Draper building permits

Verified

Draper, Utah — as published 2026-07-16.

Verified 2026-07-13 · Source

Codes adopted

2024 International Building Code (IBC), including Appendices C and J — Utah Code § 15A-2-103(1)(a); effective 2026-07-01, superseded the 2021 edition2021 International Residential Code (IRC) — Utah Code § 15A-2-103(1)(b); unaffected by the 7/1/2026 statute revision, continues in force2024 International Plumbing Code (IPC) — Utah Code § 15A-2-103(1)(d); effective 2026-07-01, superseded the 2021 edition2024 International Mechanical Code (IMC) — Utah Code § 15A-2-103(1)(e); effective 2026-07-01, superseded the 2021 edition2024 International Fuel Gas Code (IFGC) — Utah Code § 15A-2-103(1)(f); effective 2026-07-01, superseded the 2021 edition2023 National Electrical Code (NEC) — Utah Code § 15A-2-103(1)(g); unaffected by the 7/1/2026 statute revision, continues in force2024 International Energy Conservation Code (IECC) — Utah Code § 15A-2-103(1)(h); effective 2026-07-01, superseded the 2021 edition2024 International Existing Building Code (IEBC) — Utah Code § 15A-2-103(1)(i); effective 2026-07-01, superseded the 2021 edition2024 International Swimming Pool and Spa Code (ISPSC), residential provisions — Utah Code § 15A-2-103(1)(n); effective 2026-07-01, superseded the 2021 editionNOTE: Effective July 1, 2026 (now in force) — 2024 editions of IBC, IPC, IMC, IFGC, IECC, IEBC, and ISPSC replaced the 2021 editions per Utah Code § 15A-2-103 (version effective 7/1/2026, superseded 1/1/2027; text independently re-verified live at le.utah.gov 2026-07-16). The 2021 IRC and 2023 NEC were unaffected by this revision and remain in force.

Permit types & fees

Residential Building Permit

Verified

Required for new residential construction, additions, structural alterations, and structural repairs in Draper. The fee is based on 100% of the ICC Building Valuation schedule. A $500 deposit is due at application and applied to the total fee.

Verified 2026-07-13 · Source

Requirements

  • New single-family or multi-family residential construction
  • Additions (any size requiring plan review)
  • Structural modifications — load-bearing wall removal, foundation alterations
  • Conversion of non-habitable space to habitable space
  • All work requiring plan review under Draper City building regulations

Required documents

  • RequiredBuilding Permit ApplicationSubmit via the Draper Online Services Portal (draper.onlama.com) — account required
  • RequiredConstruction PlansComplete drawings to scale — site plan, floor plans, elevations, sections, structural details. All digital files must be unlocked (not password-protected) to allow commenting by Draper City plan examiners
  • RequiredGeotechnical Engineering ReportRequired for all homes, townhouses, apartments, commercial buildings, and twin homes — Draper will not accept building permit applications unless a geotechnical report for the parcel has been reviewed, approved, and accepted by Draper City
  • RequiredEnergy Code Compliance DocumentationREScheck or equivalent documentation demonstrating compliance with the adopted IECC
  • OptionalEngineered Truss PlansSealed truss layouts for new construction with trusses

Fee schedule

Fee typeAmountNotes
Building Permit — valuation-based100% of the ICC Schedule (International Code Council Building Valuation Data table, as published in Building Safety Journal)Assessed on project valuation per Draper's building permit fee schedule, cited: Draper Consolidated Fee Schedule, Resolution 26-29 (Jul 2026), item 44 — re-fetched and confirmed live 2026-07-13 (100% of ICC Building Valuation Data schedule, $500 deposit due at application applied to total fee, refunds on canceled/changed permits capped at 60% of the building permit fee — text matches PDF verbatim; Resolution 25-52 (Oct 2025) PDF link is now dead (404), superseded by Resolution 26-29 (Jul 2026) at the same media URL with identical fee figures).
Plan Review65% of the building permit feeDraper Consolidated Fee Schedule, Resolution 26-29, item 45
Additional Plan Review (changes/alterations/revisions to plans)$85.00 per hourDraper Consolidated Fee Schedule, Resolution 26-29, item 46
Public Infrastructure Repair and Restoration Bond (new residential buildings)$5,000.00Draper Consolidated Fee Schedule, Resolution 26-29, item 62. Required for projects where public improvements are potentially affected.
Re-inspection Fee$85.00 per inspectionDraper Consolidated Fee Schedule, Resolution 26-29, item 56
After-Hours Inspection$85.00 per hour (2-hour minimum)Draper Consolidated Fee Schedule, Resolution 26-29, item 57

Electrical Permit

Verified

Required for electrical work in Draper including new circuits, panel upgrades, service changes, and new construction wiring. Governed by the 2023 National Electrical Code (NEC) as adopted statewide by Utah Code § 15A-2-103(1)(g). Draper charges a flat $150 electrical permit fee. EV charger/EVSE installation is electrical work and falls under this general Electrical Permit; the city's Consolidated Fee Schedule (Resolution 26-29) publishes no separate EV-charger-installation permit fee — the schedule's only distinct 'Electric Vehicle Charging Station' line item (Res 20-31, items 277-279) is an unrelated per-kilowatt-hour usage fee for charging at Draper's own public Level 2 charging stations, not an installation permit.

