Residential Building Permit in Unincorporated Rich County, Utah

Required for new residential construction, additions, alterations, and most structural work anywhere in unincorporated Rich County, and in the towns of Randolph, Woodruff, and Laketown (each requires a town zoning clearance first; the Rich County Building Department then reviews plans, issues the permit, and performs inspections). Garden City is NOT covered by this file — it operates its own independent building department and permitting process.

Verified 2026-07-08 · Source

When you need this permit

  • New single-family dwelling construction
  • Additions to existing residential structures
  • Any structural modification, alteration, repair, move, or demolition of a building, or change of occupancy type
  • Structures over 200 square feet (structures 200 sq ft or less do not require a permit)
  • Zoning Clearance Letter from the applicable city/town planning and zoning committee (or the county, for unincorporated land), or an approved conditional use permit, obtained before the county will process the building permit
  • Property survey narrative from a licensed surveyor, or flagged existing survey markers
  • Non-structural repair and maintenance does not require a permit

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 10 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit Fee (valuation-based)Rich County Ordinance for Building Permits and Certificates of Occupancy (adopted 2025). Because the project's declared valuation (signed contractor bid + square footage) is plugged into the standard IRC valuation fee table, this is a legitimate, verifiable master fee schedule rather than a county-specific invented figure — contact the Building Inspector for the exact dollar amount for a given project valuation.
Set by the fee table in the International Residential Code (IRC) edition adopted at the time of application — Rich County does not publish a separate dollar-figure fee schedule; per Rich County Ordinance for Building Permits and Certificates of Occupancy (adopted 2025), Section 2.D: 'The County adopts the building permit fees set out in the International Residential Code applicable at the time of application.'
Electrical Inspection (bundled)Rich County Building Permit Information handout (Building Department). Electrical work requires inspection and a work order number from Rocky Mountain Power before hookup.
Included in the building permit fee when a building permit is issued; $50.00 if electrical work is inspected without an accompanying building permit
Refundable Building Permit Deposit — under $100,000 project costRich County Ordinance for Building Permits and Certificates of Occupancy (adopted 2025), Section 4. Refunded after final inspection and certificate of occupancy, unless forfeited (permit expires without required inspections, or occupancy begins before CO issuance).
$500
Refundable Building Permit Deposit — $100,000 to $200,000 project costRich County Ordinance for Building Permits and Certificates of Occupancy (adopted 2025), Section 4.
$1,000
Refundable Building Permit Deposit — over $200,000 project costRich County Ordinance for Building Permits and Certificates of Occupancy (adopted 2025), Section 4.
$2,000
Permit Renewal (expired 30 days or less)Rich County Ordinance for Building Permits and Certificates of Occupancy (adopted 2025), Section 3.B — requires Building Inspector approval and a new inspection.
$200
Permit Renewal (expired 31–90 days)Rich County Ordinance for Building Permits and Certificates of Occupancy (adopted 2025), Section 3.B — requires Building Inspector approval and a new inspection. A permit expired over 90 days is void and must be re-applied for as new.
$500
Standard 6-Month Extension Renewal FeeRich County Ordinance for Building Permits and Certificates of Occupancy (adopted 2025), Section 3.B — for a timely extension request before expiration, requires a new inspection.
$100

Review timeline

Plan reviewUnincorporated Rich County’s published plan-review target
7–14 business days

How long did your Residential Building Permit permit actually take in Unincorporated Rich County?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Foundation / Footing

    Before concrete pour — verify excavation, forms, rebar, and anchor bolts

  2. 2

    Framing

    After framing and rough-in MEP, before insulation or wall cover — windows and flashing installed

  3. 3

    Electrical

    Requires a work order number from Rocky Mountain Power before the utility will provide a hook-up; a utility company may not connect electrical service without a valid building permit on file with the county

  4. 4

    Insulation

    After insulation installed, before drywall

  5. 5

    Final

    All work complete, ready for certificate of occupancy — occupancy before CO issuance forfeits the refundable deposit

See the full Unincorporated Rich County inspection guide — scheduling & re-inspection fees →

