Commercial Building Permit in West Point, Utah

Required for new commercial construction in West Point. Applications are submitted through the city's online City Inspect portal with builder valuation and square footage; the Building Permit Fee itself is calculated the same way as residential (valuation and square footage), but the Commercial Plan Review and Inspection Fee is 60% of the building permit fee — more than double the 25% residential rate.

Verified 2026-07-19 · Source

When you need this permit

  • New commercial construction regulated by the statewide-adopted 2024 IBC (Utah Code § 15A-2-103(1)(a))
  • A set of plans to scale, stamped by an engineer
  • A set of structural calculations stamped by an engineer
  • Building permit application submitted via the City Inspect online portal with all fees paid before construction begins
  • North Davis Fire District and North Davis Sewer District impact fees for commercial projects are determined and paid separately to those special districts, not to West Point City directly

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 3 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit FeeWest Point City Fee Schedule, Fiscal Year 2026 (effective July 1, 2025), Safety/Inspection Fees section: 'Building Permit Fee — Based on building valuation and square footage.' Same basis used for residential; no separate flat-dollar commercial valuation table is published — valuation and square footage are entered directly into the City Inspect portal at application time.
Based on building valuation and square footage
Commercial Plan Review and Inspection FeeWest Point City Fee Schedule FY2026: 'Commercial plan review and inspection fee — 60% of building permit fees' (vs. 25% for Residential plan review and inspection fee).
60% of building permit fees
Non-Residential Plan Review and Inspection FeeWest Point City Fee Schedule FY2026 lists this as a separate line from the 60% 'Commercial' rate immediately above it; the fee schedule does not explain how 'Commercial' and 'Non-Residential' categories differ in scope. Both figures are reported here as separately published by the city rather than reconciled — confirm which rate applies to a specific project type with the Building Department (801-776-0970).
25% of the Permit Fee
Transportation Impact Fee (General Office)West Point City Fee Schedule FY2026, Development Impact Fees (Commercial) section.
$2,984 per 1,000 sq. ft.
Transportation Impact Fee (Commercial)West Point City Fee Schedule FY2026, Development Impact Fees (Commercial) section.
$7,635 per 1,000 sq. ft.
Transportation Impact Fee (Manufacturing/Industrial)West Point City Fee Schedule FY2026, Development Impact Fees (Commercial) section.
$1,520 per 1,000 sq. ft.
Water Impact Fee (Commercial)West Point City Fee Schedule FY2026, Development Impact Fees (Commercial) section — same per-ERU rate as residential.
$1,112/ERU
Storm Water Impact Fee (Commercial)West Point City Fee Schedule FY2026, Development Impact Fees (Commercial) section.
$4,727 per acre
Sewer Impact Fee (Commercial)West Point City Fee Schedule FY2026, Development Impact Fees (Commercial) section.
$827/ERU
Meter Installation/Water Connection (commercial)West Point City Fee Schedule FY2026, Connection Fees section (Water Connection Fees — commercial tier).
1" $450; 1.5" $500; 2" $700; 2+" Cost+$100
North Davis Fire District Impact Fee (Commercial)West Point City Fee Schedule FY2026, Non-City Impact Fees section — paid separately to the district, not to West Point City.
Determined by North Davis Fire District
North Davis Sewer Impact Fee (Commercial)West Point City Fee Schedule FY2026, Non-City Impact Fees section — paid separately to the district, not to West Point City.
Determined by North Davis Sewer District

Review timeline

Plan review
Not published — contact the department

How long did your Commercial Building Permit permit actually take in West Point?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Footings

    Per West Point's standard inspection sequence for permitted construction.

  2. 2

    Foundation

    Foundation inspection.

  3. 3

    4-Way (Framing, Plumbing, Heating, Electric)

    Combined framing, plumbing, heating, and electrical inspection.

  4. 4

    Final

    Final inspection to close out the permit.

See the full West Point inspection guide — scheduling & re-inspection fees →

Tips

  • West Point's Fee Schedule lists both a 'Commercial plan review and inspection fee' at 60% of building permit fees and a separate 'Non-Residential Plan Review and Inspection Fee' at 25% of the Permit Fee — the schedule does not explain the distinction between these two categories; confirm which applies to a specific project with the Building Department (801-776-0970) before budgeting.
  • North Davis Fire District and North Davis Sewer District impact fees for commercial projects are determined and paid separately to those special districts, not calculated by or paid to West Point City directly.
  • Commercial water meter connection fees scale by size (1" $450 up to cost+$100 for 2+ inch), distinct from the flat residential 3/4"/1" tiers.

Frequently asked questions

West Point requires a commercial building permit for: New commercial construction regulated by the statewide-adopted 2024 IBC (Utah Code § 15A-2-103(1)(a)); A set of plans to scale, stamped by an engineer; A set of structural calculations stamped by an engineer; Building permit application submitted via the City Inspect online portal with all fees paid before construction begins; North Davis Fire District and North Davis Sewer District impact fees for commercial projects are determined and paid separately to those special districts, not to West Point City directly. If your project isn't listed, confirm with West Point City Building Department at (801) 776-0970 before starting work.

Per West Point City's official Fee Schedule (FY2026, effective July 1, 2025), the Commercial plan review and inspection fee is 60% of building permit fees — more than double the 25% Residential plan review and inspection fee. The schedule separately lists a 'Non-Residential Plan Review and Inspection Fee' of 25% of the Permit Fee without clarifying how it differs from the 60% commercial rate; confirm with the Building Department.