Verified 2026-07-13 · Source

Requirements

  • New electrical circuits or wiring installations
  • Electrical panel upgrades or replacements
  • Service entrance changes
  • Adding or relocating outlets, switches, or fixtures
  • Generator or solar panel electrical connections

Required documents

  • RequiredElectrical Permit ApplicationSubmit via the Draper Online Services Portal (draper.onlama.com) under 'Electrical' permit type
  • OptionalElectrical Plan / Single-Line DiagramPanel schedule and circuit layout — required for service upgrades and new construction
  • OptionalContractor LicenseValid Utah electrical contractor license (Utah DOPL) for work not performed by the homeowner

Fee schedule

Fee typeAmountNotes
Electrical Permit — flat fee$150.00Draper Consolidated Fee Schedule, Resolution 26-29, item 50. Flat fee applies to residential electrical permits.
Re-inspection Fee$85.00 per inspectionDraper Consolidated Fee Schedule, Resolution 26-29, item 56

Plumbing Permit

Verified

Required for plumbing installations, alterations, and repairs in Draper including water heaters, fixture additions, drain/waste/vent work, and gas line work. Governed by the 2024 IPC statewide, effective July 1, 2026 (superseded the 2021 edition). Draper charges a flat $150 plumbing permit fee.

Verified 2026-07-13 · Source

Requirements

  • New plumbing fixture installations (sinks, toilets, showers)
  • Water heater installation or replacement
  • Water line or sewer line replacement or extension
  • Gas line installation or modification
  • Backflow prevention device installation

Required documents

  • RequiredPlumbing Permit ApplicationSubmit via the Draper Online Services Portal (draper.onlama.com) under 'Plumbing' permit type
  • OptionalPlumbing PlanRequired for larger projects — isometric or plan showing fixture locations, pipe sizes, and drainage
  • OptionalContractor LicenseValid Utah plumbing contractor license (Utah DOPL) for work not performed by the homeowner

Fee schedule

Fee typeAmountNotes
Plumbing Permit — flat fee$150.00Draper Consolidated Fee Schedule, Resolution 26-29, item 48. Flat fee covers all residential plumbing permits including water heater replacements.
Re-inspection Fee$85.00 per inspectionDraper Consolidated Fee Schedule, Resolution 26-29, item 56

Mechanical / HVAC Permit

Verified

Required for heating, ventilation, and air conditioning installations, replacements, and ductwork modifications in Draper. Governed by the 2024 IMC statewide, effective July 1, 2026 (superseded the 2021 edition). Draper charges a flat $150 mechanical permit fee.

Verified 2026-07-13 · Source

Requirements

  • Furnace or boiler installation or replacement
  • Air conditioning system installation or replacement
  • Ductwork installation or major modification
  • Evaporative cooler installation
  • Gas fireplace or wood-burning stove installation

Required documents

  • RequiredMechanical Permit ApplicationSubmit via the Draper Online Services Portal (draper.onlama.com) under 'Mechanical' permit type
  • OptionalEquipment SpecificationsManufacturer data sheets for furnace, AC unit, heat pump, or evaporative cooler
  • OptionalMechanical PlanEquipment location, duct layout, and sizing calculations — required for larger projects

Fee schedule

Fee typeAmountNotes
Mechanical Permit — flat fee$150.00Draper Consolidated Fee Schedule, Resolution 26-29, item 49. Flat fee covers all residential mechanical permits including furnace and AC replacements.
Re-inspection Fee$85.00 per inspectionDraper Consolidated Fee Schedule, Resolution 26-29, item 56

Roofing Permit

Verified

Required for roof replacement and re-roofing in Draper. Listed as 'Re-Roof' in Draper's Online Services Portal. Fees are valuation-based under the ICC Schedule per Resolution 26-29.

Verified 2026-07-13 · Source

Requirements

  • Complete roof replacement (tear-off and re-roof)
  • Overlay of new roofing over existing (where code allows — max two layers)
  • Structural roof repairs or modifications
  • Changes to roofing material type

Required documents

  • RequiredRe-Roof Permit ApplicationSubmit via the Draper Online Services Portal (draper.onlama.com) under 'Re-Roof' permit type; provide scope of work, square footage, and material specifications
  • OptionalContractor LicenseValid Utah roofing contractor license (Utah DOPL) for work not performed by the homeowner

Fee schedule

Fee typeAmountNotes
Re-Roof Permit — valuation-based100% of the ICC Schedule (based on total value of roofing work)Assessed on project valuation per Draper's building permit fee schedule, cited: Draper Consolidated Fee Schedule, Resolution 26-29 (Jul 2026), item 44 — re-fetched and confirmed live 2026-07-13. Re-Roof is a distinct permit type in Draper's Online Services Portal but is billed as a Building Permit (100% ICC Schedule), confirmed against Draper's published Applications/Licenses/Permits type list. Prior citation (Resolution 25-52, Oct 2025 PDF) went dead (404); superseded by Resolution 26-29 (Jul 2026) at the same media URL with identical fee figures.
Plan Review65% of the building permit feeDraper Consolidated Fee Schedule, Resolution 26-29, item 45
Re-inspection Fee$85.00 per inspectionDraper Consolidated Fee Schedule, Resolution 26-29, item 56

Solar Panel Permit

Verified

Required for installation of rooftop or ground-mounted solar PV systems and energy storage systems (ESS) in Draper. Listed as 'Solar/PV/ESS' in Draper's permit portal. Draper charges a flat $600 residential solar review fee per Resolution 26-29.