Tips

  • Rich County's own Building Permit Application Information packet states processing 'will require 7 days or more, unless there is a problem found, to process a building permit' once ALL required items are submitted together — submit every document as a single complete packet to avoid restarting the clock.
  • Randolph, Woodruff, and Laketown residents: obtain your town's Zoning Clearance Letter FIRST — Rich County will not process the building permit application without it. Randolph Town Office: (435) 793-3185 (Tue/Thu 9-12, 1-4). Woodruff Town Hall: (435) 793-4201. Laketown Town Office: (435) 946-9000 / clerk@laketown.utah.gov (Mon–Wed mornings).
  • Garden City is NOT covered by this Rich County file — Garden City runs its own independent building department with its own online permit filing and its own contracted inspector (enforcement@gardencityutah.gov, (435) 557-1385). Look up a separate Garden City jurisdiction file for that town.
  • No permit is required for structures of 200 sq ft or less.
  • Roof snow loads vary sharply by location within Rich County: Sweetwater Hill and Swan Creek Village 60 lbs/sq ft (ground) / 86 lbs/sq ft; Laketown, Randolph, and Woodruff 40 lbs/sq ft (ground) / 57 lbs/sq ft; Garden City's snow load varies per location — contact the Building Inspector directly for site-specific figures.
  • County-wide design parameters: frost depth 36 inches, wind speed 90 mph, soil bearing 1,500 psi, Seismic Design Category D.
  • A building permit is valid for 18 months from issuance, and can be extended in 6-month increments at the Building Inspector's discretion where there is evidence of substantial progress. A permit expired more than 90 days is void and must be reapplied for as new (full fees apply again).
  • A refundable deposit (tiered $500/$1,000/$2,000 by project cost) is required at permit issuance and returned after final inspection and certificate of occupancy — it is forfeited if the permit lapses without required inspections, or if the property is occupied before the CO is issued.
  • Beyond the county's own SLA, Utah Code § 17-79-810(4)(a) (County Land Use, Development, and Management Act; renumbered from the former § 17-36-55 effective 11/6/2025) sets a 14-business-day statutory ceiling for plan review of a one-/two-family dwelling or townhome — Rich County's own published 7-day-or-more SLA for a complete building permit packet is faster than this statutory floor and is the controlling figure for typical residential permits.
  • Solar PV installations fall under this same general Building Permit — Rich County's Building Permits and Certificate of Occupancy ordinance states a utility company may not provide an electrical hook-up without a valid building permit on file, and the county adopts its permit fees from the International Residential Code rather than publishing a distinct solar-specific fee or process.
  • EV charger / EVSE installation would fall under this same Building Permit — Rich County's Building Permit Information handout is explicit that a standalone electrical inspection (the closest published analog to a standalone EV charging-circuit install) is $50.00 if inspected without an accompanying building permit, or included in the building permit fee when bundled with one; no distinct EV/EVSE line item was found in a full-text review of the handout (re-checked 2026-07-20).

Frequently asked questions

No — per the county's Building Permit Information sheet, no building permit is needed for a structure of 200 square feet or less. Laketown's local clearance process uses the same 200 sq ft threshold.

Rich County does not publish its own dollar fee schedule. Per the county's 2025 Building Permit ordinance, the permit fee is set by the standard International Residential Code (IRC) valuation fee table applied to the project's declared value (established from the signed contractor bid and square footage). A refundable deposit is also required at issuance: $500 (projects under $100,000), $1,000 ($100,000–$200,000), or $2,000 (over $200,000), returned after final inspection and certificate of occupancy.

Per the county's own Building Permit Application Information packet: processing 'will require 7 days or more, unless there is a problem found' once every required item (survey, zoning clearance, legal description, sewer/water documentation, signed bid, plot plan, full plan set, contractor list, fire hazard form, and online application) is submitted together. Incomplete packets restart the clock.

You'll need: Building Permit Application (iWorQ online portal); Survey Narrative; Zoning Clearance Letter; Legal Description / Tax Serial Number; Sewer/Septic and Water Documentation; Signed Construction Bid; Plot Plan; Complete Set of Plans and Specifications; Contractor and Subcontractor List; Fire Hazard Severity Form. See the required-documents checklist on this page for details on each.

