You are viewing the permanent link for the record currently in effect, published 2026-07-16.
Murray building permits
VerifiedMurray, Utah — as published 2026-07-16.
Verified 2026-07-04 · Source
Codes adopted
Permit types & fees
Residential Building Permit
VerifiedRequired for new single-family and two-family residential construction and any work regulated by the adopted 2021 IRC / 2024 IBC. Murray's fee schedule uses its own valuation-based table (distinct from Provo's 1997 UBC chart) with a February 2026 ICC Building Valuation Data square-foot construction cost table.
Verified 2026-07-04 · Source
Requirements
- New single-family or two-family residential construction
- Any work regulated by the adopted 2021 IRC
- Structural modifications regulated by the adopted 2024 IBC / 2021 IRC
- Site plan drawn to scale showing actual lot dimensions, size and location of existing buildings, required per Murray City Code § 17.04.100
Required documents
- RequiredSite PlanDrawn to scale, showing actual dimensions of the lot and size/location of existing buildings, per Murray City Code § 17.04.100 (Building Permits; Site Plan Required).
- RequiredSingle Family Dwelling Plan Submittal ChecklistMurray City's published checklist for new single-family dwelling plan submittals (Plan Submittals page, murray.utah.gov/171/Plan-Submittals).
- RequiredBuilding Permit Application (eProcess 360)Submitted online at murray.ut.eprocess360.com. Permit numbers issued through this new system begin with the letter 'E'.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee — valuation-based (Murray City table, effective 07/01/2026) | $1.00–$500.00: $100.00 flat. $501.00–$2,000.00: $100.00 + $3.05 per additional $100 (or fraction). $2,001.00–$25,000.00: $150.00 + $14.00 per additional $1,000 (or fraction). $25,001.00–$50,000.00: $391.75 + $10.10 per additional $1,000. $50,001.00–$100,000.00: $643.75 + $7.00 per additional $1,000. $100,001.00–$500,000.00: $993.75 + $5.60 per additional $1,000. $500,001.00–$1,000,000.00: $3,233.75 + $4.75 per additional $1,000. $1,000,001.00 and up: $5,608.75 + $3.65 per additional $1,000. | Murray City 'Building Permit Fees, Commercial/Residential' table (dated 06.22.26, part of the official Building Permit Fees packet effective July 1, 2026), retrieved from murray.utah.gov/DocumentCenter/View/19435/Building-Fee-Sheet-eff-07012026. Valuation determined per attached ICC Building Valuation Data, February 2026, using the Square Foot Construction Costs table (e.g., R-3 Residential one- and two-family, Type VB construction: $175.92/sq ft; unfinished basements Group R-3: $31.50/sq ft per the same table's footnote d). |
| Re-inspection Fee | $100.00 per hour | Murray City Building Permit Fees packet, 'Other Inspections and Fees' item 2: 'Re-inspection fees assessed under provisions of Section 305.8 — $100.00 Per Hour.' |
| Additional Plan Review (changes/additions/revisions) | $80.00 per hour (half-hour minimum) | Murray City Building Permit Fees packet, 'Other Inspections and Fees' item 4. |
| Inspections Outside Normal Business Hours | $100.00 per hour (2-hour minimum) | Murray City Building Permit Fees packet, 'Other Inspections and Fees' item 1. |
Residential Addition / Remodel Permit (incl. Basement Finish)
VerifiedRequired for residential additions, remodels, and basement finishes in Murray. The official fee sheet lists a distinct discounted rate for Basement Finish: valuation-based fee plus a 50% plan review surcharge (lower than the 65% commercial/general residential plan-review rate).
Verified 2026-07-04 · Source
Requirements
- Additions to existing one- and two-family residential structures
- Basement finish work (framing, MEP) in an existing home
- Structural remodel work regulated by the adopted 2021 IRC
- Site plan required per Murray City Code § 17.04.100
Required documents
- RequiredResidential Remodel / Basement Finish Plan Submittal ChecklistMurray City publishes separate checklists for 'Residential Remodel' and 'Basement Finish' project types on its Plan Submittals page (murray.utah.gov/171/Plan-Submittals).