Verified 2026-07-13 · Source

Requirements

  • Rooftop solar panel installation
  • Ground-mounted solar array installation
  • Battery/energy storage system (ESS) installation
  • Electrical service upgrade for solar interconnection

Required documents

  • RequiredSolar/PV/ESS Permit ApplicationSubmit via the Draper Online Services Portal (draper.onlama.com) under 'Solar/PV/ESS' permit type
  • RequiredSolar Site Plan / Roof PlanShowing panel placement, setbacks, and access pathways on the roof
  • RequiredElectrical Single-Line DiagramSystem wiring from panels to inverter to main panel and utility meter
  • RequiredStructural AnalysisRoof load calculation confirming the structure can support the panels
  • RequiredEquipment SpecificationsData sheets for panels, inverter, and racking system
  • OptionalInterconnection AgreementRocky Mountain Power utility approval for grid-tied systems

Fee schedule

Fee typeAmountNotes
Solar Panel Review — Residential$600.00Draper Consolidated Fee Schedule, Resolution 26-29, item 58. Flat fee for residential Solar/PV/ESS permit review.
Solar Panel Review — CommercialActual Cost (valuation-based)Draper Consolidated Fee Schedule, Resolution 26-29, item 59
Re-inspection Fee$85.00 per inspectionDraper Consolidated Fee Schedule, Resolution 26-29, item 56

Deck Permit

Verified

Required for new deck construction or structural modification of existing decks in Draper. Draper publishes a specific Deck submittal checklist (deck-2024.pdf). Fees are valuation-based under the ICC Schedule per Resolution 26-29.

Verified 2026-07-13 · Source

Requirements

  • New deck construction attached to or detached from the house
  • Decks higher than 30 inches above grade
  • Structural modifications to existing decks
  • Adding or replacing a deck ledger

Required documents

  • RequiredDeck Permit ApplicationSubmit via the Draper Online Services Portal (draper.onlama.com)
  • RequiredDeck Submittal Checklist and PlansDraper publishes a Deck submittal checklist (deck-2024.pdf) — framing plan, post/beam/joist details, footing details, ledger attachment method, and railing specifications
  • RequiredSite PlanShowing deck location, setbacks from property lines, and relationship to existing structure

Fee schedule

Fee typeAmountNotes
Deck Permit — valuation-based100% of the ICC Schedule (based on total value of deck work)Assessed on project valuation per Draper's building permit fee schedule, cited: Draper Consolidated Fee Schedule, Resolution 26-29 (Jul 2026), item 44 — re-fetched and confirmed live 2026-07-13. Decks are processed as a building permit (100% ICC Schedule); Draper's permit-type list does not carry a separate 'Deck' category, so decks fall under standard Building/New Building or Accessory Building permit types depending on attachment, per Draper's Applications/Licenses/Permits list. Prior citation (Resolution 25-52, Oct 2025 PDF) went dead (404); superseded by Resolution 26-29 (Jul 2026) at the same media URL with identical fee figures.
Plan Review65% of the building permit feeDraper Consolidated Fee Schedule, Resolution 26-29, item 45
Re-inspection Fee$85.00 per inspectionDraper Consolidated Fee Schedule, Resolution 26-29, item 56

Basement Finish Permit

Verified

Required for finishing or remodeling an unfinished basement in Draper. Draper publishes a specific Basements submittal checklist. Processed as a Remodel/Alteration permit; fees are ICC valuation-based.

Verified 2026-07-13 · Source

Requirements

  • Framing walls in an unfinished basement
  • Adding a bedroom (requires egress window per IRC)
  • Adding a bathroom (requires separate plumbing permit)
  • Electrical wiring for new rooms (requires separate electrical permit)
  • Any structural modifications

Required documents

  • RequiredBasement Finish Permit ApplicationSubmit via the Draper Online Services Portal (draper.onlama.com) as a Remodel/Alteration permit
  • RequiredBasement Submittal ChecklistDraper publishes a Basements checklist (basement-2023.pdf) — download from the Building Permits page before applying
  • RequiredFloor PlanLayout showing room sizes, egress windows, and door locations
  • RequiredElectrical PlanCircuit layout, panel capacity, smoke/CO detector locations

Fee schedule

Fee typeAmountNotes
Basement Finish Permit — valuation-based100% of the ICC Schedule (based on total value of work)Assessed on project valuation per Draper's building permit fee schedule, cited: Draper Consolidated Fee Schedule, Resolution 26-29 (Jul 2026), item 44 — re-fetched and confirmed live 2026-07-13. Basement finishes are processed under the 'Remodel/Alteration' permit type, confirmed as a listed category in Draper's Applications/Licenses/Permits type list; billed as a Building Permit (100% ICC Schedule). Prior citation (Resolution 25-52, Oct 2025 PDF) went dead (404); superseded by Resolution 26-29 (Jul 2026) at the same media URL with identical fee figures.
Plan Review65% of the building permit feeDraper Consolidated Fee Schedule, Resolution 26-29, item 45
Electrical Permit (if adding circuits)$150.00 flat feeDraper Consolidated Fee Schedule, Resolution 26-29, item 50. Separate electrical permit required for new circuits.
Plumbing Permit (if adding bathroom or fixtures)$150.00 flat feeDraper Consolidated Fee Schedule, Resolution 26-29, item 48. Separate plumbing permit required if adding bathroom or fixtures.
Re-inspection Fee$85.00 per inspectionDraper Consolidated Fee Schedule, Resolution 26-29, item 56

Demolition Permit

Verified

Required for partial or complete demolition of structures in Draper. A flat $150 fee applies per the Consolidated Fee Schedule (Resolution 26-29). Draper publishes a Demolition Request Plan Requirements checklist on the Building Permits page.

