Skip to main content
PermitBase

West Point building permits

Verified

Department contacts, adopted codes, permit types, fees, and gotchas for West Point, Utah.

Last verified 2026-07-08 · Source · Embed this page’s badge · Version history

Building department

Address
3200 W 300 N, West Point, UT 84015
Phone
(801) 776-0970
Office hours
Monday–Thursday 7:30 AM–5:30 PM; Friday 7:30 AM–11:30 AM

Inspection guide

See how inspections work in West Point — sequence, scheduling & re-inspection fees.

Codes adopted

Utah adopts construction codes statewide under Utah Code Title 15A (State Construction and Fire Codes Act), enforced by every jurisdiction. Chapter 4 of Title 15A codifies Legislature-enacted amendments for specific named jurisdictions (e.g., Park City, Salt Lake City, Sandy City) as part of the state construction code. Through June 30, 2026, the editions in force under Utah Code § 15A-2-103 are the 2021 IBC (with Appendices C and J), 2021 IRC, 2021 IPC, 2021 IMC, 2021 IFGC, 2021 IECC, 2021 IEBC, and 2021 ISPSC (residential provisions), together with the 2023 NEC. Effective July 1, 2026, § 15A-2-103 adopts the 2024 editions of the IBC, IPC, IMC, IFGC, IECC, IEBC, and ISPSC; the IRC remains the 2021 edition and the NEC remains the 2023 edition. Note: residential energy requirements are modified by statewide amendments, and several Utah jurisdictions document their residential energy provisions at the 2015 IECC level rather than the adopted IECC year — confirm the applicable residential energy code with your local jurisdiction. Always confirm the edition in force with your local jurisdiction.

  • 2024 International Building Code (IBC), including appendices C & J — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(a); supersedes the 2021 edition. West Point City's official New Home Design Criteria document (re-fetched live 2026-07-16, unchanged) still lists '2021 International Building Code, including appendices C & J' effective July 1, 2023, and has not been updated for the 7/1/2026 statewide transition — the statute controls over the lagging city document.
  • 2021 International Residential Code, including appendix AQ, except residential provisions of Chapter 11 (Energy Efficiency) — REMAINS CURRENT; Utah Code § 15A-2-103(1)(b)/(c) did NOT change this edition in the 7/1/2026 amendment. Consistent with West Point's own New Home Design Criteria document.
  • 2024 International Plumbing Code (IPC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(d); supersedes the 2021 edition. West Point's Design Criteria document (re-fetched live 2026-07-16) still lists '2021 International Plumbing Code' and has not been updated.
  • 2024 International Mechanical Code (IMC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(e); supersedes the 2021 edition. West Point's Design Criteria document (re-fetched live 2026-07-16) still lists '2021 International Mechanical Code' and has not been updated.
  • 2024 International Fuel Gas Code (IFGC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(f); supersedes the 2021 edition. West Point's Design Criteria document (re-fetched live 2026-07-16) still lists '2021 International Fuel Gas Code' and has not been updated.
  • 2023 National Electrical Code (NEC) — CURRENT statewide per Utah Code § 15A-2-103(1)(g); UNCHANGED by the 7/1/2026 amendment (2023 has been the statewide NEC edition since before this cycle). West Point's Design Criteria document (re-fetched live 2026-07-16) lists '2020 National Electrical Code issued by the National Fire Protection Association (NFPA),' which is NOT a valid statewide-adopted edition and has not been corrected by the City — the statute controls. Confirm the currently enforced NEC edition directly with the Building Department before relying on the City's own document for a live project.
  • 2024 International Energy Conservation Code (IECC), single unsplit statewide edition — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(h); COLLAPSES the residential/commercial split previously listed here into one edition, since § 15A-2-103 does not carry a residential/commercial IECC split. West Point's own Design Criteria document (re-fetched live 2026-07-16, unchanged) still splits '2015 International Energy Conservation Code (residential)' and '2021 International Energy Conservation Code (commercial)' — both stale editions, both now superseded by the single 2024 statewide edition; the prior residential/commercial split is preserved below as explicit history.
  • HISTORY (superseded by the single 2024 IECC entry above): West Point's Design Criteria document lists the residential IECC as the 2015 edition and the commercial IECC as the 2021 edition, both effective July 1, 2023 — this residential/commercial split reflected the pre-7/1/2026 code cycle and does not exist under the current statute, which adopts one unsplit IECC edition.
  • 2024 International Existing Building Code (IEBC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(i); supersedes the 2021 edition. West Point's Design Criteria document (re-fetched live 2026-07-16) still lists '2021 International Existing Building Code' and has not been updated.
  • Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(n); supersedes the 2021 edition. West Point's Design Criteria document (re-fetched live 2026-07-16) still lists '2021 International Swimming Pool & Spa' and has not been updated.
  • MBI 1200 and MBI 1205 (manufactured/modular construction standards) — statewide per Utah Code § 15A-2-103(1)(o); not itemized in West Point's Design Criteria document, added here per statute since the City's own materials omit it.
  • NOTE (2026-07-16 re-verification): Utah Code § 15A-2-103, version effective 7/1/2026 (superseded 1/1/2027), took effect 15 days before this re-verification. IBC/IPC/IMC/IFGC/IECC/IEBC/residential ISPSC are now 2024 statewide; IRC (2021) and NEC (2023) did NOT change. West Point's own New Home Design Criteria PDF was re-fetched live 2026-07-16 and is byte-identical in substance to what this file previously described: still headed 'Effective July 1, 2023' and listing 2021 IBC/IPC/IMC/IFGC/IEBC/ISPSC, a residential/commercial IECC split (2015/2021), and an outright incorrect '2020 National Electrical Code' — none of these have been updated by the City. The statute is cited directly as governing throughout; the City's lagging document is preserved above as recorded history, not deleted.

