Version history — Murray, Utah
This is PermitBase’s own verified record for Murray, reconstructed from this dataset’s version-controlled history. Each version below reflects what our record stated as of that date — it is not a warranty of what Murray’s actual law was at that time.
Permanent link to today’s record
Look up a specific date
Pick a date and we’ll show you the record as it stood then.
All versions
- 2026-08-25Current record
- 2026-08-17Superseded
- Murray, Utah — adopted-codes record updated
- Murray, Utah — Commercial Building Permit fee record added: Commercial Plan Review Fee (codified) (The lesser of the actual costs incurred to review the plan, or 65% of the building permit fee)
- Murray, Utah — Commercial Tenant Improvement / Tenant Finish Permit fee record added: Commercial Plan Review Fee (codified) (The lesser of the actual costs incurred to review the plan, or 65% of the building permit fee)
- Murray, Utah — Commercial Building Permit fee record removed: No published generic plan-review-fee percentage for new commercial building
- Murray, Utah — Commercial Tenant Improvement / Tenant Finish Permit fee record removed: No published generic plan-review-fee percentage for tenant improvement
- 2026-07-22Superseded
- Murray, Utah — Fire Sprinkler System Permit record added
- Murray, Utah — Fire Alarm and Detection System Permit record added
- Murray, Utah — Change of Occupancy / Change of Use Permit record added
- 2026-07-20Superseded
- Murray, Utah — Sign Permit record added
- 2026-07-19Superseded
- Murray, Utah — EV Charger / EVSE Permit record added
- 2026-07-16Superseded
- 2026-07-04Initial record — coverage of Murray began