Sign Permit in West Point, Utah

Required in West Point before displaying, erecting, relocating, or altering most signs, per West Point City Code (WPCC) § 17.110.050(A): 'Except as provided in this chapter, it shall be unlawful to display, erect, relocate, or alter any sign without first filing with the community development department an application in writing and obtaining a sign permit.' West Point publishes real, distinct flat fees for both permanent and temporary signs in its official Fee Schedule, separate from the general building permit fee table.

Verified 2026-07-20 · Source

When you need this permit

  • Written application filed with the Community Development Department and a sign permit obtained before displaying, erecting, relocating, or altering any sign, except as exempted, per § 17.110.050(A)
  • A separate permit is required for the sign(s) of each business entity, and a separate permit is required for each group of signs on a single supporting structure, per § 17.110.050(A)
  • Structural and electrical permits are additionally required through the Building Department, depending on sign type, per § 17.110.050(A)
  • Application must be made by the property/business owner or tenant, their authorized agent, or a licensed sign contractor, on the form provided by the Community Development Department, per § 17.110.050(B)
  • Written consent of the property/building owner (or person entitled to possession) required before erecting, constructing, or maintaining any sign, per § 17.110.050(E)
  • Work authorized under a sign permit must be completed within 180 days of issuance or the permit expires and becomes null and void, with no fee refund, per § 17.110.050(D)
  • Certain signs do NOT require a sign permit, per § 17.110.050(G): changing the text/copy of an already-permitted sign; electrical, painting, or cleaning maintenance/repair of a permitted sign per its permit; interior signs; real estate signs ≤6 sq ft; political signs ≤32 sq ft (must be on private property, ≥10 ft from a driveway); window signs; memorial/building-name signs cut into a facade; official public-officer notices; public necessity/danger/railroad-crossing/public-service-company signs; national or political-subdivision flags/emblems/insignias; religious symbols and historical commemorative plaques ≤10 sq ft; house numbers/nameplates ≤2 sq ft per residential building; trespassing signs; and subdivision development signs

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Permanent Sign PermitWest Point City Fee Schedule, Fiscal Year 2026 (effective July 1, 2025), row 'Permanent Sign Permit': $75.
$75
Temporary Sign PermitWest Point City Fee Schedule, Fiscal Year 2026, PLANNING AND ZONING FEES section, row 'Temporary Sign Permit': $10/sign.
$10/sign

Review timeline

Plan review
Not published — contact the department

How long did your Sign Permit permit actually take in West Point?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

    See the full West Point inspection guide — scheduling & re-inspection fees →

    Tips

    • West Point charges a flat $75 for a Permanent Sign Permit and $10 per sign for a Temporary Sign Permit — both distinct, real dollar figures from the city's own Fee Schedule, not derived from a valuation table.
    • A sign permit expires and becomes null and void — with no fee refund — if the authorized work is not completed within 180 days of issuance, per § 17.110.050(D).
    • A long list of common sign types don't need a permit at all in West Point: real estate signs up to 6 sq ft, political signs up to 32 sq ft (private property only, 10+ ft from a driveway), window signs, interior signs, house numbers/nameplates up to 2 sq ft, and several others enumerated in § 17.110.050(G).
    • Depending on sign type, both a Community Development sign permit AND separate structural/electrical permits through the Building Department may be required, per § 17.110.050(A).

    Frequently asked questions

    West Point requires a sign permit for: Written application filed with the Community Development Department and a sign permit obtained before displaying, erecting, relocating, or altering any sign, except as exempted, per § 17.110.050(A); A separate permit is required for the sign(s) of each business entity, and a separate permit is required for each group of signs on a single supporting structure, per § 17.110.050(A); Structural and electrical permits are additionally required through the Building Department, depending on sign type, per § 17.110.050(A); Application must be made by the property/business owner or tenant, their authorized agent, or a licensed sign contractor, on the form provided by the Community Development Department, per § 17.110.050(B); Written consent of the property/building owner (or person entitled to possession) required before erecting, constructing, or maintaining any sign, per § 17.110.050(E); Work authorized under a sign permit must be completed within 180 days of issuance or the permit expires and becomes null and void, with no fee refund, per § 17.110.050(D); Certain signs do NOT require a sign permit, per § 17.110.050(G): changing the text/copy of an already-permitted sign; electrical, painting, or cleaning maintenance/repair of a permitted sign per its permit; interior signs; real estate signs ≤6 sq ft; political signs ≤32 sq ft (must be on private property, ≥10 ft from a driveway); window signs; memorial/building-name signs cut into a facade; official public-officer notices; public necessity/danger/railroad-crossing/public-service-company signs; national or political-subdivision flags/emblems/insignias; religious symbols and historical commemorative plaques ≤10 sq ft; house numbers/nameplates ≤2 sq ft per residential building; trespassing signs; and subdivision development signs. If your project isn't listed, confirm with West Point City Building Department at (801) 776-0970 before starting work.

    Per the West Point City Fee Schedule (FY2026, effective 7/1/2025), a Permanent Sign Permit is $75 and a Temporary Sign Permit is $10 per sign.

