This is PermitBase’s published record for Murray as of 2026-07-04. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.

Murray building permits

Verified

Murray, Utah — as published 2026-07-04.

Verified 2026-07-04 · Source

Codes adopted

2021 International Building Code (IBC) — current, effective July 1, 2023 per Murray City Building Division page; 2024 IBC takes effect July 1, 2026.2021 International Residential Code (IRC) — current; Murray's Building Division page states the IRC 'remains unchanged' under the July 1, 2026 update (i.e., the 2021 edition continues in force), consistent with Utah Code § 15A-2-103.2021 International Plumbing Code (IPC) — current, effective July 1, 2023; 2024 IPC takes effect July 1, 2026.2021 International Mechanical Code (IMC) — current, effective July 1, 2023; 2024 IMC takes effect July 1, 2026.2021 International Existing Building Code (IEBC) — current, effective July 1, 2023; 2024 IEBC takes effect July 1, 2026.2021 International Energy Conservation Code (IECC) with Utah amendments — current, effective July 1, 2023; 2024 IECC takes effect July 1, 2026.2023 National Electrical Code (NEC) — per Murray City Building Division page, adopted and unchanged in the July 1, 2026 update.

Permit types & fees

Residential Building Permit

Verified

Required for new single-family and two-family residential construction and any work regulated by the adopted 2021 IRC/IBC. Murray's fee schedule uses its own valuation-based table (distinct from Provo's 1997 UBC chart) with a February 2026 ICC Building Valuation Data square-foot construction cost table.

Verified 2026-07-04 · Source

Requirements

  • New single-family or two-family residential construction
  • Any work regulated by the adopted 2021 IRC
  • Structural modifications regulated by the adopted 2021 IBC/IRC
  • Site plan drawn to scale showing actual lot dimensions, size and location of existing buildings, required per Murray City Code § 17.04.100

Required documents

  • RequiredSite PlanDrawn to scale, showing actual dimensions of the lot and size/location of existing buildings, per Murray City Code § 17.04.100 (Building Permits; Site Plan Required).
  • RequiredSingle Family Dwelling Plan Submittal ChecklistMurray City's published checklist for new single-family dwelling plan submittals (Plan Submittals page, murray.utah.gov/171/Plan-Submittals).
  • RequiredBuilding Permit Application (eProcess 360)Submitted online at murray.ut.eprocess360.com. Permit numbers issued through this new system begin with the letter 'E'.

Fee schedule

Fee typeAmountNotes
Building Permit Fee — valuation-based (Murray City table, effective 07/01/2026)$1.00–$500.00: $100.00 flat. $501.00–$2,000.00: $100.00 + $3.05 per additional $100 (or fraction). $2,001.00–$25,000.00: $150.00 + $14.00 per additional $1,000 (or fraction). $25,001.00–$50,000.00: $391.75 + $10.10 per additional $1,000. $50,001.00–$100,000.00: $643.75 + $7.00 per additional $1,000. $100,001.00–$500,000.00: $993.75 + $5.60 per additional $1,000. $500,001.00–$1,000,000.00: $3,233.75 + $4.75 per additional $1,000. $1,000,001.00 and up: $5,608.75 + $3.65 per additional $1,000.Murray City 'Building Permit Fees, Commercial/Residential' table (dated 06.22.26, part of the official Building Permit Fees packet effective July 1, 2026), retrieved from murray.utah.gov/DocumentCenter/View/19435/Building-Fee-Sheet-eff-07012026. Valuation determined per attached ICC Building Valuation Data, February 2026, using the Square Foot Construction Costs table (e.g., R-3 Residential one- and two-family, Type VB construction: $175.92/sq ft; unfinished basements Group R-3: $31.50/sq ft per the same table's footnote d).
Re-inspection Fee$100.00 per hourMurray City Building Permit Fees packet, 'Other Inspections and Fees' item 2: 'Re-inspection fees assessed under provisions of Section 305.8 — $100.00 Per Hour.'
Additional Plan Review (changes/additions/revisions)$80.00 per hour (half-hour minimum)Murray City Building Permit Fees packet, 'Other Inspections and Fees' item 4.
Inspections Outside Normal Business Hours$100.00 per hour (2-hour minimum)Murray City Building Permit Fees packet, 'Other Inspections and Fees' item 1.