Verified 2026-07-13 · Source

Requirements

  • Complete demolition of any structure
  • Partial demolition involving structural elements
  • Removal of load-bearing walls
  • Demolition of structures with potential asbestos or lead paint (pre-1980 construction)

Required documents

  • RequiredDemolition Permit ApplicationSubmit via the Draper Online Services Portal (draper.onlama.com) under 'Demolition' permit type; include scope, structure details, and disposal plan. Draper publishes Demolition Request Plan Requirements on the Building Permits page.
  • OptionalAsbestos SurveyFederal NESHAP asbestos inspection required for structures that may contain asbestos-containing materials (generally structures built before approximately 1980)
  • RequiredUtility Disconnect ConfirmationProof that gas, electric, water, and sewer are disconnected prior to demolition

Fee schedule

Fee typeAmountNotes
Demolition Permit$150.00Draper Consolidated Fee Schedule, Resolution 26-29, item 64
Re-inspection Fee$85.00 per inspectionDraper Consolidated Fee Schedule, Resolution 26-29, item 56

Water Heater Permit

Verified

Required for water heater installation, replacement, or conversion in Draper. Processed as a plumbing permit in Draper's system. The flat $150 plumbing permit fee applies per Resolution 26-29.

Verified 2026-07-13 · Source

Requirements

  • Water heater replacement (including like-for-like swaps)
  • New water heater installation
  • Conversion from tank to tankless water heater
  • Gas line modification for water heater

Required documents

  • RequiredPlumbing Permit ApplicationSubmit via the Draper Online Services Portal (draper.onlama.com) under 'Plumbing' permit type
  • OptionalContractor LicenseValid Utah plumbing contractor license (Utah DOPL) for work not performed by the homeowner

Fee schedule

Fee typeAmountNotes
Water Heater Permit (Plumbing Permit flat fee)$150.00Draper Consolidated Fee Schedule, Resolution 26-29, item 48. Water heater replacements are processed as plumbing permits.
Re-inspection Fee$85.00 per inspectionDraper Consolidated Fee Schedule, Resolution 26-29, item 56

Retaining Wall Permit

Verified

Required for retaining walls over 4 feet in height in Draper. Draper has a specific Retaining Wall / Helical Permit with a $500 application fee and $250 permit fee per Resolution 26-29. Engineered plans and a geotechnical report are required. Draper publishes a Retaining Walls submittal checklist.

Verified 2026-07-13 · Source

Requirements

  • Retaining walls over 4 feet in total height (measured from bottom of footing to top of wall)
  • Any retaining wall supporting a surcharge (driveway, structure, or slope above)
  • Retaining walls in a drainage or flood path
  • Tiered walls where total retained height exceeds 4 feet

Required documents

  • RequiredRetaining Wall / Helical Permit ApplicationSubmit via the Draper Online Services Portal (draper.onlama.com); Draper publishes a Retaining Walls submittal checklist on the Building Permits page
  • RequiredEngineered Wall PlansStamped structural drawings from a licensed Utah PE
  • RequiredGeotechnical ReportSoil bearing capacity and lateral pressure analysis per Draper Geotechnical Engineering Standards
  • RequiredSite PlanWall location relative to property lines, structures, and utilities

Fee schedule

Fee typeAmountNotes
Retaining Wall / Helical Permit — Application Fee$500.00Draper Consolidated Fee Schedule, Resolution 26-29, item 53
Retaining Wall / Helical Permit — Permit Fee$250.00Draper Consolidated Fee Schedule, Resolution 26-29, item 54
Re-inspection Fee$85.00 per inspectionDraper Consolidated Fee Schedule, Resolution 26-29, item 56

Accessory Dwelling Unit (ADU)

Verified

Required for construction of a secondary dwelling unit on a residential property in Draper, including basement apartments, detached cottages, and garage conversions. Draper has a dedicated ADU Permits page under Planning and Development. Building permit fees are ICC valuation-based.

Verified 2026-07-13 · Source

Requirements

  • Property eligible for ADU use per Draper zoning — verify via Draper Planning Services Portal
  • Compliance with Draper ADU regulations (size, setbacks, parking, etc.)
  • Separate entrance from the primary dwelling
  • 1-hour fire separation between units if attached or internal

Required documents

  • RequiredBuilding Permit ApplicationSubmit via the Draper Online Services Portal (draper.onlama.com); confirm ADU eligibility with Draper Planning at (801) 576-6399 first
  • RequiredConstruction PlansFull construction drawings including floor plan, elevations, sections, structural details; all files must be unlocked
  • RequiredSite PlanProperty layout showing both units, setbacks, parking, and access
  • RequiredGeotechnical Engineering ReportRequired by Draper for all new residential buildings before a permit application is accepted

