West Point building inspections

Verified

Inspection sequence, scheduling, and re-inspection fees for building permits in West Point, Utah.

Verified 2026-07-08 · Source

How to schedule

Inspections are requested through the building department below.

Address
3200 W 300 N, West Point, UT 84015
Phone
(801) 776-0970
Office hours
Monday–Thursday 7:30 AM–5:30 PM; Friday 7:30 AM–11:30 AM

Published scheduling rules

  • All inspections must be requested through the City Inspect portal or by calling City Hall at (801) 776-0970 at least 24 hours in advance; no same-day inspections are performed, per the official Inspection Types and Guidelines document. (Residential Building Permit)
  • All building permits must be paid in full before any inspection can be scheduled. (Residential Building Permit)
  • Inspections are scheduled Monday–Thursday 8:00 AM–3:00 PM and Friday 8:00 AM–11:30 AM (call-in window), per the Inspection Types and Guidelines document — note this differs from the Building Department's general office hours. (Residential Building Permit)
  • All inspections should be scheduled through the City Inspect portal or by calling City Hall at (801) 776-0970 at least 24 hours in advance, per the official Basement Finish Checklist. (Basement Finish Permit)
  • All inspections must be requested through the City Inspect portal or by calling City Hall at (801) 776-0970 at least 24 hours in advance. (Swimming Pool Permit)
  • All inspections must be requested through the City Inspect portal or by calling City Hall at (801) 776-0970 at least 24 hours in advance; no same-day inspections are performed. (Commercial Tenant Improvement / Tenant Finish Permit)
  • Inspection call-in hours (Monday–Thursday 8:00 AM–3:00 PM, Friday 8:00 AM–11:30 AM) are narrower than the Building Department's general office hours (Monday–Thursday 7:30 AM–5:30 PM, Friday 7:30 AM–11:30 AM) — schedule inspections at least 24 hours in advance; no same-day inspections. (General)

Inspection sequence

Applies to: Residential Building Permit

  1. 1

    Sewer and Water Lateral

    First required inspection per West Point's official Checklist for New Residential Construction and Inspection Types and Guidelines.

  2. 2

    Footings

    Footing / land drain inspection, per the official Inspection Types and Guidelines document.

  3. 3

    Foundation

    Foundation inspection, per the official Checklist for New Residential Construction.

  4. 4

    Underground / Under-Floor Plumbing

    Underground plumbing inspection prior to slab or floor closure.

  5. 5

    4-Way (Framing, Plumbing, Heating, Electric)

    Combined framing, plumbing, heating, and electrical inspection.

  6. 6

    Insulation

    Insulation inspection prior to drywall.

  7. 7

    Brick Flashing / Weather Barrier

    Exterior weather barrier and brick flashing inspection, per the official Inspection Types and Guidelines document.

  8. 8

    Power to Panel / Permanent Power

    Permanent power inspection; power and gas clearances are called in the next business day after the inspection is performed, per the Inspection Types and Guidelines document.

  9. 9

    Final

    Final inspection to close out the permit.

Applies to: Commercial Building Permit

  1. 1

    Footings

    Per West Point's standard inspection sequence for permitted construction.

  2. 2

    Foundation

    Foundation inspection.

  3. 3

    4-Way (Framing, Plumbing, Heating, Electric)

    Combined framing, plumbing, heating, and electrical inspection.

  4. 4

    Final

    Final inspection to close out the permit.

Applies to: Accessory Structure / Accessory Building Permit

  1. 1

    Footings

    Required for accessory structures with a foundation, per West Point's standard inspection sequence (Inspection Types and Guidelines document).

  2. 2

    Framing

    Framing inspection for the accessory structure.

  3. 3

    Final

    Final inspection to close out the permit.

Applies to: Basement Finish Permit

  1. 1

    4-Way (Framing, Electrical, Plumbing, Heating)

    Combined framing, electrical, plumbing, and heating inspection, per the official Basement Finish Checklist.

  2. 2

    Insulation

    Insulation inspection, per the official Basement Finish Checklist; minimum R-13 insulation required in all exterior foundation walls per the Code for Finishing Basements document.

  3. 3

    Final

    Final inspection when all work is complete, per the official Basement Finish Checklist.

Applies to: Fire Sprinkler System Permit

  1. 1

    Flow Test

    One of 3 inspections included in the $300 permit fee.

  2. 2

    Hydrostatic Test

    One of 3 inspections included in the $300 permit fee.

  3. 3

    Final

    Final of the 3 inspections included in the $300 permit fee.

Applies to: Commercial Tenant Improvement / Tenant Finish Permit

  1. 1

    Framing / Rough-In

    Per West Point's standard inspection sequence, scheduled through the City Inspect portal or by calling City Hall at (801) 776-0970 at least 24 hours in advance.

  2. 2

    Final

    Final inspection to close out the permit.

Applies to: Fire Alarm System Permit

  1. 1

    First Inspection

    Included in the $200 permit fee; NDFD fire alarm permits include 2 inspections total.

  2. 2

    Final Inspection

    Second of the 2 inspections included in the permit fee.

Applies to: Swimming Pool Permit

  1. 1

    Pre-Gunite / Pre-Pour

    Structural inspection prior to concrete placement, consistent with West Point's standard inspection sequencing for permitted construction.

  2. 2

    Final

    Final inspection confirming pool barrier/fencing (minimum 6-foot height, minimum 5-foot property-line setback) before use.

Re-inspection fees

Residential Building PermitRe-inspection Fee · West Point City Fee Schedule FY2026, Safety/Inspection Fees section.
$50
EV Charger / EVSE PermitRe-inspection fee · West Point City Fee Schedule, Fiscal Year 2026.
$50
Solar PV / Solar Panel Installation PermitRe-inspection fee · West Point City Fee Schedule, Fiscal Year 2026, Safety/Inspection Fees section.
$50

Sources & verification

Verified against official sources. Last reviewed 2026-07-08.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the West Point building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

West Point building permits

Get alerts for West Point

We'll email you when West Point's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.