This is PermitBase’s published record for Unincorporated Millard County as of 2026-07-08. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.
Unincorporated Millard County building permits
VerifiedUnincorporated Millard County, Utah — as published 2026-07-08.
Verified 2026-07-08 · Source
Codes adopted
Permit types & fees
Residential Building Permit
VerifiedRequired for new residential construction, additions, and structural alterations in unincorporated Millard County. Millard County Building Department (Building Official Adam Richins) issues permits for the unincorporated county and, per a 2020 interlocal arrangement, performs building inspections for Delta City (Delta City Council voted to hire the county for inspections in March 2020, ending its contract with Sunrise Engineering). Fillmore City is NOT covered — Fillmore continues to contract with Sunrise Engineering as of the sources checked.
Verified 2026-07-08 · Source
Requirements
- New single-family dwelling construction
- Additions to existing residential structures
- Any structural modification, alteration, repair, move, demolition, or occupancy change (UCA 17-27a-802)
- All residential dwellings in the unincorporated parts of the County require a Conditional Use Permit recorded with the deed, per Millard County Building Department policy (protection of the agriculture industry in Millard County)
- Residential structures with 2,500+ sq ft on the main floor and more than one story require construction documents stamped by a licensed structural engineer and/or architect
- Certified water source capable of delivering minimum 40 psi (Millard County Code 5-2-5; 2009 IRC P2903.3)
- Minimum electrical service capable of delivering 100 amps continuously (2009 IRC E3602.1)
Required documents
- RequiredBuilding Permit Pre-Application WorksheetMillard County Building Permit Pre-Application Worksheet — applicant, owner, contractor, and project information
- RequiredTwo Complete Sets of Plans (1/4-inch to foot scale, min. 11x17)Accurate detailed drawings per the Residential Plan and Permit Acceptance Policy: plot plan, footing/foundation plan, basement plan, main/upper floor plans, elevations, wall sections, floor framing plan, roof/truss framing plan, window/door schedule, stairway sections, handrail/guardrail details, plumbing plan, electrical plan, HVAC/water heater details. Two sets required.
- RequiredLegal Description & Plat MapComplete legal description of the property, obtained from deed or Millard County Recorder's office
- RequiredZoning DesignationObtained from the zoning administrator of the jurisdiction the site is located in
- OptionalSeptic/Sewer ApprovalIf public sewer is not available, a waste water permit from the Central Utah Public Health Department is required before a building permit can be issued
- OptionalOwner/Builder AgreementRequired if the owner will act as general contractor on their own residence — must be signed and notarized
- OptionalEncroachment Permit from Millard County Road DepartmentRequired if the project needs to encroach on a public road or highway for site access
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Demolition Permit (as reference point for county-published flat fees) | $25.00 + 1% state surcharge ($0.25) = $25.25 total | Millard County Demolition Application/Permit form (millardcounty.gov). Listed for reference only — see requirements note below on the residential valuation-based fee. |
Electrical / Mechanical / Plumbing / Stucco Permit
VerifiedRequired for electrical, mechanical, plumbing, and stucco work in unincorporated Millard County, per the county's combined Electrical/Mechanical/Plumbing/Stucco permit application form.
Verified 2026-07-08 · Source
Requirements
- Electrical work (residential or commercial/pivot)
- Mechanical (HVAC) installation or replacement
- Plumbing installation or alteration
- Stucco application (including after-the-fact stucco permits)
Required documents
- RequiredMillard County Building Permit Application — Electrical/Mechanical/Plumbing/StuccoSingle combined application form listing permit type, building address, contractor or owner information, and project description
- OptionalContractor License NumberValid Utah contractor license (Utah DOPL) if not performed by the homeowner
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Electrical Permit (Residential) | $45.00 | Millard County Building Permit Application — Electrical/Mechanical/Plumbing/Stucco form (millardcounty.gov) |
| Electrical Permit (Commercial or Pivot) | $75.00 | Millard County Building Permit Application — Electrical/Mechanical/Plumbing/Stucco form |
| Mechanical Permit | $45.00 | Millard County Building Permit Application — Electrical/Mechanical/Plumbing/Stucco form |
| Plumbing Permit | $45.00 | Millard County Building Permit Application — Electrical/Mechanical/Plumbing/Stucco form |
| Stucco Permit | $75.00 | Millard County Building Permit Application — Electrical/Mechanical/Plumbing/Stucco form |
| Stucco Permit (After the Fact) | $100.00 | Millard County Building Permit Application — Electrical/Mechanical/Plumbing/Stucco form; charged when stucco was applied before a permit was obtained |
Demolition Permit
VerifiedRequired for demolition of any structure in unincorporated Millard County. Homeowner-performed demolition is regulated by the county (not State Air Quality, which only regulates contractors) for asbestos determination purposes.
Verified 2026-07-08 · Source
Requirements
- Complete demolition of any structure
- Utilities must be disconnected before demolition begins
- Water and sewer lines must be located and terminated before demolition
- Asbestos determination required — contractor or homeowner is responsible for determining if asbestos is present
- All debris including foundation must be removed and holes filled by the completion date, with a final inspection scheduled
Required documents
- RequiredMillard County Demolition Application/PermitApplicant, owner, and contractor information; schedule of demolition (start/completion date); signature required
- OptionalState Air Quality Demolition PermitRequired from Utah Division of Air Quality for contractor-performed demolition (contact 801-536-4000); not required for owner-performed demolition, but asbestos determination still applies
- OptionalAsbestos Removal ReportIf structure contains asbestos, a copy of the report from an approved asbestos removal company must be submitted to the County within 48 hours of removal. No demolition work can commence before the County reviews this report and approves by issuing the demolition permit.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Demolition Permit | $25.00 | Millard County Demolition Application/Permit form |
| State Surcharge | 1% of permit fee ($0.25 on the $25 base fee) | Millard County Demolition Application/Permit form — listed as a line item on the form ($25.25 total) |
Sources & verification
Verified against official sources. Last reviewed 2026-07-08.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Millard County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.