Fee schedule

Fee typeAmountNotes
Building Permit — valuation-based100% of the ICC ScheduleAssessed on project valuation per Draper's building permit fee schedule, cited: Draper Consolidated Fee Schedule, Resolution 26-29 (Jul 2026), item 44 — re-fetched and confirmed live 2026-07-13. Draper's ADU Permit (a planning/compliance permit required under Resolution 21-47, separate from the construction building permit) has NO published flat fee in the Consolidated Fee Schedule (searched all Building Permit and Planning fee line-items — none reference ADU); construction work to create/modify an ADU (basement finish, addition, garage conversion, detached structure) is billed as the standard valuation-based Building Permit. This is the only ADU-related fee Draper publishes. Prior citation (Resolution 25-52, Oct 2025 PDF) went dead (404); superseded by Resolution 26-29 (Jul 2026) at the same media URL with identical fee figures.
Plan Review65% of the building permit feeDraper Consolidated Fee Schedule, Resolution 26-29, item 45
Re-inspection Fee$85.00 per inspectionDraper Consolidated Fee Schedule, Resolution 26-29, item 56

Commercial Building Permit

Verified

Required for new commercial building construction, additions, and structural alterations in Draper. Draper does not use a separate commercial fee table — the same "Building Permit" fee formula (100% of the ICC Building Valuation Data schedule) applies to both residential and commercial structures. A $500 deposit is due at application, applied to the total fee. Commercial projects also require a geotechnical report and are subject to commercial-specific impact fees and fire sprinkler/alarm plan review fees not charged on residential permits.

Verified 2026-07-19 · Source

Requirements

  • New commercial building construction, addition, or structural alteration
  • Complete architectural and structural drawings, unlocked (not password-protected) digital files
  • Geotechnical engineering report reviewed, approved, and accepted by Draper City — required before the application will be accepted
  • Energy code compliance documentation (COMcheck or equivalent) for the adopted commercial IECC
  • Fire sprinkler and/or fire alarm system plans where required by the adopted IBC/IFC

Required documents

  • RequiredBuilding Permit ApplicationSubmit via the Draper Online Services Portal (draper.onlama.com) — account required
  • RequiredConstruction PlansComplete drawings to scale — site plan, floor plans, elevations, sections, structural details. All digital files must be unlocked to allow commenting by Draper City plan examiners
  • RequiredGeotechnical Engineering ReportRequired for all commercial buildings — Draper will not accept building permit applications unless a geotechnical report for the parcel has been reviewed, approved, and accepted by Draper City
  • RequiredEnergy Code Compliance DocumentationCOMcheck or equivalent documentation demonstrating compliance with the adopted commercial IECC
  • OptionalFire Sprinkler / Fire Alarm System PlansRequired where the adopted IBC/IFC mandates fire suppression or alarm systems in new commercial construction; reviewed and fee'd separately by the Fire Department

Fee schedule

Fee typeAmountNotes
Building Permit — valuation-based100% of the ICC Schedule (International Code Council Building Valuation Data table, as published in Building Safety Journal)Draper Consolidated Fee Schedule, Resolution 26-29 (Jul 2026), item 44 — same formula applies to commercial as residential; no separate commercial table exists. $500 deposit due at application, applied to total fee; refunds on canceled/changed permits capped at 60% of the building permit fee.
Plan Review65% of the building permit feeDraper Consolidated Fee Schedule, Resolution 26-29, item 45
Additional Plan Review (changes/alterations/revisions to plans)$85.00 per hourDraper Consolidated Fee Schedule, Resolution 26-29, item 46
Commercial Fire Sprinkler System Plan Review (New System Install) — under 100 heads$125.00 (includes 3 inspections)Draper Consolidated Fee Schedule, Resolution 26-29, items 171-175 — scales to $175 (100-199 heads), $225 (200-299 heads), $275 (>300 heads), plus $0.50 per sprinkler head installed
Fire Alarm Systems Plan Review and Inspection — New System$150.00Draper Consolidated Fee Schedule, Resolution 26-29, item 188
Fire Impact Fee — Commercial (per 1,000 sq ft gross lease area)$97.00Draper Consolidated Fee Schedule, Resolution 26-29, item 240 — New Residential and Commercial Development impact fee, paid when building permit is issued
Police Facilities Impact Fee — Commercial (per 1,000 sq ft gross lease area)$130.00Draper Consolidated Fee Schedule, Resolution 26-29, item 251
Transportation Facilities Impact Fee — Commercial (per 1,000 sq ft gross area lease)$3,040.00Draper Consolidated Fee Schedule, Resolution 26-29, item 257
Public Infrastructure Repair and Restoration Bond (new commercial buildings)$5,000.00Draper Consolidated Fee Schedule, Resolution 26-29, item 62. Required for projects where public improvements are potentially affected.
Geologic Hazard Report Review — Commercial Development, Non-Geo Hazard Area$1,000.00Draper Consolidated Fee Schedule, Resolution 26-29, item 69 (item 68: $10,000.00 if In Geo Hazard Area). Applicant pays actual direct costs deducted from this deposit; excess is refunded.
Re-inspection Fee$85.00 per inspectionDraper Consolidated Fee Schedule, Resolution 26-29, item 56

Commercial Tenant Improvement / Tenant Finish Permit

Verified

Required for tenant improvement (tenant finish) work in existing commercial buildings in Draper — interior build-outs, remodels, and finish work for a new or changing tenant space. Draper does not have a separate tenant-improvement fee table; the permit is billed under the same "Building Permit" formula (100% of the ICC Building Valuation Data schedule) as new commercial construction, based on the value of the finish work. Fire sprinkler and alarm system plan review fees are lower for remodel/tenant-finish work than for new system installs.

