Accessory Structure / Accessory Building Permit — West Point, Utah · Requirements sheet
Verified 2026-07-08 · Source: https://www.westpointutah.gov/DocumentCenter/View/107/Accessory-Structure-Requirements-PDF
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Accessory Structure / Accessory Building Permit in West Point, Utah
Required for sheds, garages, workshops, and other accessory buildings over 200 square feet in West Point. Buildings 200 square feet or less have a separate no-fee application track.
Verified 2026-07-08 · Source
When you need this permit
- Accessory building(s) may not exceed 10% of total lot area
- Maximum height 18 feet on lots under 1/2 acre (21,780 sq ft) or 25 feet on lots 1/2 acre or larger, measured from the peak of the roof to ground level
- Minimum 5-foot side-yard setback from any side property line
- Minimum 5-foot setback from the main residence
- Rear-yard setback scaling from 3 feet (wall height 0–12 feet) to 5 feet (12+–18 feet) to 10 feet (18+–25 feet), per the official setback table
- Site plan showing the exact location of the proposed building on the property
- Construction drawings illustrating the design and specifications of the building
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Footings
Required for accessory structures with a foundation, per West Point's standard inspection sequence (Inspection Types and Guidelines document).
- 2
Framing
Framing inspection for the accessory structure.
- 3
Final
Final inspection to close out the permit.
See the full West Point inspection guide — scheduling & re-inspection fees →
Tips
- All accessory buildings combined cannot exceed 10% of total lot area — e.g., a 10,000 sq. ft. lot allows a maximum of 1,000 sq. ft. of accessory building footprint, per the official Accessory Structure Requirements handout.
- Side-yard placement still must meet the underlying zone's side-yard setback (typically 8–10 feet) in addition to the 5-foot accessory-building setback — confirm the exact figure for your zone with the Building Department.
- Public Utility Easements (PUEs), often along rear property lines, must be avoided entirely when siting an accessory structure — contact the city to check whether your property has one.
- Swimming pools must be at least 5 feet from the property line and walled or fenced to at least 6 feet in height, per the same official handout.
- Shipping containers (including semitrailers, boxcars, and portable on-demand storage) may not be used as permanent structures in West Point.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-08.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the West Point building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in West Point
Accessory Structure / Accessory Building Permit in other cities
Compare accessory structure / accessory building permit fees across Utah →
Look up this fee in a different city →