- RequiredBuilding Permit Application (eProcess 360)Submitted online at murray.ut.eprocess360.com.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Basement Finish Fee | Based on Valuation (BOV) + 50% Plan Review Fee (residential); not applicable to commercial. | Murray City Building Permit Fees table, effective 07/01/2026: 'Basement Finish — Residential: **BOV + *PRF 50%; Commercial: N/A.' (PRF = Plan Review Fee; BOV = Based on Valuation, using ICC Building Valuation Data Feb 2026 — SFD New Finished Basement $43.33/sq ft, SFD New Unfinished Basement $31.50/sq ft, SFD Existing Finished Basement $20.78/sq ft, SFD Addition to Existing $175.92/sq ft per the table's 'Additions to this Table' section). |
Electrical Permit
VerifiedRequired for electrical work in Murray, including service upgrades. Any change to service within the Murray City Power service area requires separate Murray Power approval in addition to the city building permit.
Verified 2026-07-04 · Source
Requirements
- New electrical circuits, wiring installations, or service upgrades
- Electrical panel or service entrance changes — requires Murray City Power approval if within the Murray Power service area
- Relocating an existing electrical service (requires a site map of the relocation)
- Replacing sub-panels
Required documents
- RequiredMurray City Electrical Permit QuestionnaireOfficial form (murray.utah.gov/DocumentCenter/View/14619) capturing existing vs. upgraded amperage (60/100/125/150/200 amp), whether the service is being relocated, whether sub-panels are being replaced, and the grounding method used.
- OptionalRequest for Electrical Service Information (Murray City Power)Required for any new construction or change to existing power service within the Murray City Power service area. Submitted to Murray City Power (153 West 4800 South, phone 801-264-2730 / fax 801-264-2731), detailing building size, electrical loads (HVAC, water heating, lighting, etc.), desired delivery voltage, panel size, and motor-start calculations for motors over 25 HP.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Electrical / Service Upgrade Fee (residential) | $100 | Murray City Building Permit Fees table, effective 07/01/2026: 'Electrical/Service Upgrade — Residential: $100.' |
Plumbing Permit
VerifiedRequired for plumbing installations and alterations in Murray. Murray's fee sheet lists a flat $100 residential plumbing fee, distinct from Provo's per-fixture structure.
Verified 2026-07-04 · Source
Requirements
- New plumbing fixture installations, standalone on an existing structure
- Water heater installation or replacement
- Water line, sewer line, or gas line installation or modification
Required documents
- RequiredBuilding Permit Application (eProcess 360)Submitted online at murray.ut.eprocess360.com.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Plumbing Fee (residential) | $100 | Murray City Building Permit Fees table, effective 07/01/2026: 'Plumbing — Residential: $100.' |
Mechanical / HVAC Permit
VerifiedRequired for HVAC installations, replacements, and ductwork modifications in Murray. Flat $100 residential fee per the official fee sheet.
Verified 2026-07-04 · Source
Requirements
- Furnace, boiler, or air conditioning installation or replacement, standalone on an existing structure
- Ductwork installation or major modification
Required documents
- RequiredBuilding Permit Application (eProcess 360)Submitted online at murray.ut.eprocess360.com.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Mechanical Fee (residential) | $100 | Murray City Building Permit Fees table, effective 07/01/2026: 'Mechanical — Residential: $100.' |
Roofing / Re-Roof Permit
VerifiedRequired for roof replacement and re-roofing in Murray. Murray publishes a distinct flat residential re-roof fee (separate from its general valuation-based building permit fee), with an added charge if new sheathing is installed.
Verified 2026-07-04 · Source
Requirements
- Complete roof replacement (tear-off and re-roof)
- Re-roof involving new sheathing (additional fee applies)
- Murray City Re-Roof Questionnaire required for plan submittal
Required documents
- RequiredRe-Roof QuestionnaireMurray City's published checklist for re-roof plan submittals, listed on the Plan Submittals page (murray.utah.gov/171/Plan-Submittals).
