Required for installation of an automatic fire sprinkler system in West Point. West Point is a member city of North Davis Fire District (NDFD), which also serves Clearfield, Sunset, and areas of unincorporated Davis County. NDFD's Fire Marshal's Office handles fire sprinkler plan review and permitting separately from the City's own building permit process.

Verified 2026-07-19 · Source

When you need this permit

  • Installation of an automatic fire sprinkler system, sized by square footage of the protected building
  • Plan review and permit from North Davis Fire District's Fire Marshal's Office, in addition to the City building permit
  • Fire Marshal review covers plan review, construction, inspections, and code questions for fire protection systems

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Fire Sprinkler System Plan Review — 0-3,000 Sq Ft (includes 1 plan review)North Davis Fire District Fee Schedule (2025.06 revision), 'Fire Sprinkler System — Plan review and permits' table, confirmed via direct page-image review of the PDF fetched live 2026-07-19.
$250.00
Fire Sprinkler System Plan Review — 3,001-10,000 Sq Ft (includes 1 plan review)North Davis Fire District Fee Schedule (2025.06 revision).
$350.00
Fire Sprinkler System Plan Review — 10,001+ Sq Ft (includes 1 plan review)North Davis Fire District Fee Schedule (2025.06 revision).
$0.005 per square foot over 10,000 square feet
Fire Sprinkler System Plan Re-ReviewNorth Davis Fire District Fee Schedule (2025.06 revision) — each additional fire system plan review is billed at the same rate as the initial review.
Same as initial plan review
Fire Sprinkler System Permit (flow, hydro, final — includes 3 inspections)North Davis Fire District Fee Schedule (2025.06 revision), 'Fire Sprinkler System — *Permits*' table: the $300 permit fee (which includes 3 inspections: flow, hydro, and final) applies uniformly across all three size tiers (0-3,000 Sq ft, 3,001-10,000 Sq ft, and 10,001+ Sq ft).
$300.00
Fire Sprinkler System Additional InspectionNorth Davis Fire District Fee Schedule (2025.06 revision) — each inspection beyond the 3 included in the permit fee.
$100.00
Fire Pump Plan ReviewNorth Davis Fire District Fee Schedule (2025.06 revision), 'Other Testing' table — applies when a fire pump is part of the sprinkler system design.
$300.00
Routine Sprinkler Inspection (1-hour, business/annual)North Davis Fire District Fee Schedule (2025.06 revision), 'Inspections' table: 'Sprinkler Inspections (1-hour) — Includes 1 in-person inspection — $100.00.' This is a separate routine/annual inspection fee, distinct from the installation permit above.
$100.00

Review timeline

Plan review
Not published — contact the department

How long did your Fire Sprinkler System Permit permit actually take in West Point?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Flow Test

    One of 3 inspections included in the $300 permit fee.

  2. 2

    Hydrostatic Test

    One of 3 inspections included in the $300 permit fee.

  3. 3

    Final

    Final of the 3 inspections included in the $300 permit fee.

See the full West Point inspection guide — scheduling & re-inspection fees →

Tips

  • West Point is a member city of North Davis Fire District (NDFD), which also serves Clearfield and Sunset — fire sprinkler plan review and permitting go through NDFD's Fire Marshal's Office, not the West Point Building Department.
  • NDFD's sprinkler plan review fee is tiered by square footage ($250 up to 3,000 sq ft, $350 for 3,001-10,000 sq ft, $0.005/sq ft over 10,000 sq ft beyond that point), but the $300 permit fee (3 inspections) is flat across all three tiers.
  • A separate $300 Fire Pump Plan Review fee applies if the sprinkler system design includes a fire pump.

Frequently asked questions

West Point requires a fire sprinkler system permit for: Installation of an automatic fire sprinkler system, sized by square footage of the protected building; Plan review and permit from North Davis Fire District's Fire Marshal's Office, in addition to the City building permit; Fire Marshal review covers plan review, construction, inspections, and code questions for fire protection systems. If your project isn't listed, confirm with West Point City Building Department at (801) 776-0970 before starting work.

Per North Davis Fire District's fee schedule (2025.06 revision): plan review is $250 (0-3,000 sq ft), $350 (3,001-10,000 sq ft), or $0.005/sq ft over 10,000 sq ft for larger buildings. The permit itself, which includes 3 inspections (flow, hydro, final), is a flat $300 regardless of size.

West Point does not publish a plan-review timeline for this permit. Contact West Point City Building Department at (801) 776-0970 for current turnaround.

You'll need: Fire Sprinkler System Plans. See the required-documents checklist on this page for details on each.

West Point requires 3 inspection(s) for a fire sprinkler system permit, in order: Flow Test, Hydrostatic Test, Final. Schedule each through West Point City Building Department ((801) 776-0970).