Verified 2026-07-19 · Source

Requirements

  • Interior build-out, remodel, or finish work in an existing commercial tenant space
  • Floor plan showing existing and proposed layout, occupancy classification, and egress
  • Mechanical, electrical, and plumbing plans for the scope of work, unlocked (not password-protected) digital files
  • Fire sprinkler and/or fire alarm modification plans where the scope affects existing systems

Required documents

  • RequiredBuilding Permit ApplicationSubmit via the Draper Online Services Portal (draper.onlama.com) — account required
  • RequiredConstruction PlansFloor plan showing scope of work, occupancy classification, and egress; structural details if load-bearing elements are affected
  • OptionalFire Sprinkler / Fire Alarm Modification PlansRequired where the tenant improvement scope affects existing fire suppression or alarm systems; reviewed and fee'd separately by the Fire Department at the lower remodel/tenant-finish rate

Fee schedule

Fee typeAmountNotes
Building Permit — valuation-based100% of the ICC Schedule (International Code Council Building Valuation Data table, as published in Building Safety Journal)Draper Consolidated Fee Schedule, Resolution 26-29 (Jul 2026), item 44 — assessed on the value of the tenant improvement work; no separate tenant-improvement table exists. $500 deposit due at application, applied to total fee.
Plan Review65% of the building permit feeDraper Consolidated Fee Schedule, Resolution 26-29, item 45
Additional Plan Review (changes/alterations/revisions to plans)$85.00 per hourDraper Consolidated Fee Schedule, Resolution 26-29, item 46
Commercial Fire Sprinkler System Plan Review (Remodel or Tenant Finish) — under 20 heads$100.00 (includes 3 inspections)Draper Consolidated Fee Schedule, Resolution 26-29, items 179-182 — scales to $125 (21-50 heads), $150 (>50 heads), plus $0.50 per sprinkler head installed. Lower than the new-system-install rate.
Fire Alarm Systems Plan Review and Inspection — Remodel or Tenant Finish$100.00Draper Consolidated Fee Schedule, Resolution 26-29, item 189 — lower than the $150 new-system rate
Re-inspection Fee$85.00 per inspectionDraper Consolidated Fee Schedule, Resolution 26-29, item 56

Sign Permit

Verified

Required for nearly every permanent or temporary sign erected, installed, or used in Draper — wall signs, freestanding/monument signs, temporary banners, and sign face changes — under City Code chapter 9-26 (Signs). A sign permit is separate and distinct from any building permit that may also be required. Fees are set by the Consolidated Fee Schedule (Resolution 26-29): permanent signs are $100.00 plus $2.50 per square foot over 32 square feet.

Verified 2026-07-20 · Source

Requirements

  • Every sign in the city requires a sign permit prior to erection, installation, or use, unless specifically exempted under 9-26-100 (City Code § 9-26-050.C.1)
  • Development projects with signage must first secure a sign allowance or master sign program approval as part of site plan approval — this approval does not itself constitute a sign permit; a separate sign permit application is still required before installation (§ 9-26-050.A)
  • A specific occupancy/tenant with an existing illegal or nonconforming sign must correct or remove it before a new sign permit will be issued for that space (§ 9-26-050.C.2)
  • Temporary signs displayed more than 29 days (e.g., development signs) require a sign permit at the same $100 + $2.50/sq ft over 32 sq ft rate as permanent signs; temporary signs displayed fewer than 29 days require a permit at a flat $25.00
  • Signs exempt from a permit include: on-site window signs (≤25% of window area, ground floor only), up to two A-frame signs (≤3'×3', not illuminated), one portable sign (≤2'×2') meeting setback rules, real estate signs meeting size caps, political signs, holiday decorations (displayed ≤45 days before/14 days after the holiday), and official/traffic/ADA signage (City Code § 9-26-100)

Required documents

  • RequiredSign Permit ApplicationSubmitted to the Community Development Department on a City-prescribed form; may cover all signs on a property with approved site plan/plat or an approved master sign program
  • OptionalPlot Plan (monument/freestanding signs)Two copies, drawn to scale, showing sign distance to buildings, dimensioned property lines, and setbacks from rights-of-way, intersections, easements, and driveways
  • RequiredElevation DrawingsTwo fully dimensioned, scaled elevation drawings showing height, area, color, sign design, and illumination type as the sign will appear from the street. For monument/freestanding signs, elevations are required for all four sides
  • RequiredConstruction Detail DrawingsFor monument/freestanding and wall signs: sign maker name, electrical plan, foundation scheme (freestanding), attachment method to wall/building (wall signs), and name of the licensed installing contractor
  • RequiredOwner/Lessee Written ConsentWritten consent of the owner, lessee, agent, or trustee having charge of the building or property where the sign will be located, plus their address and phone number
  • RequiredDraper City Business LicenseProof of application for, or issuance of, a current Draper City business license
  • RequiredContractor InformationLicense number, phone number, and address of the general or electrical contractor who will install the sign

