Commercial Tenant Improvement / Tenant Finish Permit — Unincorporated Rich County, Utah · Requirements sheet
Reviewed 2026-07-19 · Source: https://www.richcounty.gov/wp-content/uploads/building-permits-certificate-of-occupancy.pdf
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Commercial Tenant Improvement / Tenant Finish Permit in Unincorporated Rich County, Utah
Required for tenant improvement and tenant finish work in existing commercial buildings anywhere the Rich County Building Department has jurisdiction — unincorporated county land and the towns of Randolph, Woodruff, and Laketown. Rich County does not publish a distinct tenant-improvement permit type, application, or fee tier separate from its general Commercial Building Permit process; the same IRC-based fee table, refundable project-cost-tiered deposit, and mandatory architect/engineer stamp on commercial plans apply. Garden City is NOT covered by this file.
Reviewed 2026-07-19 · Source
When you need this permit
- Tenant improvement or tenant finish work in an existing commercial building within unincorporated Rich County, or in Randolph, Woodruff, or Laketown
- Zoning Clearance Letter from the applicable city/town or county planning and zoning committee before the county will process the building permit
- All commercial plans must be stamped by a licensed Utah architect or engineer, per Rich County's blanket commercial-plans requirement
- Structures of 200 sq ft or less do not require a permit — same threshold documented for residential permits in this county
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 4 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Framing / Structural (if applicable)
Verified before close-in where the tenant improvement scope includes framing or structural changes.
- 2
Electrical
Requires a work order number from Rocky Mountain Power before the utility will provide a hook-up, where applicable to the tenant-space scope.
- 3
Final
All work complete, ready for certificate of occupancy.
See the full Unincorporated Rich County inspection guide — scheduling & re-inspection fees →
Tips
- Rich County's blanket 'all commercial plans must be stamped' requirement applies to tenant improvement work in a commercial building the same as it does to new commercial construction — confirm with the Building Inspector whether a small-scope tenant finish still triggers this requirement.
- Randolph, Woodruff, and Laketown tenant improvement projects still need the town's Zoning Clearance Letter FIRST before Rich County will process the building permit.
- No permit is required for structures of 200 sq ft or less — the same threshold documented for residential permits.
Frequently asked questions
Sources & verification
Key facts verified against official sources. Last reviewed 2026-07-19.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Rich County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
This one’s complicated · Get an expediter
Tell us about your project and we’ll connect you with a permit expediter who works in Unincorporated Rich County.
PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.
Other permits in Unincorporated Rich County
Commercial Tenant Improvement / Tenant Finish Permit in other cities
Compare commercial tenant improvement / tenant finish permit fees across Utah →
Look up this fee in a different city →
Related guides
Now live
Build your Unincorporated Rich County project checklist
Describe your project once and get every permit, document, and fee it triggers in Unincorporated Rich County — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →