This is PermitBase’s published record for Draper as of 2026-06-30. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.
Draper building permits
VerifiedDraper, Utah — as published 2026-06-30.
Verified 2026-07-13 · Source
Codes adopted
Permit types & fees
Residential Building Permit
VerifiedRequired for new residential construction, additions, structural alterations, and structural repairs in Draper. The fee is based on 100% of the ICC Building Valuation schedule. A $500 deposit is due at application and applied to the total fee.
Verified 2026-07-13 · Source
Requirements
- New single-family or multi-family residential construction
- Additions (any size requiring plan review)
- Structural modifications — load-bearing wall removal, foundation alterations
- Conversion of non-habitable space to habitable space
- All work requiring plan review under Draper City building regulations
Required documents
- RequiredBuilding Permit ApplicationSubmit via the Draper Online Services Portal (draper.onlama.com) — account required
- RequiredConstruction PlansComplete drawings to scale — site plan, floor plans, elevations, sections, structural details. All digital files must be unlocked (not password-protected) to allow commenting by Draper City plan examiners
- RequiredGeotechnical Engineering ReportRequired for all homes, townhouses, apartments, commercial buildings, and twin homes — Draper will not accept building permit applications unless a geotechnical report for the parcel has been reviewed, approved, and accepted by Draper City
- RequiredEnergy Code Compliance DocumentationREScheck or equivalent documentation demonstrating compliance with the adopted IECC
- OptionalEngineered Truss PlansSealed truss layouts for new construction with trusses
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit — valuation-based | 100% of the ICC Schedule (International Code Council Building Valuation Data table, as published in Building Safety Journal) | Assessed on project valuation per Draper's building permit fee schedule, cited: Draper Consolidated Fee Schedule, Resolution 26-29 (Jul 2026), item 44 — re-fetched and confirmed live 2026-07-13 (100% of ICC Building Valuation Data schedule, $500 deposit due at application applied to total fee, refunds on canceled/changed permits capped at 60% of the building permit fee — text matches PDF verbatim; Resolution 25-52 (Oct 2025) PDF link is now dead (404), superseded by Resolution 26-29 (Jul 2026) at the same media URL with identical fee figures). |
| Plan Review | 65% of the building permit fee | Draper Consolidated Fee Schedule, Resolution 26-29, item 45 |
| Additional Plan Review (changes/alterations/revisions to plans) | $85.00 per hour | Draper Consolidated Fee Schedule, Resolution 26-29, item 46 |
| Public Infrastructure Repair and Restoration Bond (new residential buildings) | $5,000.00 | Draper Consolidated Fee Schedule, Resolution 26-29, item 62. Required for projects where public improvements are potentially affected. |
| Re-inspection Fee | $85.00 per inspection | Draper Consolidated Fee Schedule, Resolution 26-29, item 56 |
| After-Hours Inspection | $85.00 per hour (2-hour minimum) | Draper Consolidated Fee Schedule, Resolution 26-29, item 57 |
Electrical Permit
VerifiedRequired for electrical work in Draper including new circuits, panel upgrades, service changes, and new construction wiring. Governed by the 2023 National Electrical Code (NEC) as adopted statewide by Utah Code § 15A-2-103(1)(g). Draper charges a flat $150 electrical permit fee.
Verified 2026-07-13 · Source
Requirements
- New electrical circuits or wiring installations
- Electrical panel upgrades or replacements
- Service entrance changes
- Adding or relocating outlets, switches, or fixtures
- Generator or solar panel electrical connections
Required documents
- RequiredElectrical Permit ApplicationSubmit via the Draper Online Services Portal (draper.onlama.com) under 'Electrical' permit type
- OptionalElectrical Plan / Single-Line DiagramPanel schedule and circuit layout — required for service upgrades and new construction
- OptionalContractor LicenseValid Utah electrical contractor license (Utah DOPL) for work not performed by the homeowner
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Electrical Permit — flat fee | $150.00 | Draper Consolidated Fee Schedule, Resolution 26-29, item 50. Flat fee applies to residential electrical permits. |
| Re-inspection Fee | $85.00 per inspection | Draper Consolidated Fee Schedule, Resolution 26-29, item 56 |
Plumbing Permit
VerifiedRequired for plumbing installations, alterations, and repairs in Draper including water heaters, fixture additions, drain/waste/vent work, and gas line work. Governed by the 2021 IPC statewide (2024 IPC effective July 1, 2026). Draper charges a flat $150 plumbing permit fee.
Verified 2026-07-13 · Source
Requirements
- New plumbing fixture installations (sinks, toilets, showers)
- Water heater installation or replacement
- Water line or sewer line replacement or extension
- Gas line installation or modification
- Backflow prevention device installation
Required documents
- RequiredPlumbing Permit ApplicationSubmit via the Draper Online Services Portal (draper.onlama.com) under 'Plumbing' permit type
- OptionalPlumbing PlanRequired for larger projects — isometric or plan showing fixture locations, pipe sizes, and drainage
- OptionalContractor LicenseValid Utah plumbing contractor license (Utah DOPL) for work not performed by the homeowner
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Plumbing Permit — flat fee | $150.00 | Draper Consolidated Fee Schedule, Resolution 26-29, item 48. Flat fee covers all residential plumbing permits including water heater replacements. |
| Re-inspection Fee | $85.00 per inspection | Draper Consolidated Fee Schedule, Resolution 26-29, item 56 |
Mechanical / HVAC Permit
VerifiedRequired for heating, ventilation, and air conditioning installations, replacements, and ductwork modifications in Draper. Governed by the 2021 IMC statewide (2024 IMC effective July 1, 2026). Draper charges a flat $150 mechanical permit fee.
Verified 2026-07-13 · Source
Requirements
- Furnace or boiler installation or replacement
- Air conditioning system installation or replacement
- Ductwork installation or major modification
- Evaporative cooler installation
- Gas fireplace or wood-burning stove installation
Required documents
- RequiredMechanical Permit ApplicationSubmit via the Draper Online Services Portal (draper.onlama.com) under 'Mechanical' permit type
- OptionalEquipment SpecificationsManufacturer data sheets for furnace, AC unit, heat pump, or evaporative cooler
- OptionalMechanical PlanEquipment location, duct layout, and sizing calculations — required for larger projects
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Mechanical Permit — flat fee | $150.00 | Draper Consolidated Fee Schedule, Resolution 26-29, item 49. Flat fee covers all residential mechanical permits including furnace and AC replacements. |
| Re-inspection Fee | $85.00 per inspection | Draper Consolidated Fee Schedule, Resolution 26-29, item 56 |
Roofing Permit
VerifiedRequired for roof replacement and re-roofing in Draper. Listed as 'Re-Roof' in Draper's Online Services Portal. Fees are valuation-based under the ICC Schedule per Resolution 26-29.
Verified 2026-07-13 · Source
Requirements
- Complete roof replacement (tear-off and re-roof)
- Overlay of new roofing over existing (where code allows — max two layers)
- Structural roof repairs or modifications
- Changes to roofing material type
Required documents
- RequiredRe-Roof Permit ApplicationSubmit via the Draper Online Services Portal (draper.onlama.com) under 'Re-Roof' permit type; provide scope of work, square footage, and material specifications
- OptionalContractor LicenseValid Utah roofing contractor license (Utah DOPL) for work not performed by the homeowner
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Re-Roof Permit — valuation-based | 100% of the ICC Schedule (based on total value of roofing work) | Assessed on project valuation per Draper's building permit fee schedule, cited: Draper Consolidated Fee Schedule, Resolution 26-29 (Jul 2026), item 44 — re-fetched and confirmed live 2026-07-13. Re-Roof is a distinct permit type in Draper's Online Services Portal but is billed as a Building Permit (100% ICC Schedule), confirmed against Draper's published Applications/Licenses/Permits type list. Prior citation (Resolution 25-52, Oct 2025 PDF) went dead (404); superseded by Resolution 26-29 (Jul 2026) at the same media URL with identical fee figures. |
| Plan Review | 65% of the building permit fee | Draper Consolidated Fee Schedule, Resolution 26-29, item 45 |
| Re-inspection Fee | $85.00 per inspection | Draper Consolidated Fee Schedule, Resolution 26-29, item 56 |
Solar Panel Permit
VerifiedRequired for installation of rooftop or ground-mounted solar PV systems and energy storage systems (ESS) in Draper. Listed as 'Solar/PV/ESS' in Draper's permit portal. Draper charges a flat $600 residential solar review fee per Resolution 26-29.
Verified 2026-07-13 · Source
Requirements
- Rooftop solar panel installation
- Ground-mounted solar array installation
- Battery/energy storage system (ESS) installation
- Electrical service upgrade for solar interconnection
Required documents
- RequiredSolar/PV/ESS Permit ApplicationSubmit via the Draper Online Services Portal (draper.onlama.com) under 'Solar/PV/ESS' permit type
- RequiredSolar Site Plan / Roof PlanShowing panel placement, setbacks, and access pathways on the roof
- RequiredElectrical Single-Line DiagramSystem wiring from panels to inverter to main panel and utility meter
- RequiredStructural AnalysisRoof load calculation confirming the structure can support the panels
- RequiredEquipment SpecificationsData sheets for panels, inverter, and racking system
- OptionalInterconnection AgreementRocky Mountain Power utility approval for grid-tied systems
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Solar Panel Review — Residential | $600.00 | Draper Consolidated Fee Schedule, Resolution 26-29, item 58. Flat fee for residential Solar/PV/ESS permit review. |
| Solar Panel Review — Commercial | Actual Cost (valuation-based) | Draper Consolidated Fee Schedule, Resolution 26-29, item 59 |
| Re-inspection Fee | $85.00 per inspection | Draper Consolidated Fee Schedule, Resolution 26-29, item 56 |
Deck Permit
VerifiedRequired for new deck construction or structural modification of existing decks in Draper. Draper publishes a specific Deck submittal checklist (deck-2024.pdf). Fees are valuation-based under the ICC Schedule per Resolution 26-29.
Verified 2026-07-13 · Source
Requirements
- New deck construction attached to or detached from the house
- Decks higher than 30 inches above grade
- Structural modifications to existing decks
- Adding or replacing a deck ledger
Required documents
- RequiredDeck Permit ApplicationSubmit via the Draper Online Services Portal (draper.onlama.com)
- RequiredDeck Submittal Checklist and PlansDraper publishes a Deck submittal checklist (deck-2024.pdf) — framing plan, post/beam/joist details, footing details, ledger attachment method, and railing specifications
- RequiredSite PlanShowing deck location, setbacks from property lines, and relationship to existing structure
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Deck Permit — valuation-based | 100% of the ICC Schedule (based on total value of deck work) | Assessed on project valuation per Draper's building permit fee schedule, cited: Draper Consolidated Fee Schedule, Resolution 26-29 (Jul 2026), item 44 — re-fetched and confirmed live 2026-07-13. Decks are processed as a building permit (100% ICC Schedule); Draper's permit-type list does not carry a separate 'Deck' category, so decks fall under standard Building/New Building or Accessory Building permit types depending on attachment, per Draper's Applications/Licenses/Permits list. Prior citation (Resolution 25-52, Oct 2025 PDF) went dead (404); superseded by Resolution 26-29 (Jul 2026) at the same media URL with identical fee figures. |
| Plan Review | 65% of the building permit fee | Draper Consolidated Fee Schedule, Resolution 26-29, item 45 |
| Re-inspection Fee | $85.00 per inspection | Draper Consolidated Fee Schedule, Resolution 26-29, item 56 |
Basement Finish Permit
VerifiedRequired for finishing or remodeling an unfinished basement in Draper. Draper publishes a specific Basements submittal checklist. Processed as a Remodel/Alteration permit; fees are ICC valuation-based.
Verified 2026-07-13 · Source
Requirements
- Framing walls in an unfinished basement
- Adding a bedroom (requires egress window per IRC)
- Adding a bathroom (requires separate plumbing permit)
- Electrical wiring for new rooms (requires separate electrical permit)
- Any structural modifications
Required documents
- RequiredBasement Finish Permit ApplicationSubmit via the Draper Online Services Portal (draper.onlama.com) as a Remodel/Alteration permit
- RequiredBasement Submittal ChecklistDraper publishes a Basements checklist (basement-2023.pdf) — download from the Building Permits page before applying
- RequiredFloor PlanLayout showing room sizes, egress windows, and door locations
- RequiredElectrical PlanCircuit layout, panel capacity, smoke/CO detector locations
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Basement Finish Permit — valuation-based | 100% of the ICC Schedule (based on total value of work) | Assessed on project valuation per Draper's building permit fee schedule, cited: Draper Consolidated Fee Schedule, Resolution 26-29 (Jul 2026), item 44 — re-fetched and confirmed live 2026-07-13. Basement finishes are processed under the 'Remodel/Alteration' permit type, confirmed as a listed category in Draper's Applications/Licenses/Permits type list; billed as a Building Permit (100% ICC Schedule). Prior citation (Resolution 25-52, Oct 2025 PDF) went dead (404); superseded by Resolution 26-29 (Jul 2026) at the same media URL with identical fee figures. |
| Plan Review | 65% of the building permit fee | Draper Consolidated Fee Schedule, Resolution 26-29, item 45 |
| Electrical Permit (if adding circuits) | $150.00 flat fee | Draper Consolidated Fee Schedule, Resolution 26-29, item 50. Separate electrical permit required for new circuits. |
| Plumbing Permit (if adding bathroom or fixtures) | $150.00 flat fee | Draper Consolidated Fee Schedule, Resolution 26-29, item 48. Separate plumbing permit required if adding bathroom or fixtures. |
| Re-inspection Fee | $85.00 per inspection | Draper Consolidated Fee Schedule, Resolution 26-29, item 56 |
Demolition Permit
VerifiedRequired for partial or complete demolition of structures in Draper. A flat $150 fee applies per the Consolidated Fee Schedule (Resolution 26-29). Draper publishes a Demolition Request Plan Requirements checklist on the Building Permits page.
Verified 2026-07-13 · Source
Requirements
- Complete demolition of any structure
- Partial demolition involving structural elements
- Removal of load-bearing walls
- Demolition of structures with potential asbestos or lead paint (pre-1980 construction)
Required documents
- RequiredDemolition Permit ApplicationSubmit via the Draper Online Services Portal (draper.onlama.com) under 'Demolition' permit type; include scope, structure details, and disposal plan. Draper publishes Demolition Request Plan Requirements on the Building Permits page.
- OptionalAsbestos SurveyFederal NESHAP asbestos inspection required for structures that may contain asbestos-containing materials (generally structures built before approximately 1980)
- RequiredUtility Disconnect ConfirmationProof that gas, electric, water, and sewer are disconnected prior to demolition
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Demolition Permit | $150.00 | Draper Consolidated Fee Schedule, Resolution 26-29, item 64 |
| Re-inspection Fee | $85.00 per inspection | Draper Consolidated Fee Schedule, Resolution 26-29, item 56 |
Water Heater Permit
VerifiedRequired for water heater installation, replacement, or conversion in Draper. Processed as a plumbing permit in Draper's system. The flat $150 plumbing permit fee applies per Resolution 26-29.
Verified 2026-07-13 · Source
Requirements
- Water heater replacement (including like-for-like swaps)
- New water heater installation
- Conversion from tank to tankless water heater
- Gas line modification for water heater
Required documents
- RequiredPlumbing Permit ApplicationSubmit via the Draper Online Services Portal (draper.onlama.com) under 'Plumbing' permit type
- OptionalContractor LicenseValid Utah plumbing contractor license (Utah DOPL) for work not performed by the homeowner
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Water Heater Permit (Plumbing Permit flat fee) | $150.00 | Draper Consolidated Fee Schedule, Resolution 26-29, item 48. Water heater replacements are processed as plumbing permits. |
| Re-inspection Fee | $85.00 per inspection | Draper Consolidated Fee Schedule, Resolution 26-29, item 56 |
Retaining Wall Permit
VerifiedRequired for retaining walls over 4 feet in height in Draper. Draper has a specific Retaining Wall / Helical Permit with a $500 application fee and $250 permit fee per Resolution 26-29. Engineered plans and a geotechnical report are required. Draper publishes a Retaining Walls submittal checklist.
Verified 2026-07-13 · Source
Requirements
- Retaining walls over 4 feet in total height (measured from bottom of footing to top of wall)
- Any retaining wall supporting a surcharge (driveway, structure, or slope above)
- Retaining walls in a drainage or flood path
- Tiered walls where total retained height exceeds 4 feet
Required documents
- RequiredRetaining Wall / Helical Permit ApplicationSubmit via the Draper Online Services Portal (draper.onlama.com); Draper publishes a Retaining Walls submittal checklist on the Building Permits page
- RequiredEngineered Wall PlansStamped structural drawings from a licensed Utah PE
- RequiredGeotechnical ReportSoil bearing capacity and lateral pressure analysis per Draper Geotechnical Engineering Standards
- RequiredSite PlanWall location relative to property lines, structures, and utilities
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Retaining Wall / Helical Permit — Application Fee | $500.00 | Draper Consolidated Fee Schedule, Resolution 26-29, item 53 |
| Retaining Wall / Helical Permit — Permit Fee | $250.00 | Draper Consolidated Fee Schedule, Resolution 26-29, item 54 |
| Re-inspection Fee | $85.00 per inspection | Draper Consolidated Fee Schedule, Resolution 26-29, item 56 |
Accessory Dwelling Unit (ADU)
VerifiedRequired for construction of a secondary dwelling unit on a residential property in Draper, including basement apartments, detached cottages, and garage conversions. Draper has a dedicated ADU Permits page under Planning and Development. Building permit fees are ICC valuation-based.
Verified 2026-07-13 · Source
Requirements
- Property eligible for ADU use per Draper zoning — verify via Draper Planning Services Portal
- Compliance with Draper ADU regulations (size, setbacks, parking, etc.)
- Separate entrance from the primary dwelling
- 1-hour fire separation between units if attached or internal
Required documents
- RequiredBuilding Permit ApplicationSubmit via the Draper Online Services Portal (draper.onlama.com); confirm ADU eligibility with Draper Planning at (801) 576-6399 first
- RequiredConstruction PlansFull construction drawings including floor plan, elevations, sections, structural details; all files must be unlocked
- RequiredSite PlanProperty layout showing both units, setbacks, parking, and access
- RequiredGeotechnical Engineering ReportRequired by Draper for all new residential buildings before a permit application is accepted
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit — valuation-based | 100% of the ICC Schedule | Assessed on project valuation per Draper's building permit fee schedule, cited: Draper Consolidated Fee Schedule, Resolution 26-29 (Jul 2026), item 44 — re-fetched and confirmed live 2026-07-13. Draper's ADU Permit (a planning/compliance permit required under Resolution 21-47, separate from the construction building permit) has NO published flat fee in the Consolidated Fee Schedule (searched all Building Permit and Planning fee line-items — none reference ADU); construction work to create/modify an ADU (basement finish, addition, garage conversion, detached structure) is billed as the standard valuation-based Building Permit. This is the only ADU-related fee Draper publishes. Prior citation (Resolution 25-52, Oct 2025 PDF) went dead (404); superseded by Resolution 26-29 (Jul 2026) at the same media URL with identical fee figures. |
| Plan Review | 65% of the building permit fee | Draper Consolidated Fee Schedule, Resolution 26-29, item 45 |
| Re-inspection Fee | $85.00 per inspection | Draper Consolidated Fee Schedule, Resolution 26-29, item 56 |
Sources & verification
Verified against official sources. Last reviewed 2026-07-13.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Draper building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.