This is PermitBase’s published record for Murray as of 2026-07-20. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.
Murray building permits
VerifiedMurray, Utah — as published 2026-07-20.
Verified 2026-07-04 · Source
Codes adopted
Permit types & fees
Residential Building Permit
VerifiedRequired for new single-family and two-family residential construction and any work regulated by the adopted 2021 IRC / 2024 IBC. Murray's fee schedule uses its own valuation-based table (distinct from Provo's 1997 UBC chart) with a February 2026 ICC Building Valuation Data square-foot construction cost table.
Verified 2026-07-04 · Source
Requirements
- New single-family or two-family residential construction
- Any work regulated by the adopted 2021 IRC
- Structural modifications regulated by the adopted 2024 IBC / 2021 IRC
- Site plan drawn to scale showing actual lot dimensions, size and location of existing buildings, required per Murray City Code § 17.04.100
Required documents
- RequiredSite PlanDrawn to scale, showing actual dimensions of the lot and size/location of existing buildings, per Murray City Code § 17.04.100 (Building Permits; Site Plan Required).
- RequiredSingle Family Dwelling Plan Submittal ChecklistMurray City's published checklist for new single-family dwelling plan submittals (Plan Submittals page, murray.utah.gov/171/Plan-Submittals).
- RequiredBuilding Permit Application (eProcess 360)Submitted online at murray.ut.eprocess360.com. Permit numbers issued through this new system begin with the letter 'E'.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee — valuation-based (Murray City table, effective 07/01/2026) | $1.00–$500.00: $100.00 flat. $501.00–$2,000.00: $100.00 + $3.05 per additional $100 (or fraction). $2,001.00–$25,000.00: $150.00 + $14.00 per additional $1,000 (or fraction). $25,001.00–$50,000.00: $391.75 + $10.10 per additional $1,000. $50,001.00–$100,000.00: $643.75 + $7.00 per additional $1,000. $100,001.00–$500,000.00: $993.75 + $5.60 per additional $1,000. $500,001.00–$1,000,000.00: $3,233.75 + $4.75 per additional $1,000. $1,000,001.00 and up: $5,608.75 + $3.65 per additional $1,000. | Murray City 'Building Permit Fees, Commercial/Residential' table (dated 06.22.26, part of the official Building Permit Fees packet effective July 1, 2026), retrieved from… Show full citationHideMurray City 'Building Permit Fees, Commercial/Residential' table (dated 06.22.26, part of the official Building Permit Fees packet effective July 1, 2026), retrieved from murray.utah.gov/DocumentCenter/View/19435/Building-Fee-Sheet-eff-07012026. Valuation determined per attached ICC Building Valuation Data, February 2026, using the Square Foot Construction Costs table (e.g., R-3 Residential one- and two-family, Type VB construction: $175.92/sq ft; unfinished basements Group R-3: $31.50/sq ft per the same table's footnote d). |
| Re-inspection Fee | $100.00 per hour | Murray City Building Permit Fees packet, 'Other Inspections and Fees' item 2: 'Re-inspection fees assessed under provisions of Section 305.8 — $100.00 Per Hour.' |
| Additional Plan Review (changes/additions/revisions) | $80.00 per hour (half-hour minimum) | Murray City Building Permit Fees packet, 'Other Inspections and Fees' item 4. |
| Inspections Outside Normal Business Hours | $100.00 per hour (2-hour minimum) | Murray City Building Permit Fees packet, 'Other Inspections and Fees' item 1. |
Residential Addition / Remodel Permit (incl. Basement Finish)
VerifiedRequired for residential additions, remodels, and basement finishes in Murray. The official fee sheet lists a distinct discounted rate for Basement Finish: valuation-based fee plus a 50% plan review surcharge (lower than the 65% commercial/general residential plan-review rate).
Verified 2026-07-04 · Source
Requirements
- Additions to existing one- and two-family residential structures
- Basement finish work (framing, MEP) in an existing home
- Structural remodel work regulated by the adopted 2021 IRC
- Site plan required per Murray City Code § 17.04.100
Required documents
- RequiredResidential Remodel / Basement Finish Plan Submittal ChecklistMurray City publishes separate checklists for 'Residential Remodel' and 'Basement Finish' project types on its Plan Submittals page (murray.utah.gov/171/Plan-Submittals).
