Unincorporated Rich County building inspections
VerifiedInspection sequence, scheduling, and re-inspection fees for building permits in Unincorporated Rich County, Utah.
Verified 2026-07-08 · Source
How to schedule
Inspections are requested through the building department below.
- Address
- Rich County Courthouse, 20 S. Main, Randolph, UT 84064 (Building Inspector Tyler D. Seaman: 564 S Norway Spruce Dr, Layton, UT 84041 — inspector operates from this mailing address but permits/payments are processed through the Rich County Courthouse)
- Phone
- 801-564-0897 (Building Inspector Tyler D. Seaman, cell); 435-793-5155 (payments — text or email preferred); 435-793-2415 (Rich County Courthouse general line)
- Office hours
- Rich County Courthouse: Monday–Friday 9:00 AM – 5:00 PM. Building Inspector has no fixed office hours — contact by cell/text or email for the best response.
- Website
- Official site
Inspection sequence
Applies to: Residential Building Permit
- 1
Foundation / Footing
Before concrete pour — verify excavation, forms, rebar, and anchor bolts
- 2
Framing
After framing and rough-in MEP, before insulation or wall cover — windows and flashing installed
- 3
Electrical
Requires a work order number from Rocky Mountain Power before the utility will provide a hook-up; a utility company may not connect electrical service without a valid building permit on file with the county
- 4
Insulation
After insulation installed, before drywall
- 5
Final
All work complete, ready for certificate of occupancy — occupancy before CO issuance forfeits the refundable deposit
Applies to: Commercial Building Permit
- 1
Foundation / Footing
Before concrete pour — verify excavation, forms, rebar, and anchor bolts against the architect/engineer-stamped plans.
- 2
Framing
After framing and rough-in MEP, before insulation or wall cover.
- 3
Electrical
Requires a work order number from Rocky Mountain Power before the utility will provide a hook-up.
- 4
Final
All work complete, ready for certificate of occupancy — occupancy before CO issuance forfeits the refundable deposit.
Applies to: Commercial Tenant Improvement / Tenant Finish Permit
- 1
Framing / Structural (if applicable)
Verified before close-in where the tenant improvement scope includes framing or structural changes.
- 2
Electrical
Requires a work order number from Rocky Mountain Power before the utility will provide a hook-up, where applicable to the tenant-space scope.
- 3
Final
All work complete, ready for certificate of occupancy.
Applies to: Fire Sprinkler / Fire Alarm Permit
- 1
Water Supply / Flow Test Verification
Static pressure, residual pressure, and flow (gpm) data confirmed per Utah Admin. Code R710-4-5, required as part of the sprinkler plan submittal to the State Fire Marshal's Office.
- 2
Final Building Inspection (Rich County)
The sprinkler/alarm installation must pass the Rich County Building Inspector's standard final inspection under the underlying building permit before a certificate of occupancy is issued.
Sources & verification
Verified against official sources. Last reviewed 2026-07-08.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Rich County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Unincorporated Rich County building permits
Get alerts for Unincorporated Rich County
We'll email you when Unincorporated Rich County's fees, documents, or codes change — not often.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.