Residential Building Permit — West Point, Utah · Requirements sheet
Verified 2026-07-19 · Source: https://www.westpointutah.gov/DocumentCenter/View/2272/FY2026-Fee-Schedule-
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Residential Building Permit in West Point, Utah
Required for new single-family residential construction in West Point. Applications are submitted through the city's online permit portal (City Inspect) with builder valuation and square footage; the Building Permit Fee itself is calculated from project valuation and square footage per the city's official Fee Schedule, with no separate flat fee published.
Verified 2026-07-19 · Source
When you need this permit
- A set of plans to scale, stamped by an engineer
- A set of structural calculations stamped by an engineer
- A copy of MEC Check (Model Energy Code) and a copy of RES Check
- Site plans showing address, lot number, and all setbacks (front, rear, and sides), including a drainage plan with elevations matching development drawings
- A DOPL Owner/Builder Certificate, completed, signed, and notarized (if applicable) Owner-builder
- Building permit application submitted via the City Inspect online portal with all fees paid before construction begins
- Code summary referencing the applicable adopted codes, per West Point's New Home Design Criteria document (which itself still lists 2021 IBC/IPC/IMC/IFGC/IEBC, 2020 NEC, and a split 2015/2021 IECC as of live re-check 2026-07-16 — statewide-current editions are 2024 IBC/IPC/IMC/IFGC/IEBC, 2023 NEC, and a single unsplit 2024 IECC per Utah Code § 15A-2-103; 2021 IRC is unchanged)
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 3 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Sewer and Water Lateral
First required inspection per West Point's official Checklist for New Residential Construction and Inspection Types and Guidelines.
- 2
Footings
Footing / land drain inspection, per the official Inspection Types and Guidelines document.
- 3
Foundation
Foundation inspection, per the official Checklist for New Residential Construction.
- 4
Underground / Under-Floor Plumbing
Underground plumbing inspection prior to slab or floor closure.
- 5
4-Way (Framing, Plumbing, Heating, Electric)
Combined framing, plumbing, heating, and electrical inspection.
- 6
Insulation
Insulation inspection prior to drywall.
- 7
Brick Flashing / Weather Barrier
Exterior weather barrier and brick flashing inspection, per the official Inspection Types and Guidelines document.
- 8
Power to Panel / Permanent Power
Permanent power inspection; power and gas clearances are called in the next business day after the inspection is performed, per the Inspection Types and Guidelines document.
- 9
Final
Final inspection to close out the permit.
See the full West Point inspection guide — scheduling & re-inspection fees →
Tips
- All inspections must be requested through the City Inspect portal or by calling City Hall at (801) 776-0970 at least 24 hours in advance; no same-day inspections are performed, per the official Inspection Types and Guidelines document.
- All building permits must be paid in full before any inspection can be scheduled.
- Inspections are scheduled Monday–Thursday 8:00 AM–3:00 PM and Friday 8:00 AM–11:30 AM (call-in window), per the Inspection Types and Guidelines document — note this differs from the Building Department's general office hours.
- Credit card payments through the City Inspect portal carry a 3% service fee, per the official Building Permit Procedures document.
- Utah Code § 10-20-909(8) prohibits a municipality from enforcing a plan-review requirement (and requires refund of the plan review fee) if the municipality fails to complete plan review within the statutory 14-business-day window and a licensed architect or structural engineer has stamped the plans.
- West Point has not published a distinct solar-PV permit type, fee, or checklist (checked 2026-07-19: Building Department page, FY2026 Fee Schedule, and a site search all reviewed). The Building Department page lists 'electrical work' among the categories requiring a permit under this same process, and solar photovoltaic installations would be submitted through the City Inspect portal with the fee based on valuation like other building permit work — no separate solar line item is itemized in the Fee Schedule.
- EV charger (EVSE) installation is likewise treated as standard electrical work under this same permit — the city's official FY2026 Fee Schedule (effective July 1, 2025, live-fetched 2026-07-19) lists only a valuation/square-footage-based Building Permit Fee under SAFETY / INSPECTION FEES, with no separate electrical trade-permit line item and no EV-charger or electric-vehicle-charging line item anywhere in the document. Confirm project-specific requirements at (801) 776-0970.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-19.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the West Point building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in West Point
Residential Building Permit in other cities
Compare residential building permit fees across Utah →
Look up this fee in a different city →