions, minimum ceiling heights, fire blocking, receptacle spacing, GFCI/AFCI requirements, smoke/CO alarms, dryer vent length limits, and minimum R-13 foundation wall insulation.
- RequiredBuilding Permit Application (City Inspect portal)Submitted online at westpoint.cityinspect.com/login.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee | Based on building valuation and square footage | West Point does not publish a separate basement-finish fee line; Show full citationHideWest Point does not publish a separate basement-finish fee line; basement finish permits are charged under the same valuation/square-footage-based Building Permit Fee as new construction, per the West Point City Fee Schedule FY2026, plus the 25% Residential Plan Review and Inspection Fee. |
| Residential Plan Review and Inspection Fee | 25% of permit fee | West Point City Fee Schedule FY2026, Safety/Inspection Fees section. |
Accessory Structure / Accessory Building Permit
VerifiedRequired for sheds, garages, workshops, and other accessory buildings over 200 square feet in West Point. Buildings 200 square feet or less have a separate no-fee application track.
Verified 2026-07-08 · Source
Requirements
- Accessory building(s) may not exceed 10% of total lot area
- Maximum height 18 feet on lots under 1/2 acre (21,780 sq ft) or 25 feet on lots 1/2 acre or larger, measured from the peak of the roof to ground level
- Minimum 5-foot side-yard setback from any side property line
- Minimum 5-foot setback from the main residence
- Rear-yard setback scaling from 3 feet (wall height 0–12 feet) to 5 feet (12+–18 feet) to 10 feet (18+–25 feet), per the official setback table
- Site plan showing the exact location of the proposed building on the property
- Construction drawings illustrating the design and specifications of the building
Required documents
- RequiredAccessory Structure RequirementsWest Point City's official handout ('Thinking of Adding an Accessory Building?') covering size limits, height limits, and setback requirements for accessory buildings.
- OptionalNo Fee Accessory Building Application (for buildings 200 sq. ft. or less)Separate, no-fee application track for small accessory buildings not exceeding 200 square feet, per West Point City's published application form.
- RequiredBuilding Permit Application (City Inspect portal)Required for accessory buildings over 200 square feet; submitted online at westpoint.cityinspect.com/login with a site plan and construction drawings.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee | Based on building valuation and square footage (no fee if 200 sq. ft. or less) | West Point does not publish a separate accessory-structure fee line on its Fee Schedule; Show full citationHideWest Point does not publish a separate accessory-structure fee line on its Fee Schedule; accessory buildings over 200 sq. ft. are charged under the same valuation/square-footage-based Building Permit Fee per the FY2026 Fee Schedule. Buildings 200 sq. ft. or less use West Point's published 'No Fee Accessory Building Application' track. |
Swimming Pool Permit
VerifiedRequired for in-ground and permanent swimming pool installation in West Point. West Point's Fee Schedule lists a distinct flat fee for this permit type, separate from the general valuation-based Building Permit Fee.
Verified 2026-07-08 · Source
Requirements
- Pool must not be located closer than 5 feet from the property line
- Pool must be walled or fenced to at least 6 feet in height
- Compliance with the adopted residential provisions of the International Swimming Pool & Spa Code — CURRENT edition is 2024 per Utah Code § 15A-2-103(1)(n) as of 7/1/2026 (West Point's own Design Criteria document still lists the 2021 edition as of live re-check 2026-07-16)
- Building permit application filed via the City Inspect portal
Required documents
- RequiredBuilding Permit Application (City Inspect portal)Submitted online at westpoint.cityinspect.com/login.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Swimming Pool Permit Fee | $150 | West Point City Fee Schedule, Fiscal Year 2026, effective July 1, 2025, Safety/Inspection Fees section: 'Swimming Pool Permit — $150.' |
Commercial Building Permit
VerifiedRequired for new commercial construction in West Point. Applications are submitted through the city's online City Inspect portal with builder valuation and square footage; the Building Permit Fee itself is calculated the same way as residential (valuation and square footage), but the Commercial Plan Review and Inspection Fee is 60% of the building permit fee — more than double the 25% residential rate.
Verified 2026-07-19 · Source
Requirements
- New commercial construction regulated by the statewide-adopted 2024 IBC (Utah Code § 15A-2-103(1)(a))
- A set of plans to scale, stamped by an engineer
- A set of structural calculations stamped by an engineer
- Building permit application submitted via the City Inspect online portal with all fees paid before construction begins
- North Davis Fire District and North Davis Sewer District impact fees for commercial projects are determined and paid separately to those special districts, not to West Point City directly
Required documents
- RequiredBuilding Permit Application (City Inspect portal)Submitted online at westpoint.cityinspect.com/login, including builder valuation, square footage, and all contractor information.