- RequiredBuilding Permit Application (eProcess 360)Submitted online at murray.ut.eprocess360.com.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| ReRoof Fee (residential) | $200 flat; add $100 if sheathing is being replaced | Murray City Building Permit Fees table, effective 07/01/2026: 'ReRoof — Residential: $200' with a listed addition 'W/ Sheathing Add: $100' (residential column). |
| ReRoof Fee (commercial) | Based on Valuation (BOV) + 10% Plan Review Fee | Murray City Building Permit Fees table, effective 07/01/2026: 'ReRoof — Commercial: **BOV + 10% *PRF.' |
Solar Panel (PV) Permit
VerifiedRequired for residential rooftop solar photovoltaic installations in Murray. Murray City Power (the municipal electric utility) requires a separate Net Metering Interconnection & Service Agreement in addition to the city building permit — this is a two-track process fully documented in Murray's own Residential Solar Panel Plan Submittal Requirements (rev. 09/24/2025) and Murray City Power Net Metering Checklist.
Verified 2026-07-19 · Source
Requirements
- Murray Power approval required — contact netmetering@murray.utah.gov for the Net Metering Interconnection & Service Agreement
- Building permit application via eProcess 360, including project valuation and contractor/subcontractor information
- Site (plot) plan showing north arrow, home location, and all PV components grouped in an area not exceeding 6 feet (main meter, production meter, AC disconnect, module array(s), inverter(s))
- One-line diagram showing PV system type, meters, disconnect and inverter ratings, module layout/wiring, maximum system output (system output capped at 10 kW per Murray's checklist), and grounding
- Module/inverter/combiner box manufacturer specifications; engineer of record confirmation that the roof can support the added solar array load
- Safety and warning labels: engraved, mechanically fastened (not taped) labels reading 'Solar Generation On Site' at meter bases and 'Solar Power Disconnect' at the safety disconnect switch
Required documents
- RequiredResidential Solar Panel Plan Submittal Requirements ChecklistMurray City's official checklist (rev. 09/24/2025) covering Murray Power approval, building permit application, site plan, one-line diagram, module/inverter/combiner box specs, electrical panel photo, other system components, and safety/warning labels.
- RequiredMurray City Power Interconnection AgreementCompleted and emailed to netmetering@murray.utah.gov; Murray City Power reviews and returns a signed copy before net metering can proceed.
- RequiredMurray City Power Net Metering ChecklistSequenced checklist: Interconnection Agreement -> Building Permit -> Purchase Net Meter -> Installation -> Final Inspection -> Net Meter Installation.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Solar Roof & Ground Mounted Fee (residential) | $394 flat | Murray City Building Permit Fees table, effective 07/01/2026: 'Solar Roof & Ground Mounted — Residential: $394.' |
| Solar Roof & Ground Mounted Fee (commercial) | Based on Valuation (BOV) + 65% Plan Review Fee | Murray City Building Permit Fees table, effective 07/01/2026: 'Solar Roof & Ground Mounted — Commercial: **BOV + 65% *PRF.' |
| Net Meter Purchase Fee (Murray City Power) | $250 (residential customer); $350 (commercial customer) | Murray City Power Net Metering Checklist: 'Purchase Net Meter — Residential Customer Net Meter - $250; Commercial Customer Net Meter - $350.' Paid to Murray City Power, 153 West 4800 South, Murray, UT 84107. |
| Energy Storage System (ESS) Fee | $300 + $20 for each additional unit (residential and commercial) | Murray City Building Permit Fees table, effective 07/01/2026: 'Energy Storage System (ESS) — Residential: $300 + $20 ea addtl; Commercial: $300 + $20 ea addtl.' |
Commercial Building Permit
VerifiedRequired for new commercial construction in Murray, regulated by the 2024 International Building Code (per Murray's own 'Notice of Building Code Adoption,' effective July 1, 2026; Utah Code § 15A-2-103(1)(a)). Murray's official Building Permit Fees table is titled 'Building Permit Fees, Commercial/Residential' — the same ICC-Building-Valuation-Data-based schedule used for the Residential Building Permit applies to commercial construction, using the February 2026 ICC Building Valuation Data Square Foot Construction Costs table for the applicable occupancy/construction type.