    If the work authorized by the permit is not completed within 180 days of issuance, the permit expires and becomes null and void, and no fee is refunded, per § 17.110.050(D).

    You'll need: Sign Permit Application; Written Property Owner Consent. See the required-documents checklist on this page for details on each.

    Apply through West Point City Building Department at 3200 W 300 N, West Point, UT 84015. Phone: (801) 776-0970, email: alincoln@westpointutah.gov. Office hours: Monday–Thursday 7:30 AM–5:30 PM; Friday 7:30 AM–11:30 AM. Official information: https://www.westpointutah.gov/162/Building.

    West Point, Utah has adopted: 2024 International Building Code (IBC), including appendices C & J — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(a); supersedes the 2021 edition. West Point City's official New Home Design Criteria document (re-fetched live 2026-07-16, unchanged) still lists '2021 International Building Code, including appendices C & J' effective July 1, 2023, and has not been updated for the 7/1/2026 statewide transition — the statute controls over the lagging city document.; 2021 International Residential Code, including appendix AQ, except residential provisions of Chapter 11 (Energy Efficiency) — REMAINS CURRENT; Utah Code § 15A-2-103(1)(b)/(c) did NOT change this edition in the 7/1/2026 amendment. Consistent with West Point's own New Home Design Criteria document.; 2024 International Plumbing Code (IPC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(d); supersedes the 2021 edition. West Point's Design Criteria document (re-fetched live 2026-07-16) still lists '2021 International Plumbing Code' and has not been updated.; 2024 International Mechanical Code (IMC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(e); supersedes the 2021 edition. West Point's Design Criteria document (re-fetched live 2026-07-16) still lists '2021 International Mechanical Code' and has not been updated.; 2024 International Fuel Gas Code (IFGC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(f); supersedes the 2021 edition. West Point's Design Criteria document (re-fetched live 2026-07-16) still lists '2021 International Fuel Gas Code' and has not been updated.; 2023 National Electrical Code (NEC) — CURRENT statewide per Utah Code § 15A-2-103(1)(g); UNCHANGED by the 7/1/2026 amendment (2023 has been the statewide NEC edition since before this cycle). West Point's Design Criteria document (re-fetched live 2026-07-16) lists '2020 National Electrical Code issued by the National Fire Protection Association (NFPA),' which is NOT a valid statewide-adopted edition and has not been corrected by the City — the statute controls. Confirm the currently enforced NEC edition directly with the Building Department before relying on the City's own document for a live project.; 2024 International Energy Conservation Code (IECC), single unsplit statewide edition — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(h); COLLAPSES the residential/commercial split previously listed here into one edition, since § 15A-2-103 does not carry a residential/commercial IECC split. West Point's own Design Criteria document (re-fetched live 2026-07-16, unchanged) still splits '2015 International Energy Conservation Code (residential)' and '2021 International Energy Conservation Code (commercial)' — both stale editions, both now superseded by the single 2024 statewide edition; the prior residential/commercial split is preserved below as explicit history.; HISTORY (superseded by the single 2024 IECC entry above): West Point's Design Criteria document lists the residential IECC as the 2015 edition and the commercial IECC as the 2021 edition, both effective July 1, 2023 — this residential/commercial split reflected the pre-7/1/2026 code cycle and does not exist under the current statute, which adopts one unsplit IECC edition.; 2024 International Existing Building Code (IEBC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(i); supersedes the 2021 edition. West Point's Design Criteria document (re-fetched live 2026-07-16) still lists '2021 International Existing Building Code' and has not been updated.; Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(n); supersedes the 2021 edition. West Point's Design Criteria document (re-fetched live 2026-07-16) still lists '2021 International Swimming Pool & Spa' and has not been updated.; MBI 1200 and MBI 1205 (manufactured/modular construction standards) — statewide per Utah Code § 15A-2-103(1)(o); not itemized in West Point's Design Criteria document, added here per statute since the City's own materials omit it.; NOTE (2026-07-16 re-verification): Utah Code § 15A-2-103, version effective 7/1/2026 (superseded 1/1/2027), took effect 15 days before this re-verification. IBC/IPC/IMC/IFGC/IECC/IEBC/residential ISPSC are now 2024 statewide; IRC (2021) and NEC (2023) did NOT change. West Point's own New Home Design Criteria PDF was re-fetched live 2026-07-16 and is byte-identical in substance to what this file previously described: still headed 'Effective July 1, 2023' and listing 2021 IBC/IPC/IMC/IFGC/IEBC/ISPSC, a residential/commercial IECC split (2015/2021), and an outright incorrect '2020 National Electrical Code' — none of these have been updated by the City. The statute is cited directly as governing throughout; the City's lagging document is preserved above as recorded history, not deleted.. Local amendments apply — see the West Point overview page for the full list.

    No. WPCC § 17.110.050(G) exempts a range of sign types from the permit requirement, including real estate signs up to 6 sq ft, political signs up to 32 sq ft on private property, window signs, interior signs, official public notices, religious symbols/historical plaques up to 10 sq ft, and house numbers/nameplates up to 2 sq ft, among others.

    Sources & verification

    Verified against official sources. Last reviewed 2026-07-20.

    Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the West Point building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.