Permit types & fees

New residential construction activity

New privately-owned residential construction only

Housing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).

Latest month (2026-05)
14units

14 buildings · $7.7M valuation

Trailing 12 months
131units

12 of 12 months reported · #46 in Utah coverage by units

Year to date (2026 YTD through 2026-05)
42units

42 buildings · $22.5M valuation

5 month(s) reported to Census

Full year 2025
136units

136 buildings · $62.9M valuation

Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-05 vintage. Census survey data — separate from the permit-requirements verification above. All Utah building activity

Tips & gotchas

  • West Point City operates its own independent Building Department (3200 W 300 N; (801) 776-0970) — it is not contracted out to Davis County. All permits, plan review, and inspections are handled directly by city staff via the City Inspect online portal (westpoint.cityinspect.com/login).
  • West Point's Fee Schedule (FY2026) does not publish a printed dollar valuation table for its Building Permit Fee — the fee is calculated from project valuation and square footage entered directly into the City Inspect portal at application time, plus a 25% Residential Plan Review and Inspection Fee (60% for commercial).
  • Inspection call-in hours (Monday–Thursday 8:00 AM–3:00 PM, Friday 8:00 AM–11:30 AM) are narrower than the Building Department's general office hours (Monday–Thursday 7:30 AM–5:30 PM, Friday 7:30 AM–11:30 AM) — schedule inspections at least 24 hours in advance; no same-day inspections.
  • North Davis Fire District and North Davis Sewer District impact fees for commercial projects are determined and paid separately to those special districts, not to West Point City directly, per the FY2026 Fee Schedule.
  • No West Point-specific published plan-review SLA exists for any permit type; the residential building permit and basement finish permit fall back on the Utah Code § 10-20-909 statutory floor of 14 business days after a 3-business-day completeness screening period for one- and two-family dwellings/townhomes. That statutory figure was not extended to accessory structures or swimming pools, which fall outside the statute's dwelling-scoped 'plan review' definition — those two permit types are honestly left with reviewTimelineDays: null.
  • West Point's own New Home Design Criteria document (still current as live-checked 2026-07-16) lists a split-vintage energy code — 2015 IECC residential, 2021 IECC commercial — but Utah Code § 15A-2-103(1)(h) does not carry a residential/commercial IECC split; the statewide-current edition as of 7/1/2026 is a single unsplit 2024 IECC. The City's document has not been updated to reflect this; confirm with the Building Department before relying on the City's own split figures for a live project.
  • Former City Code Chapter 15.15 (Residential Construction) was repealed by Ordinance 08-17-2021B and folded into Title 17 (Land Use and Development Code); the live westpoint.municipal.codes chapter pages are behind a Cloudflare bot-challenge that blocks automated fetch, so only the code's own indexed title/chapter/ordinance listing (not full ordinance body text) could be verified for local-amendment purposes beyond what is separately confirmed via the city's own PDF handouts.

Comparable nearby cities

Fruit Heights
Both in Davis County10 shared permit types~12 mi away
Compare fees →
West Bountiful
Both in Davis County10 shared permit types~18 mi away
Compare fees →
Clearfield
Both in Davis County9 shared permit types~5 mi away
Compare fees →