- RequiredBuilding Permit Application (eProcess 360)Submitted online at murray.ut.eprocess360.com.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Basement Finish Fee | Based on Valuation (BOV) + 50% Plan Review Fee (residential); not applicable to commercial. | Murray City Building Permit Fees table, effective 07/01/2026: 'Basement Finish — Residential: **BOV + *PRF 50%; Show full citationHideMurray City Building Permit Fees table, effective 07/01/2026: 'Basement Finish — Residential: **BOV + *PRF 50%; Commercial: N/A.' (PRF = Plan Review Fee; BOV = Based on Valuation, using ICC Building Valuation Data Feb 2026 — SFD New Finished Basement $43.33/sq ft, SFD New Unfinished Basement $31.50/sq ft, SFD Existing Finished Basement $20.78/sq ft, SFD Addition to Existing $175.92/sq ft per the table's 'Additions to this Table' section). |
Electrical Permit
VerifiedRequired for electrical work in Murray, including service upgrades. Any change to service within the Murray City Power service area requires separate Murray Power approval in addition to the city building permit.
Verified 2026-07-04 · Source
Requirements
- New electrical circuits, wiring installations, or service upgrades
- Electrical panel or service entrance changes — requires Murray City Power approval if within the Murray Power service area
- Relocating an existing electrical service (requires a site map of the relocation)
- Replacing sub-panels
Required documents
- RequiredMurray City Electrical Permit QuestionnaireOfficial form (murray.utah.gov/DocumentCenter/View/14619) capturing existing vs. upgraded amperage (60/100/125/150/200 amp), whether the service is being relocated, whether sub-panels are being replaced, and the grounding method used.
- OptionalRequest for Electrical Service Information (Murray City Power)Required for any new construction or change to existing power service within the Murray City Power service area. Submitted to Murray City Power (153 West 4800 South, phone 801-264-2730 / fax 801-264-2731), detailing building size, electrical loads (HVAC, water heating, lighting, etc.), desired delivery voltage, panel size, and motor-start calculations for motors over 25 HP.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Electrical / Service Upgrade Fee (residential) | $100 | Murray City Building Permit Fees table, effective 07/01/2026: 'Electrical/Service Upgrade — Residential: $100.' |
Plumbing Permit
VerifiedRequired for plumbing installations and alterations in Murray. Murray's fee sheet lists a flat $100 residential plumbing fee, distinct from Provo's per-fixture structure.
Verified 2026-07-04 · Source
Requirements
- New plumbing fixture installations, standalone on an existing structure
- Water heater installation or replacement
- Water line, sewer line, or gas line installation or modification
Required documents
- RequiredBuilding Permit Application (eProcess 360)Submitted online at murray.ut.eprocess360.com.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Plumbing Fee (residential) | $100 | Murray City Building Permit Fees table, effective 07/01/2026: 'Plumbing — Residential: $100.' |
Mechanical / HVAC Permit
VerifiedRequired for HVAC installations, replacements, and ductwork modifications in Murray. Flat $100 residential fee per the official fee sheet.
Verified 2026-07-04 · Source
Requirements
- Furnace, boiler, or air conditioning installation or replacement, standalone on an existing structure
- Ductwork installation or major modification
Required documents
- RequiredBuilding Permit Application (eProcess 360)Submitted online at murray.ut.eprocess360.com.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Mechanical Fee (residential) | $100 | Murray City Building Permit Fees table, effective 07/01/2026: 'Mechanical — Residential: $100.' |
Roofing / Re-Roof Permit
VerifiedRequired for roof replacement and re-roofing in Murray. Murray publishes a distinct flat residential re-roof fee (separate from its general valuation-based building permit fee), with an added charge if new sheathing is installed.
Verified 2026-07-04 · Source
Requirements
- Complete roof replacement (tear-off and re-roof)
- Re-roof involving new sheathing (additional fee applies)
- Murray City Re-Roof Questionnaire required for plan submittal
Required documents
- RequiredRe-Roof QuestionnaireMurray City's published checklist for re-roof plan submittals, listed on the Plan Submittals page (murray.utah.gov/171/Plan-Submittals).
- RequiredBuilding Permit Application (eProcess 360)Submitted online at murray.ut.eprocess360.com.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| ReRoof Fee (residential) | $200 flat; add $100 if sheathing is being replaced | Murray City Building Permit Fees table, effective 07/01/2026: 'ReRoof — Residential: $200' with a listed addition 'W/ Sheathing Add: $100' (residential column). |
| ReRoof Fee (commercial) | Based on Valuation (BOV) + 10% Plan Review Fee | Murray City Building Permit Fees table, effective 07/01/2026: 'ReRoof — Commercial: **BOV + 10% *PRF.' |
Solar Panel (PV) Permit
VerifiedRequired for residential rooftop solar photovoltaic installations in Murray. Murray City Power (the municipal electric utility) requires a separate Net Metering Interconnection & Service Agreement in addition to the city building permit — this is a two-track process fully documented in Murray's own Residential Solar Panel Plan Submittal Requirements (rev. 09/24/2025) and Murray City Power Net Metering Checklist.
Verified 2026-07-19 · Source
Requirements
- Murray Power approval required — contact netmetering@murray.utah.gov for the Net Metering Interconnection & Service Agreement
- Building permit application via eProcess 360, including project valuation and contractor/subcontractor information
- Site (plot) plan showing north arrow, home location, and all PV components grouped in an area not exceeding 6 feet (main meter, production meter, AC disconnect, module array(s), inverter(s))
- One-line diagram showing PV system type, meters, disconnect and inverter ratings, module layout/wiring, maximum system output (system output capped at 10 kW per Murray's checklist), and grounding
- Module/inverter/combiner box manufacturer specifications; engineer of record confirmation that the roof can support the added solar array load
- Safety and warning labels: engraved, mechanically fastened (not taped) labels reading 'Solar Generation On Site' at meter bases and 'Solar Power Disconnect' at the safety disconnect switch
Required documents
- RequiredResidential Solar Panel Plan Submittal Requirements ChecklistMurray City's official checklist (rev. 09/24/2025) covering Murray Power approval, building permit application, site plan, one-line diagram, module/inverter/combiner box specs, electrical panel photo, other system components, and safety/warning labels.
- RequiredMurray City Power Interconnection AgreementCompleted and emailed to netmetering@murray.utah.gov; Murray City Power reviews and returns a signed copy before net metering can proceed.
- RequiredMurray City Power Net Metering ChecklistSequenced checklist: Interconnection Agreement -> Building Permit -> Purchase Net Meter -> Installation -> Final Inspection -> Net Meter Installation.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Solar Roof & Ground Mounted Fee (residential) | $394 flat | Murray City Building Permit Fees table, effective 07/01/2026: 'Solar Roof & Ground Mounted — Residential: $394.' |
| Solar Roof & Ground Mounted Fee (commercial) | Based on Valuation (BOV) + 65% Plan Review Fee | Murray City Building Permit Fees table, effective 07/01/2026: 'Solar Roof & Ground Mounted — Commercial: **BOV + 65% *PRF.' |
| Net Meter Purchase Fee (Murray City Power) | $250 (residential customer); $350 (commercial customer) | Murray City Power Net Metering Checklist: 'Purchase Net Meter — Residential Customer Net Meter - $250; Commercial Customer Net Meter - $350.' Paid to Murray City Power, 153 West 4800 South, Murray, UT 84107. |
| Energy Storage System (ESS) Fee | $300 + $20 for each additional unit (residential and commercial) | Murray City Building Permit Fees table, effective 07/01/2026: 'Energy Storage System (ESS) — Residential: $300 + $20 ea addtl; Commercial: $300 + $20 ea addtl.' |
Commercial Building Permit
VerifiedRequired for new commercial construction in Murray, regulated by the 2024 International Building Code (per Murray's own 'Notice of Building Code Adoption,' effective July 1, 2026; Utah Code § 15A-2-103(1)(a)). Murray's official Building Permit Fees table is titled 'Building Permit Fees, Commercial/Residential' — the same ICC-Building-Valuation-Data-based schedule used for the Residential Building Permit applies to commercial construction, using the February 2026 ICC Building Valuation Data Square Foot Construction Costs table for the applicable occupancy/construction type.