Residential Addition / Remodel Permit (incl. Basement Finish)

Verified

Required for residential additions, remodels, and basement finishes in Murray. The official fee sheet lists a distinct discounted rate for Basement Finish: valuation-based fee plus a 50% plan review surcharge (lower than the 65% commercial/general residential plan-review rate).

Verified 2026-07-04 · Source

Requirements

  • Additions to existing one- and two-family residential structures
  • Basement finish work (framing, MEP) in an existing home
  • Structural remodel work regulated by the adopted 2021 IRC
  • Site plan required per Murray City Code § 17.04.100

Required documents

  • RequiredResidential Remodel / Basement Finish Plan Submittal ChecklistMurray City publishes separate checklists for 'Residential Remodel' and 'Basement Finish' project types on its Plan Submittals page (murray.utah.gov/171/Plan-Submittals).
  • RequiredBuilding Permit Application (eProcess 360)Submitted online at murray.ut.eprocess360.com.

Fee schedule

Fee typeAmountNotes
Basement Finish FeeBased on Valuation (BOV) + 50% Plan Review Fee (residential); not applicable to commercial.Murray City Building Permit Fees table, effective 07/01/2026: 'Basement Finish — Residential: **BOV + *PRF 50%; Commercial: N/A.' (PRF = Plan Review Fee; BOV = Based on Valuation, using ICC Building Valuation Data Feb 2026 — SFD New Finished Basement $43.33/sq ft, SFD New Unfinished Basement $31.50/sq ft, SFD Existing Finished Basement $20.78/sq ft, SFD Addition to Existing $175.92/sq ft per the table's 'Additions to this Table' section).

Electrical Permit

Verified

Required for electrical work in Murray, including service upgrades. Any change to service within the Murray City Power service area requires separate Murray Power approval in addition to the city building permit.

Verified 2026-07-04 · Source

Requirements

  • New electrical circuits, wiring installations, or service upgrades
  • Electrical panel or service entrance changes — requires Murray City Power approval if within the Murray Power service area
  • Relocating an existing electrical service (requires a site map of the relocation)
  • Replacing sub-panels

Required documents

  • RequiredMurray City Electrical Permit QuestionnaireOfficial form (murray.utah.gov/DocumentCenter/View/14619) capturing existing vs. upgraded amperage (60/100/125/150/200 amp), whether the service is being relocated, whether sub-panels are being replaced, and the grounding method used.
  • OptionalRequest for Electrical Service Information (Murray City Power)Required for any new construction or change to existing power service within the Murray City Power service area. Submitted to Murray City Power (153 West 4800 South, phone 801-264-2730 / fax 801-264-2731), detailing building size, electrical loads (HVAC, water heating, lighting, etc.), desired delivery voltage, panel size, and motor-start calculations for motors over 25 HP.

Fee schedule

Fee typeAmountNotes
Electrical / Service Upgrade Fee (residential)$100Murray City Building Permit Fees table, effective 07/01/2026: 'Electrical/Service Upgrade — Residential: $100.'

Plumbing Permit

Verified

Required for plumbing installations and alterations in Murray. Murray's fee sheet lists a flat $100 residential plumbing fee, distinct from Provo's per-fixture structure.

Verified 2026-07-04 · Source

Requirements

  • New plumbing fixture installations, standalone on an existing structure
  • Water heater installation or replacement
  • Water line, sewer line, or gas line installation or modification

Required documents

  • RequiredBuilding Permit Application (eProcess 360)Submitted online at murray.ut.eprocess360.com.

Fee schedule

Fee typeAmountNotes
Plumbing Fee (residential)$100Murray City Building Permit Fees table, effective 07/01/2026: 'Plumbing — Residential: $100.'

Mechanical / HVAC Permit

Verified

Required for HVAC installations, replacements, and ductwork modifications in Murray. Flat $100 residential fee per the official fee sheet.

Verified 2026-07-04 · Source

Requirements

  • Furnace, boiler, or air conditioning installation or replacement, standalone on an existing structure
  • Ductwork installation or major modification

Required documents

  • RequiredBuilding Permit Application (eProcess 360)Submitted online at murray.ut.eprocess360.com.

Fee schedule

Fee typeAmountNotes
Mechanical Fee (residential)$100Murray City Building Permit Fees table, effective 07/01/2026: 'Mechanical — Residential: $100.'

Roofing / Re-Roof Permit

Verified

Required for roof replacement and re-roofing in Murray. Murray publishes a distinct flat residential re-roof fee (separate from its general valuation-based building permit fee), with an added charge if new sheathing is installed.