- RequiredStamped Plans and Structural CalculationsA set of plans to scale and structural calculations, both stamped by a licensed engineer.
- RequiredCode SummaryReferencing the applicable adopted codes for the project scope, per West Point's New Home Design Criteria document conventions applied to commercial projects.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee | Based on building valuation and square footage | West Point City Fee Schedule, Fiscal Year 2026 (effective July 1, 2025), Safety/Inspection Fees section: 'Building Permit Fee — Based on building valuation and square footage.' Same basis used for residential; Show full citationHideWest Point City Fee Schedule, Fiscal Year 2026 (effective July 1, 2025), Safety/Inspection Fees section: 'Building Permit Fee — Based on building valuation and square footage.' Same basis used for residential; no separate flat-dollar commercial valuation table is published — valuation and square footage are entered directly into the City Inspect portal at application time. |
| Commercial Plan Review and Inspection Fee | 60% of building permit fees | West Point City Fee Schedule FY2026: 'Commercial plan review and inspection fee — 60% of building permit fees' (vs. 25% for Residential plan review and inspection fee). |
| Non-Residential Plan Review and Inspection Fee | 25% of the Permit Fee | West Point City Fee Schedule FY2026 lists this as a separate line from the 60% 'Commercial' rate immediately above it; Show full citationHideWest Point City Fee Schedule FY2026 lists this as a separate line from the 60% 'Commercial' rate immediately above it; the fee schedule does not explain how 'Commercial' and 'Non-Residential' categories differ in scope. Both figures are reported here as separately published by the city rather than reconciled — confirm which rate applies to a specific project type with the Building Department (801-776-0970). |
| Transportation Impact Fee (General Office) | $2,984 per 1,000 sq. ft. | West Point City Fee Schedule FY2026, Development Impact Fees (Commercial) section. |
| Transportation Impact Fee (Commercial) | $7,635 per 1,000 sq. ft. | West Point City Fee Schedule FY2026, Development Impact Fees (Commercial) section. |
| Transportation Impact Fee (Manufacturing/Industrial) | $1,520 per 1,000 sq. ft. | West Point City Fee Schedule FY2026, Development Impact Fees (Commercial) section. |
| Water Impact Fee (Commercial) | $1,112/ERU | West Point City Fee Schedule FY2026, Development Impact Fees (Commercial) section — same per-ERU rate as residential. |
| Storm Water Impact Fee (Commercial) | $4,727 per acre | West Point City Fee Schedule FY2026, Development Impact Fees (Commercial) section. |
| Sewer Impact Fee (Commercial) | $827/ERU | West Point City Fee Schedule FY2026, Development Impact Fees (Commercial) section. |
| Meter Installation/Water Connection (commercial) | 1" $450; 1.5" $500; 2" $700; 2+" Cost+$100 | West Point City Fee Schedule FY2026, Connection Fees section (Water Connection Fees — commercial tier). |
| North Davis Fire District Impact Fee (Commercial) | Determined by North Davis Fire District | West Point City Fee Schedule FY2026, Non-City Impact Fees section — paid separately to the district, not to West Point City. |
| North Davis Sewer Impact Fee (Commercial) | Determined by North Davis Sewer District | West Point City Fee Schedule FY2026, Non-City Impact Fees section — paid separately to the district, not to West Point City. |
Commercial Tenant Improvement / Tenant Finish Permit
Required for tenant improvement and remodel work in existing commercial buildings in West Point. The FY2026 Fee Schedule does not publish a tenant-improvement-specific fee line — the same valuation/square-footage-based Building Permit Fee and 60% Commercial plan review and inspection fee that apply to new commercial construction apply to tenant improvements.
Reviewed 2026-07-19 · Source
Requirements
- Tenant improvement or remodel work in an existing commercial building, regulated by the statewide-adopted 2024 IBC (Utah Code § 15A-2-103(1)(a))
- Building permit application submitted via the City Inspect online portal with builder valuation and square footage
Required documents
- RequiredBuilding Permit Application (City Inspect portal)Submitted online at westpoint.cityinspect.com/login.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee | Based on building valuation and square footage | West Point City Fee Schedule FY2026, Safety/Inspection Fees section — West Point does not publish a separate tenant-improvement fee line; tenant improvement permits are charged under the same valuation/square-footage-based Building Permit Fee as new commercial construction. |
| Commercial Plan Review and Inspection Fee | 60% of building permit fees | West Point City Fee Schedule FY2026 — no distinct tenant-improvement plan-review percentage is published; the same 60% commercial rate applies. |
Sources & verification
Verified against official sources. Last reviewed 2026-07-08.
Fee schedules
Applications & forms
Checklists & handouts
Online permit portal
Codes & ordinances
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the West Point building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.