West Point does not publish a plan-review timeline for this permit. Contact West Point City Building Department at (801) 776-0970 for current turnaround.

You'll need: Building Permit Application (City Inspect portal); Stamped Plans and Structural Calculations; Code Summary. See the required-documents checklist on this page for details on each.

West Point requires 4 inspection(s) for a commercial building permit, in order: Footings, Foundation, 4-Way (Framing, Plumbing, Heating, Electric), Final. Schedule each through West Point City Building Department ((801) 776-0970).

Apply through West Point City Building Department at 3200 W 300 N, West Point, UT 84015. Phone: (801) 776-0970, email: alincoln@westpointutah.gov. Office hours: Monday–Thursday 7:30 AM–5:30 PM; Friday 7:30 AM–11:30 AM. Official information: https://www.westpointutah.gov/162/Building.

West Point, Utah has adopted: 2024 International Building Code (IBC), including appendices C & J — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(a); supersedes the 2021 edition. West Point City's official New Home Design Criteria document (re-fetched live 2026-07-16, unchanged) still lists '2021 International Building Code, including appendices C & J' effective July 1, 2023, and has not been updated for the 7/1/2026 statewide transition — the statute controls over the lagging city document.; 2021 International Residential Code, including appendix AQ, except residential provisions of Chapter 11 (Energy Efficiency) — REMAINS CURRENT; Utah Code § 15A-2-103(1)(b)/(c) did NOT change this edition in the 7/1/2026 amendment. Consistent with West Point's own New Home Design Criteria document.; 2024 International Plumbing Code (IPC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(d); supersedes the 2021 edition. West Point's Design Criteria document (re-fetched live 2026-07-16) still lists '2021 International Plumbing Code' and has not been updated.; 2024 International Mechanical Code (IMC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(e); supersedes the 2021 edition. West Point's Design Criteria document (re-fetched live 2026-07-16) still lists '2021 International Mechanical Code' and has not been updated.; 2024 International Fuel Gas Code (IFGC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(f); supersedes the 2021 edition. West Point's Design Criteria document (re-fetched live 2026-07-16) still lists '2021 International Fuel Gas Code' and has not been updated.; 2023 National Electrical Code (NEC) — CURRENT statewide per Utah Code § 15A-2-103(1)(g); UNCHANGED by the 7/1/2026 amendment (2023 has been the statewide NEC edition since before this cycle). West Point's Design Criteria document (re-fetched live 2026-07-16) lists '2020 National Electrical Code issued by the National Fire Protection Association (NFPA),' which is NOT a valid statewide-adopted edition and has not been corrected by the City — the statute controls. Confirm the currently enforced NEC edition directly with the Building Department before relying on the City's own document for a live project.; 2024 International Energy Conservation Code (IECC), single unsplit statewide edition — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(h); COLLAPSES the residential/commercial split previously listed here into one edition, since § 15A-2-103 does not carry a residential/commercial IECC split. West Point's own Design Criteria document (re-fetched live 2026-07-16, unchanged) still splits '2015 International Energy Conservation Code (residential)' and '2021 International Energy Conservation Code (commercial)' — both stale editions, both now superseded by the single 2024 statewide edition; the prior residential/commercial split is preserved below as explicit history.; HISTORY (superseded by the single 2024 IECC entry above): West Point's Design Criteria document lists the residential IECC as the 2015 edition and the commercial IECC as the 2021 edition, both effective July 1, 2023 — this residential/commercial split reflected the pre-7/1/2026 code cycle and does not exist under the current statute, which adopts one unsplit IECC edition.; 2024 International Existing Building Code (IEBC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(i); supersedes the 2021 edition. West Point's Design Criteria document (re-fetched live 2026-07-16) still lists '2021 International Existing Building Code' and has not been updated.; Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(n); supersedes the 2021 edition. West Point's Design Criteria document (re-fetched live 2026-07-16) still lists '2021 International Swimming Pool & Spa' and has not been updated.; MBI 1200 and MBI 1205 (manufactured/modular construction standards) — statewide per Utah Code § 15A-2-103(1)(o); not itemized in West Point's Design Criteria document, added here per statute since the City's own materials omit it.; NOTE (2026-07-16 re-verification): Utah Code § 15A-2-103, version effective 7/1/2026 (superseded 1/1/2027), took effect 15 days before this re-verification. IBC/IPC/IMC/IFGC/IECC/IEBC/residential ISPSC are now 2024 statewide; IRC (2021) and NEC (2023) did NOT change. West Point's own New Home Design Criteria PDF was re-fetched live 2026-07-16 and is byte-identical in substance to what this file previously described: still headed 'Effective July 1, 2023' and listing 2021 IBC/IPC/IMC/IFGC/IEBC/ISPSC, a residential/commercial IECC split (2015/2021), and an outright incorrect '2020 National Electrical Code' — none of these have been updated by the City. The statute is cited directly as governing throughout; the City's lagging document is preserved above as recorded history, not deleted.. Local amendments apply — see the West Point overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-19.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the West Point building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

This one’s complicated · Get an expediter

Tell us about your project and we’ll connect you with a permit expediter who works in West Point.

PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.