Verified 2026-07-04 · Source

Requirements

  • Complete roof replacement (tear-off and re-roof)
  • Re-roof involving new sheathing (additional fee applies)
  • Murray City Re-Roof Questionnaire required for plan submittal

Required documents

  • RequiredRe-Roof QuestionnaireMurray City's published checklist for re-roof plan submittals, listed on the Plan Submittals page (murray.utah.gov/171/Plan-Submittals).
  • RequiredBuilding Permit Application (eProcess 360)Submitted online at murray.ut.eprocess360.com.

Fee schedule

Fee typeAmountNotes
ReRoof Fee (residential)$200 flat; add $100 if sheathing is being replacedMurray City Building Permit Fees table, effective 07/01/2026: 'ReRoof — Residential: $200' with a listed addition 'W/ Sheathing Add: $100' (residential column).
ReRoof Fee (commercial)Based on Valuation (BOV) + 10% Plan Review FeeMurray City Building Permit Fees table, effective 07/01/2026: 'ReRoof — Commercial: **BOV + 10% *PRF.'

Solar Panel (PV) Permit

Verified

Required for residential rooftop solar photovoltaic installations in Murray. Murray City Power (the municipal electric utility) requires a separate Net Metering Interconnection & Service Agreement in addition to the city building permit — this is a two-track process fully documented in Murray's own Residential Solar Panel Plan Submittal Requirements (rev. 09/24/2025) and Murray City Power Net Metering Checklist.

Verified 2026-07-04 · Source

Requirements

  • Murray Power approval required — contact netmetering@murray.utah.gov for the Net Metering Interconnection & Service Agreement
  • Building permit application via eProcess 360, including project valuation and contractor/subcontractor information
  • Site (plot) plan showing north arrow, home location, and all PV components grouped in an area not exceeding 6 feet (main meter, production meter, AC disconnect, module array(s), inverter(s))
  • One-line diagram showing PV system type, meters, disconnect and inverter ratings, module layout/wiring, maximum system output (system output capped at 10 kW per Murray's checklist), and grounding
  • Module/inverter/combiner box manufacturer specifications; engineer of record confirmation that the roof can support the added solar array load
  • Safety and warning labels: engraved, mechanically fastened (not taped) labels reading 'Solar Generation On Site' at meter bases and 'Solar Power Disconnect' at the safety disconnect switch

Required documents

  • RequiredResidential Solar Panel Plan Submittal Requirements ChecklistMurray City's official checklist (rev. 09/24/2025) covering Murray Power approval, building permit application, site plan, one-line diagram, module/inverter/combiner box specs, electrical panel photo, other system components, and safety/warning labels.
  • RequiredMurray City Power Interconnection AgreementCompleted and emailed to netmetering@murray.utah.gov; Murray City Power reviews and returns a signed copy before net metering can proceed.
  • RequiredMurray City Power Net Metering ChecklistSequenced checklist: Interconnection Agreement -> Building Permit -> Purchase Net Meter -> Installation -> Final Inspection -> Net Meter Installation.

Fee schedule

Fee typeAmountNotes
Solar Roof & Ground Mounted Fee (residential)$394 flatMurray City Building Permit Fees table, effective 07/01/2026: 'Solar Roof & Ground Mounted — Residential: $394.'
Solar Roof & Ground Mounted Fee (commercial)Based on Valuation (BOV) + 65% Plan Review FeeMurray City Building Permit Fees table, effective 07/01/2026: 'Solar Roof & Ground Mounted — Commercial: **BOV + 65% *PRF.'
Net Meter Purchase Fee (Murray City Power)$250 (residential customer); $350 (commercial customer)Murray City Power Net Metering Checklist: 'Purchase Net Meter — Residential Customer Net Meter - $250; Commercial Customer Net Meter - $350.' Paid to Murray City Power, 153 West 4800 South, Murray, UT 84107.
Energy Storage System (ESS) Fee$300 + $20 for each additional unit (residential and commercial)Murray City Building Permit Fees table, effective 07/01/2026: 'Energy Storage System (ESS) — Residential: $300 + $20 ea addtl; Commercial: $300 + $20 ea addtl.'

Sources & verification

Verified against official sources. Last reviewed 2026-07-04.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Murray building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Later version (2026-07-16) →View current record →All versions →

Permalink: /utah/salt-lake-county/murray/as-of/2026-07-04/

Snapshot date: 2026-07-04