Verified 2026-07-19 · Source
Requirements
- New commercial construction regulated by the 2024 IBC (per Murray's Notice of Building Code Adoption, effective July 1, 2026)
- Project Approval from Murray City Planning & Zoning, or scheduling on the next available Planning Commission agenda, before the Building Department will accept the submittal for plan review — per Murray's official New Commercial Building Permit Requirements guide
- Building Permit Application submitted electronically through eProcess 360 (murray.ut.eprocess360.com)
- Restaurant plans require Salt Lake County Health Department approval prior to permit issuance
- Structures in flood hazard areas require an elevation certificate
Required documents
- RequiredBuilding Permit Application (eProcess 360)Submitted electronically through murray.ut.eprocess360.com. Architects', engineers', and contractors' names, phone numbers, addresses, and Utah state license numbers required prior to issuance.
- RequiredNew Commercial Building Permit Requirements ChecklistCity-published guide covering site plan (setbacks, parking, storm drainage with stamped engineer calculations, site utility plan, landscape/irrigation plan per Ordinance #17.68), building plans (code analysis, occupant load, egress plan, ADA accessibility details, door/window/room-finish schedules), structural drawings and calculations (engineer-stamped, current design criteria — wind loads per IBC 1609, Seismic Design Category D, 28 psf ground snow load, geotechnical report), electrical/mechanical plans, material safety data sheets for hazardous materials, and building energy analysis (COMcheck). Sourced from murray.utah.gov 'New Commercial Building Permit Requirements' (DocumentCenter/View/15331, updated 9/16/24), fetched 2026-07-19. NOTE: this checklist PDF still cites the 2021 IBC and 2021 IECC as design criteria — Murray's own Notice of Building Code Adoption confirms the 2024 IBC and 2024 IECC (Utah-amended) are current as of 7/1/2026, so the checklist's code-edition references are stale even though its document-content requirements remain applicable.
- RequiredStructural CalculationsEngineer stamp, date, and signature; includes geotechnical report with stamp, signature, and date, per the New Commercial Building Permit Requirements checklist.
- OptionalSpecial Inspection and Testing AgreementForm available on the Murray City Building Division website, per the checklist.
- OptionalElevation CertificateRequired for structures in flood hazard areas; contact Murray City Engineering (801-270-2440), per the checklist.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee — valuation-based (Murray City table, effective 07/01/2026) | $1.00–$500.00: $100.00 flat. $501.00–$2,000.00: $100.00 + $3.05 per additional $100 (or fraction). $2,001.00–$25,000.00: $150.00 + $14.00 per additional $1,000 (or fraction). $25,001.00–$50,000.00: $391.75 + $10.10 per additional $1,000. $50,001.00–$100,000.00: $643.75 + $7.00 per additional $1,000. $100,001.00–$500,000.00: $993.75 + $5.60 per additional $1,000. $500,001.00–$1,000,000.00: $3,233.75 + $4.75 per additional $1,000. $1,000,001.00 and up: $5,608.75 + $3.65 per additional $1,000. | Murray City 'Building Permit Fees, Commercial/Residential' table (dated 06.22.26, effective July 1, 2026), retrieved from murray.utah.gov/DocumentCenter/View/19435/Building-Fee-Sheet-eff-07012026 —… Show full citationHideMurray City 'Building Permit Fees, Commercial/Residential' table (dated 06.22.26, effective July 1, 2026), retrieved from murray.utah.gov/DocumentCenter/View/19435/Building-Fee-Sheet-eff-07012026 — this is the same table used for the Residential Building Permit; the table's own title confirms it applies to both. Valuation determined per the attached ICC Building Valuation Data, February 2026, Square Foot Construction Costs table. |
| No published generic plan-review-fee percentage for new commercial building | Not found published | Murray's Building Permit Fees packet publishes plan-review-fee (PRF) percentages only for specific narrow categories (e.g. Show full citationHideMurray's Building Permit Fees packet publishes plan-review-fee (PRF) percentages only for specific narrow categories (e.g. ReRoof Commercial and Attached Signs at BOV + 10% PRF; Pole Signs, Cell Towers, Racking, Swimming Pool, Solar, and EV Chargers at BOV + 65% PRF) — no generic 'new commercial building' line with its own PRF percentage was found in the fee sheet. Omitted rather than assumed to match any single one of these category-specific rates. |
| Re-inspection Fee | $100.00 per hour | Murray City Building Permit Fees packet, 'Other Inspections and Fees' item 2: 'Re-inspection fees assessed under provisions of Section 305.8 — $100.00 Per Hour.' |
| Additional Plan Review (changes/additions/revisions) | $80.00 per hour (half-hour minimum) | Murray City Building Permit Fees packet, 'Other Inspections and Fees' item 4. |
| Inspections Outside Normal Business Hours | $100.00 per hour (2-hour minimum) | Murray City Building Permit Fees packet, 'Other Inspections and Fees' item 1. |
Commercial Tenant Improvement / Tenant Finish Permit
VerifiedRequired for tenant improvement and tenant finish work in existing commercial buildings in Murray, per the city's own published Commercial Tenant Improvement checklist. Valuation for tenant finish work can be computed using the ICC Building Valuation Data February 2026 supplemental rate for occupancy classification M (Mercantile) 'Mall Tenant Finish' — $65.55 per square foot — run through the same 'Building Permit Fees, Commercial/Residential' valuation table used for new commercial construction.