Fee schedule

Fee typeAmountNotes
Permanent Sign Permit$100.00 plus $2.50 per sq. ft. over 32 sq. ft.Draper Consolidated Fee Schedule, Resolution 26-29, item 420 (Res 01-05) — fetched and confirmed live 2026-07-20 from the same Resolution 26-29 PDF cited elsewhere in this file.
Temporary Sign — less than 29 days$25.00Draper Consolidated Fee Schedule, Resolution 26-29, item 421
Temporary Sign — more than 29 days (e.g., development signs)$100.00 plus $2.50 per sq. ft. over 32 sq. ft.Draper Consolidated Fee Schedule, Resolution 26-29, item 422
Grand Opening or Going Out of Business Sign (per business)$30.00Draper Consolidated Fee Schedule, Resolution 26-29, item 423 (Res 01-05)
Signage Text Change$25.00Draper Consolidated Fee Schedule, Resolution 26-29, item 425 (Res 18-70)
Unpermitted Sign Investigation FeeEqual to and in addition to the applicable sign permit feeDraper Consolidated Fee Schedule, Resolution 26-29, item 424 — applies when a sign requiring a permit is installed without one and the violation is not corrected within 72 hours of written notice

EV Charger / EVSE Permit

Verified

Draper publishes no separate EV-charger-installation permit or fee. Installing an EV charger (EVSE) is electrical work and is processed under the city's flat $150.00 Electrical Permit, per the Draper Consolidated Fee Schedule (Resolution 26-29, item 50). The schedule's only distinct 'Electric Vehicle Charging Station' line item (Res 20-31, items 277-279) is an unrelated per-kilowatt-hour usage fee for charging at Draper's own public Level 2 charging stations — it is not an installation permit fee and should not be confused with the permit process for installing a private charger.

Verified 2026-07-20 · Source

Requirements

  • Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property in Draper
  • New dedicated electrical circuit and/or panel capacity to serve the charger, governed by the 2023 NEC (Utah Code § 15A-2-103(1)(g))
  • Work performed by a Utah State Licensed Electrical Contractor, unless performed by the homeowner on their own primary residence

Required documents

  • RequiredElectrical Permit ApplicationSubmit via the Draper Online Services Portal (draper.onlama.com) under the 'Electrical' permit type.
  • OptionalElectrical Plan / Single-Line DiagramPanel schedule and circuit layout for the new EVSE circuit — required for service upgrades or where panel capacity is a factor.

Fee schedule

Fee typeAmountNotes
Electrical Permit — flat fee$150.00Draper Consolidated Fee Schedule, Resolution 26-29 (July 2026), item 50. EV charger/EVSE installation uses this same flat electrical permit fee; there is no EV-specific line item.
Re-inspection Fee$85.00 per inspectionDraper Consolidated Fee Schedule, Resolution 26-29, item 56.

Fire Sprinkler Permit

Verified

Required for installation, alteration, or repair of an automatic fire sprinkler system in Draper. Draper has operated its own city Fire Department since exiting Unified Fire Authority on July 1, 2017 (Draper City Council voted 4-1 to withdraw); the Draper Fire Marshal's Office handles fire sprinkler plan review, permitting, and inspection directly, billed through the same Consolidated Fee Schedule (Resolution 26-29) that covers the city's other permits. Residential systems use a flat inspection fee; commercial new-system installs and commercial remodel/tenant-finish work are billed on separate head-count tiers, with the remodel/tenant-finish tiers priced lower than new-system installs.

Verified 2026-07-21 · Source

Requirements

  • Installation, alteration, or repair of an automatic fire sprinkler system in a residential or commercial building
  • New commercial systems billed by sprinkler head count (under 100, 100-199, 200-299, or over 300 heads) plus a per-head charge
  • Commercial remodel or tenant-finish sprinkler work billed on a separate, lower head-count fee tier (under 20, 21-50, or over 50 heads) plus a per-head charge
  • Residential fire sprinkler systems billed a flat inspection fee that includes two inspections

Required documents

  • RequiredFire Sprinkler Permit / Plan Review ApplicationSubmitted to the Draper Fire Marshal's Office for plan examination and acceptance testing prior to installation
  • RequiredFire Sprinkler System PlansHydraulic calculations, riser diagrams, and sprinkler head layout for the system as designed

Fee schedule

Fee typeAmountNotes
Residential Fire Sprinkler System Inspection (2 inspections included)$100.00Draper Consolidated Fee Schedule, Resolution 26-29, item 166 — fetched and confirmed live 2026-07-21.
Residential Fire Sprinkler — Re-Inspection$75.00Draper Consolidated Fee Schedule, Resolution 26-29, item 167.
Residential Fire Sprinkler — 2nd Re-Inspection$150.00Draper Consolidated Fee Schedule, Resolution 26-29, item 168.
Expedited Fire Plans ReviewDouble the permit feeDraper Consolidated Fee Schedule, Resolution 26-29, item 169.
Commercial Fire Sprinkler System Plan Review (New System Install) and Inspections (3 included) — under 100 heads$125.00Draper Consolidated Fee Schedule, Resolution 26-29, item 171 — scales to $175.00 (100-199 heads, item 172), $225.00 (200-299 heads, item 173), $275.00 (over 300 heads, item 174), plus $0.50 per sprinkler head installed (item 175).
Commercial Fire Sprinkler System Re-Inspections (New System) — 2nd / 3rd / 4th$75.00 / $150.00 / $200.00Draper Consolidated Fee Schedule, Resolution 26-29, items 176-178.
Commercial Fire Sprinkler System Plan Review (Remodel or Tenant Finish) and Inspections (3 included) — under 20 heads$100.00Draper Consolidated Fee Schedule, Resolution 26-29, item 179 — scales to $125.00 (21-50 heads, item 180), $150.00 (over 50 heads, item 181), plus $0.50 per sprinkler head installed (item 182). Lower than the New System Install rate.
After-Hours Fire Inspection$75.00 per hour (2-hour minimum)Draper Consolidated Fee Schedule, Resolution 26-29, item 170.