Apply through West Point City Building Department at 3200 W 300 N, West Point, UT 84015. Phone: (801) 776-0970, email: alincoln@westpointutah.gov. Office hours: Monday–Thursday 7:30 AM–5:30 PM; Friday 7:30 AM–11:30 AM. Official information: https://www.westpointutah.gov/162/Building.

West Point, Utah has adopted: 2024 International Building Code (IBC), including appendices C & J — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(a); supersedes the 2021 edition. West Point City's official New Home Design Criteria document (re-fetched live 2026-07-16, unchanged) still lists '2021 International Building Code, including appendices C & J' effective July 1, 2023, and has not been updated for the 7/1/2026 statewide transition — the statute controls over the lagging city document.; 2021 International Residential Code, including appendix AQ, except residential provisions of Chapter 11 (Energy Efficiency) — REMAINS CURRENT; Utah Code § 15A-2-103(1)(b)/(c) did NOT change this edition in the 7/1/2026 amendment. Consistent with West Point's own New Home Design Criteria document.; 2024 International Plumbing Code (IPC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(d); supersedes the 2021 edition. West Point's Design Criteria document (re-fetched live 2026-07-16) still lists '2021 International Plumbing Code' and has not been updated.; 2024 International Mechanical Code (IMC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(e); supersedes the 2021 edition. West Point's Design Criteria document (re-fetched live 2026-07-16) still lists '2021 International Mechanical Code' and has not been updated.; 2024 International Fuel Gas Code (IFGC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(f); supersedes the 2021 edition. West Point's Design Criteria document (re-fetched live 2026-07-16) still lists '2021 International Fuel Gas Code' and has not been updated.; 2023 National Electrical Code (NEC) — CURRENT statewide per Utah Code § 15A-2-103(1)(g); UNCHANGED by the 7/1/2026 amendment (2023 has been the statewide NEC edition since before this cycle). West Point's Design Criteria document (re-fetched live 2026-07-16) lists '2020 National Electrical Code issued by the National Fire Protection Association (NFPA),' which is NOT a valid statewide-adopted edition and has not been corrected by the City — the statute controls. Confirm the currently enforced NEC edition directly with the Building Department before relying on the City's own document for a live project.; 2024 International Energy Conservation Code (IECC), single unsplit statewide edition — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(h); COLLAPSES the residential/commercial split previously listed here into one edition, since § 15A-2-103 does not carry a residential/commercial IECC split. West Point's own Design Criteria document (re-fetched live 2026-07-16, unchanged) still splits '2015 International Energy Conservation Code (residential)' and '2021 International Energy Conservation Code (commercial)' — both stale editions, both now superseded by the single 2024 statewide edition; the prior residential/commercial split is preserved below as explicit history.; HISTORY (superseded by the single 2024 IECC entry above): West Point's Design Criteria document lists the residential IECC as the 2015 edition and the commercial IECC as the 2021 edition, both effective July 1, 2023 — this residential/commercial split reflected the pre-7/1/2026 code cycle and does not exist under the current statute, which adopts one unsplit IECC edition.; 2024 International Existing Building Code (IEBC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(i); supersedes the 2021 edition. West Point's Design Criteria document (re-fetched live 2026-07-16) still lists '2021 International Existing Building Code' and has not been updated.; Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(n); supersedes the 2021 edition. West Point's Design Criteria document (re-fetched live 2026-07-16) still lists '2021 International Swimming Pool & Spa' and has not been updated.; MBI 1200 and MBI 1205 (manufactured/modular construction standards) — statewide per Utah Code § 15A-2-103(1)(o); not itemized in West Point's Design Criteria document, added here per statute since the City's own materials omit it.; NOTE (2026-07-16 re-verification): Utah Code § 15A-2-103, version effective 7/1/2026 (superseded 1/1/2027), took effect 15 days before this re-verification. IBC/IPC/IMC/IFGC/IECC/IEBC/residential ISPSC are now 2024 statewide; IRC (2021) and NEC (2023) did NOT change. West Point's own New Home Design Criteria PDF was re-fetched live 2026-07-16 and is byte-identical in substance to what this file previously described: still headed 'Effective July 1, 2023' and listing 2021 IBC/IPC/IMC/IFGC/IEBC/ISPSC, a residential/commercial IECC split (2015/2021), and an outright incorrect '2020 National Electrical Code' — none of these have been updated by the City. The statute is cited directly as governing throughout; the City's lagging document is preserved above as recorded history, not deleted.. Local amendments apply — see the West Point overview page for the full list.

No. West Point is a member city of North Davis Fire District (NDFD), and NDFD's Fire Marshal's Office handles fire sprinkler system plan review and permitting separately from the City's building permit process.

Sources & verification

Verified against official sources. Last reviewed 2026-07-19.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the West Point building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.