Verified 2026-07-19 · Source
Requirements
- Commercial tenant improvement / tenant finish work — Community Development (Planning & Zoning) approval signature required before Building Department submittal, per Murray's official Commercial Tenant Improvement checklist
- Building permits cannot be accepted for plan review until the submittal is complete, per the checklist
- Spaces over 3,000 sq ft, and any medical facility or restaurant regardless of size, require a Utah State registered architect's stamp, signature, and date on the plans
- Projects at Fashion Place Mall require a landlord approval letter
- Contractor state license numbers required for general, electrical, mechanical, and plumbing contractors
Required documents
- RequiredBuilding Permit ApplicationContractor's name, phone number, email, address, and Utah state license numbers for general, electrical, mechanical, and plumbing contractors; type of improvement/remodel; estimate of project valuation; owner/contractor/agent signature and date.
- RequiredCommercial Tenant Improvement ChecklistCity-published checklist covering Community Development (Planning & Zoning) approval, building code analysis, floor plans (specific use of each area, new build-out vs. remodel, key plan/location within the main structure, differentiation of new vs. existing construction, room finishes with flame-spread ratings, seismic bracing for suspended ceilings, stair/handrail/guard details), electrical plans (lighting, fire alarms/smoke detectors, exit signage/emergency lighting), mechanical plans (plumbing fixture locations, exhaust fans, fire/smoke damper locations, equipment schedules), and material specifications. Sourced verbatim from murray.utah.gov 'Commercial Tenant Improvement' (DocumentCenter/View/15103, revised 02/20/24), fetched 2026-07-19.
- OptionalArchitect Stamp (spaces over 3,000 sq ft, medical facilities, or restaurants)Utah State registered architect's stamp, signature, and date required on the plans, per the Commercial Tenant Improvement checklist.