Verified 2026-07-19 · Source
Requirements
- New commercial construction regulated by the 2024 IBC (per Murray's Notice of Building Code Adoption, effective July 1, 2026)
- Project Approval from Murray City Planning & Zoning, or scheduling on the next available Planning Commission agenda, before the Building Department will accept the submittal for plan review — per Murray's official New Commercial Building Permit Requirements guide
- Building Permit Application submitted electronically through eProcess 360 (murray.ut.eprocess360.com)
- Restaurant plans require Salt Lake County Health Department approval prior to permit issuance
- Structures in flood hazard areas require an elevation certificate
Required documents
- RequiredBuilding Permit Application (eProcess 360)Submitted electronically through murray.ut.eprocess360.com. Architects', engineers', and contractors' names, phone numbers, addresses, and Utah state license numbers required prior to issuance.
- RequiredNew Commercial Building Permit Requirements ChecklistCity-published guide covering site plan (setbacks, parking, storm drainage with stamped engineer calculations, site utility plan, landscape/irrigation plan per Ordinance #17.68), building plans (code analysis, occupant load, egress plan, ADA accessibility details, door/window/room-finish schedules), structural drawings and calculations (engineer-stamped, current design criteria — wind loads per IBC 1609, Seismic Design Category D, 28 psf ground snow load, geotechnical report), electrical/mechanical plans, material safety data sheets for hazardous materials, and building energy analysis (COMcheck). Sourced from murray.utah.gov 'New Commercial Building Permit Requirements' (DocumentCenter/View/15331, updated 9/16/24), fetched 2026-07-19. NOTE: this checklist PDF still cites the 2021 IBC and 2021 IECC as design criteria — Murray's own Notice of Building Code Adoption confirms the 2024 IBC and 2024 IECC (Utah-amended) are current as of 7/1/2026, so the checklist's code-edition references are stale even though its document-content requirements remain applicable.
- RequiredStructural CalculationsEngineer stamp, date, and signature; includes geotechnical report with stamp, signature, and date, per the New Commercial Building Permit Requirements checklist.
- OptionalSpecial Inspection and Testing AgreementForm available on the Murray City Building Division website, per the checklist.
- OptionalElevation CertificateRequired for structures in flood hazard areas; contact Murray City Engineering (801-270-2440), per the checklist.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee — valuation-based (Murray City table, effective 07/01/2026) | $1.00–$500.00: $100.00 flat. $501.00–$2,000.00: $100.00 + $3.05 per additional $100 (or fraction). $2,001.00–$25,000.00: $150.00 + $14.00 per additional $1,000 (or fraction). $25,001.00–$50,000.00: $391.75 + $10.10 per additional $1,000. $50,001.00–$100,000.00: $643.75 + $7.00 per additional $1,000. $100,001.00–$500,000.00: $993.75 + $5.60 per additional $1,000. $500,001.00–$1,000,000.00: $3,233.75 + $4.75 per additional $1,000. $1,000,001.00 and up: $5,608.75 + $3.65 per additional $1,000. | Murray City 'Building Permit Fees, Commercial/Residential' table (dated 06.22.26, effective July 1, 2026), retrieved from murray.utah.gov/DocumentCenter/View/19435/Building-Fee-Sheet-eff-07012026 — this is the same table used for the Residential Building Permit; the table's own title confirms it applies to both. Valuation determined per the attached ICC Building Valuation Data, February 2026, Square Foot Construction Costs table. |
| No published generic plan-review-fee percentage for new commercial building | Not found published | Murray's Building Permit Fees packet publishes plan-review-fee (PRF) percentages only for specific narrow categories (e.g. ReRoof Commercial and Attached Signs at BOV + 10% PRF; Pole Signs, Cell Towers, Racking, Swimming Pool, Solar, and EV Chargers at BOV + 65% PRF) — no generic 'new commercial building' line with its own PRF percentage was found in the fee sheet. Omitted rather than assumed to match any single one of these category-specific rates. |
| Re-inspection Fee | $100.00 per hour | Murray City Building Permit Fees packet, 'Other Inspections and Fees' item 2: 'Re-inspection fees assessed under provisions of Section 305.8 — $100.00 Per Hour.' |
| Additional Plan Review (changes/additions/revisions) | $80.00 per hour (half-hour minimum) | Murray City Building Permit Fees packet, 'Other Inspections and Fees' item 4. |
| Inspections Outside Normal Business Hours | $100.00 per hour (2-hour minimum) | Murray City Building Permit Fees packet, 'Other Inspections and Fees' item 1. |
Commercial Tenant Improvement / Tenant Finish Permit
VerifiedRequired for tenant improvement and tenant finish work in existing commercial buildings in Murray, per the city's own published Commercial Tenant Improvement checklist. Valuation for tenant finish work can be computed using the ICC Building Valuation Data February 2026 supplemental rate for occupancy classification M (Mercantile) 'Mall Tenant Finish' — $65.55 per square foot — run through the same 'Building Permit Fees, Commercial/Residential' valuation table used for new commercial construction.