Fire Alarm Permit

Verified

Required for installation or alteration of a fire alarm system in Draper. The Draper City Fire Department's Fire Marshal's Office (Draper has operated its own fire department since exiting Unified Fire Authority on July 1, 2017) handles fire alarm plan review, permitting, and inspection directly, billed under the Consolidated Fee Schedule (Resolution 26-29). A new-system fire alarm plan review and inspection is billed at a higher rate than remodel/tenant-finish alarm work; these figures are distinct from the fee schedule's separate 'False Alarm' penalty fees, which apply only to nuisance/false-alarm dispatch responses and are not a permit or installation fee.

Verified 2026-07-21 · Source

Requirements

  • Installation or alteration of a fire alarm system in a residential or commercial building
  • New fire alarm systems billed at the higher of two plan review/inspection rates
  • Remodel or tenant-finish fire alarm work billed at a lower plan review/inspection rate than a new system install

Required documents

  • RequiredFire Alarm Permit / Plan Review ApplicationSubmitted to the Draper Fire Marshal's Office for plan examination and acceptance testing prior to installation
  • RequiredFire Alarm System PlansDevice layout, panel location, and sequence of operations for the system as designed

Fee schedule

Fee typeAmountNotes
Fire Alarm Systems Plan Review and Inspection — New System$150.00Draper Consolidated Fee Schedule, Resolution 26-29, item 188 — fetched and confirmed live 2026-07-21.
Fire Alarm Systems Plan Review and Inspection — Remodel or Tenant Finish$100.00Draper Consolidated Fee Schedule, Resolution 26-29, item 189. Lower than the New System rate.
Expedited Fire Plans ReviewDouble the permit feeDraper Consolidated Fee Schedule, Resolution 26-29, item 169.
After-Hours Fire Inspection$75.00 per hour (2-hour minimum)Draper Consolidated Fee Schedule, Resolution 26-29, item 170.

Change of Use / Certificate of Occupancy

Verified

Draper does not publish a standalone, separately-fee'd 'Change of Use Permit' product. Instead, City Code Title 10, Chapter 5 requires a Certificate of Occupancy before any building or structure is used or occupied, and expressly extends that requirement to 'a change in the existing occupancy classification of a building or structure or portion thereof' (Draper City Code § 10-5-010). The Certificate of Occupancy itself carries no distinct line item in the Consolidated Fee Schedule (Resolution 26-29) — the full fee schedule (items 1-540) was checked directly and contains no 'Certificate of Occupancy' or 'Change of Use' fee. Where the change of occupancy requires construction (e.g., converting retail space to a restaurant), that work is billed under this file's commercial-building-permit or commercial-tenant-improvement-permit entries, whose fees already appear there and are not duplicated here.

Verified 2026-07-21 · Source

Requirements

  • No building or structure may be used or occupied, in whole or in part, nor may a change in existing occupancy classification be made, until the City has issued a Certificate of Occupancy (Draper City Code § 10-5-010)
  • No Certificate of Occupancy will be issued until all required public improvements (curbs, gutters, sidewalks, water meter boxes, street paving, sewage/storm/flood/fire control facilities, etc.) are completed and operable, or repaired if damaged (§ 10-5-020)
  • The Building Official, with approval from the Community Development Director, issues the Certificate of Occupancy only after inspection finds no violation of the construction codes or other applicable law (§ 10-5-030)
  • A Notice of Disapproval is issued if the building or structure does not comply (§ 10-5-040)
  • A Temporary Certificate of Occupancy may be issued for incomplete work only if it would not create a substantial hazard or violate code or state law (§ 10-5-050)

Required documents

  • RequiredCertificate of Occupancy RequestRequested through the Draper Building Division, typically as the closing step of an associated building/remodel/tenant-improvement permit, or standalone when only the occupancy classification is changing without construction
  • OptionalBuilding Permit Application (if construction accompanies the change of use)Required where the new occupancy needs construction to comply with code — see this file's commercial-building-permit or commercial-tenant-improvement-permit entries for that permit's own fees and documents

Fee schedule

Fee typeAmountNotes
Certificate of Occupancy / Change of Occupancy ClassificationNo distinct fee publishedChecked the full Draper Consolidated Fee Schedule (Resolution 26-29, July 2026, items 1-540) directly — no 'Certificate of Occupancy' or 'Change of Use' line item exists. Draper City Code §§ 10-5-010 through 10-5-050 impose the Certificate of Occupancy requirement (including for occupancy-classification changes) but specify no fee. Where construction accompanies the change of use, the standard valuation-based Building Permit fee (100% of the ICC Schedule, item 44) plus 65% plan review (item 45) applies instead — see the commercial-building-permit / commercial-tenant-improvement-permit entries in this file.
Zoning Verification Letter (optional, related — confirms zoning/use compliance)$50.00Draper Consolidated Fee Schedule, Resolution 26-29, item 409, under Appeals and Variance Hearing Officer fees. Not a Certificate of Occupancy fee itself, but the closest published mechanism for a standalone written confirmation of a property's zoning/use compliance.

Sources & verification

Verified against official sources. Last reviewed 2026-07-13.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Draper building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-06-30)View current record →All versions →