- OptionalLandlord Approval Letter (Fashion Place Mall projects only)Required for tenant improvement plans at Fashion Place Mall, per the checklist.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Mall Tenant Finish valuation rate (Occupancy M) — ICC Building Valuation Data, February 2026 | $65.55 per square foot | Murray City Building Permit Fees packet, 'Additions to this Table' section: 'M...............................Mall Tenant Finish .............................65.55' — a supplemental per-square-foot… Show full citationHideMurray City Building Permit Fees packet, 'Additions to this Table' section: 'M...............................Mall Tenant Finish .............................65.55' — a supplemental per-square-foot valuation rate (beyond the standard ICC Building Valuation Data table) that Murray applies specifically to mall tenant finish projects. This valuation is then run through the same 'Building Permit Fees, Commercial/Residential' table used for new commercial construction to compute the permit fee. |
| Building Permit Fee — valuation-based (Murray City table, effective 07/01/2026) | $1.00–$500.00: $100.00 flat. $2,001.00–$25,000.00: $150.00 + $14.00 per additional $1,000 (or fraction). $100,001.00–$500,000.00: $993.75 + $5.60 per additional $1,000. $1,000,001.00 and up: $5,608.75 + $3.65 per additional $1,000. | Murray City 'Building Permit Fees, Commercial/Residential' table (dated 06.22.26, effective July 1, 2026) — the same table used for new commercial construction and residential permits; Show full citationHideMurray City 'Building Permit Fees, Commercial/Residential' table (dated 06.22.26, effective July 1, 2026) — the same table used for new commercial construction and residential permits; Murray does not publish a fee tier specific to tenant improvement beyond the Mall Tenant Finish valuation rate noted above. |
| No published generic plan-review-fee percentage for tenant improvement | Not found published | As with the Commercial Building Permit, Murray's fee sheet publishes plan-review-fee (PRF) percentages only for specific narrow categories (reroof, signs, pool, solar, racking, EV chargers) — no… Show full citationHideAs with the Commercial Building Permit, Murray's fee sheet publishes plan-review-fee (PRF) percentages only for specific narrow categories (reroof, signs, pool, solar, racking, EV chargers) — no generic tenant-improvement line with its own PRF percentage was found. Omitted rather than assumed. |
| Re-inspection Fee | $100.00 per hour | Murray City Building Permit Fees packet, 'Other Inspections and Fees' item 2. |
| Additional Plan Review (changes/additions/revisions) | $80.00 per hour (half-hour minimum) | Murray City Building Permit Fees packet, 'Other Inspections and Fees' item 4. |
EV Charger / EVSE Permit
VerifiedMurray City publishes a distinct "EV Chargers" line item in its Building Permit Fee Sheet, separate from the flat $100 Electrical/Service Upgrade fee, for installing electric vehicle charging equipment (EVSE) at residential and commercial properties.
Verified 2026-07-19 · Source
Requirements
- Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property
- New dedicated electrical circuit and/or panel capacity to serve the charger
- Any change to electrical service within the Murray City Power service area requires separate Murray Power approval in addition to the city building permit
Required documents
- RequiredBuilding Permit Application (eProcess 360)Submitted online via murray.ut.eprocess360.com; select the EV Charger fee category.
- OptionalMurray City Electrical Permit QuestionnaireOfficial form (murray.utah.gov/DocumentCenter/View/14619) documenting existing vs. upgraded amperage and grounding method, required if the charger installation involves a panel or service change.
- OptionalRequest for Electrical Service Information (Murray City Power)Required for any new construction or change to power service within the Murray City Power service area, detailing added electrical load from the charger and desired delivery voltage. Submitted to Murray City Power (153 West 4800 South, phone 801-264-2730).
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| EV Chargers (Residential) | $300 + $20 per additional charger | Murray City Building Permit Fees table, effective 07/01/2026: "EV Chargers — Residential: $300 + $20 ea addtl." |
| EV Chargers (Commercial) | $300 + $20 per additional charger + 65% Plan Review Fee | Murray City Building Permit Fees table, effective 07/01/2026: "EV Chargers — Commercial: $300 + $20 ea addtl + 65% *PRF." |
Sign Permit
VerifiedMurray issues sign permits as a commercial building permit line item — Attached Signs and Pole Signs each have their own valuation-based fee structure on the city's Building Permit Fee sheet, separate from other commercial permit types.
Verified 2026-07-20 · Source
Requirements
- New sign construction/installation or alteration, classified as either an Attached Sign or a Pole Sign for fee purposes
- Submission through Murray's online permitting portal, eProcess 360
Required documents
- RequiredSign Permit ApplicationSubmitted online via eProcess 360 (https://murray.ut.eprocess360.com/)
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Attached Sign Permit (Commercial) | Based on Valuation (BOV) + 10% Plan Review Fee | Murray City Building Permit Fees, effective July 1, 2025. Listed as 'N/A' for residential — attached signs are fee-classified as commercial. |
| Pole Sign Permit (Commercial) | Based on Valuation (BOV) + 65% Plan Review Fee | Murray City Building Permit Fees, effective July 1, 2025. The 65% plan review rate matches Murray's rate for other structurally engineered freestanding permits (e.g., swimming pools), reflecting the added structural review for freestanding pole signs. |
Sources & verification
Verified against official sources. Last reviewed 2026-07-04.
Fee schedules
Applications & forms
Checklists & handouts
Codes & ordinances
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Murray building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.