Unincorporated Rich County requires 5 inspection(s) for a residential building permit, in order: Foundation / Footing, Framing, Electrical, Insulation, Final. Schedule each through Rich County Building Department (801-564-0897 (Building Inspector Tyler D. Seaman, cell); 435-793-5155 (payments — text or email preferred); 435-793-2415 (Rich County Courthouse general line)).

Apply through Rich County Building Department at Rich County Courthouse, 20 S. Main, Randolph, UT 84064 (Building Inspector Tyler D. Seaman: 564 S Norway Spruce Dr, Layton, UT 84041 — inspector operates from this mailing address but permits/payments are processed through the Rich County Courthouse). Phone: 801-564-0897 (Building Inspector Tyler D. Seaman, cell); 435-793-5155 (payments — text or email preferred); 435-793-2415 (Rich County Courthouse general line), email: beaconcodeconsultants@gmail.com (Building Inspector). Office hours: Rich County Courthouse: Monday–Friday 9:00 AM – 5:00 PM. Building Inspector has no fixed office hours — contact by cell/text or email for the best response.. Official information: https://www.richcounty.gov/building-department/.

Unincorporated Rich County, Utah has adopted: 2024 International Building Code (IBC) — Utah Code § 15A-2-103(1)(a); effective since July 1, 2026, superseding the 2021 IBC; 2021 International Residential Code (IRC) — Utah Code § 15A-2-103(1)(b); unchanged by the July 1, 2026 statewide update, remains in force; 2024 International Plumbing Code (IPC) — Utah Code § 15A-2-103(1)(d); effective since July 1, 2026, superseding the 2021 IPC; 2024 International Mechanical Code (IMC) — Utah Code § 15A-2-103(1)(e); effective since July 1, 2026, superseding the 2021 IMC; 2024 International Fuel Gas Code (IFGC) — Utah Code § 15A-2-103(1)(f); effective since July 1, 2026, superseding the 2021 IFGC; 2024 International Energy Conservation Code (IECC) — Utah Code § 15A-2-103(1)(h); effective since July 1, 2026, superseding the 2021 IECC. The statute adopts a single IECC edition with no residential/commercial split.; 2024 International Existing Building Code (IEBC) — Utah Code § 15A-2-103(1)(i); effective since July 1, 2026, superseding the 2021 IEBC; 2024 residential provisions of the International Swimming Pool and Spa Code (ISPSC) — Utah Code § 15A-2-103(1)(n); effective since July 1, 2026, superseding the 2021 ISPSC; 2023 National Electrical Code (NEC) — Utah Code § 15A-2-103(1)(g); statewide in force, unchanged by the July 1, 2026 update; NOTE: Rich County's own undated 'Building Permit Information' handout previously referenced the long-superseded 2018 IBC — that document was already stale before today's update. Attempted to re-fetch the handout live on 2026-07-16 to check its current text, but the PDF returned corrupted/unparseable binary content to the fetch tool, so its present wording could not be independently re-verified today; treat the handout as unreliable for edition currency either way. The statewide-adopted 2024 IBC (effective July 1, 2026) is the legally in-force edition per Utah Code § 15A-2-103 regardless of what the handout says.; NOTE (updated 2026-07-16): The July 1, 2026 statewide code-edition transition (2024 IBC/IPC/IMC/IFGC/IECC/IEBC/ISPSC replacing 2021 editions) took effect 15 days ago per Utah Code § 15A-2-103 (version effective 7/1/2026, superseded 1/1/2027; next version's editions confirmed identical). 2021 IRC and 2023 NEC are unchanged. The International Fire Code is NOT adopted by § 15A-2-103 (it lives in Title 15A Chapter 5) and is not referenced elsewhere in this file.. Local amendments apply — see the Unincorporated Rich County overview page for the full list.

Rich County's Building Department (Building Inspector Tyler D. Seaman) issues building permits and performs inspections for unincorporated county land and for the towns of Randolph, Woodruff, and Laketown. Each of those three towns requires its own local zoning clearance first, then the actual building permit is processed and issued by the county. Garden City is the one exception — it runs its own separate, independent building department and does not route through Rich County.

Sources & verification

Verified against official sources. Last reviewed 2026-07-08.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Rich County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.