Verified 2026-07-19 · Source
Requirements
- Commercial tenant improvement / tenant finish work — Community Development (Planning & Zoning) approval signature required before Building Department submittal, per Murray's official Commercial Tenant Improvement checklist
- Building permits cannot be accepted for plan review until the submittal is complete, per the checklist
- Spaces over 3,000 sq ft, and any medical facility or restaurant regardless of size, require a Utah State registered architect's stamp, signature, and date on the plans
- Projects at Fashion Place Mall require a landlord approval letter
- Contractor state license numbers required for general, electrical, mechanical, and plumbing contractors
Required documents
- RequiredBuilding Permit ApplicationContractor's name, phone number, email, address, and Utah state license numbers for general, electrical, mechanical, and plumbing contractors; type of improvement/remodel; estimate of project valuation; owner/contractor/agent signature and date.
- RequiredCommercial Tenant Improvement ChecklistCity-published checklist covering Community Development (Planning & Zoning) approval, building code analysis, floor plans (specific use of each area, new build-out vs. remodel, key plan/location within the main structure, differentiation of new vs. existing construction, room finishes with flame-spread ratings, seismic bracing for suspended ceilings, stair/handrail/guard details), electrical plans (lighting, fire alarms/smoke detectors, exit signage/emergency lighting), mechanical plans (plumbing fixture locations, exhaust fans, fire/smoke damper locations, equipment schedules), and material specifications. Sourced verbatim from murray.utah.gov 'Commercial Tenant Improvement' (DocumentCenter/View/15103, revised 02/20/24), fetched 2026-07-19.
- OptionalArchitect Stamp (spaces over 3,000 sq ft, medical facilities, or restaurants)Utah State registered architect's stamp, signature, and date required on the plans, per the Commercial Tenant Improvement checklist.
- OptionalLandlord Approval Letter (Fashion Place Mall projects only)Required for tenant improvement plans at Fashion Place Mall, per the checklist.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Mall Tenant Finish valuation rate (Occupancy M) — ICC Building Valuation Data, February 2026 | $65.55 per square foot | Murray City Building Permit Fees packet, 'Additions to this Table' section: 'M...............................Mall Tenant Finish .............................65.55' — a supplemental per-square-foot valuation rate (beyond the standard ICC Building Valuation Data table) that Murray applies specifically to mall tenant finish projects. This valuation is then run through the same 'Building Permit Fees, Commercial/Residential' table used for new commercial construction to compute the permit fee. |
| Building Permit Fee — valuation-based (Murray City table, effective 07/01/2026) | $1.00–$500.00: $100.00 flat. $2,001.00–$25,000.00: $150.00 + $14.00 per additional $1,000 (or fraction). $100,001.00–$500,000.00: $993.75 + $5.60 per additional $1,000. $1,000,001.00 and up: $5,608.75 + $3.65 per additional $1,000. | Murray City 'Building Permit Fees, Commercial/Residential' table (dated 06.22.26, effective July 1, 2026) — the same table used for new commercial construction and residential permits; Murray does not publish a fee tier specific to tenant improvement beyond the Mall Tenant Finish valuation rate noted above. |
| No published generic plan-review-fee percentage for tenant improvement | Not found published | As with the Commercial Building Permit, Murray's fee sheet publishes plan-review-fee (PRF) percentages only for specific narrow categories (reroof, signs, pool, solar, racking, EV chargers) — no generic tenant-improvement line with its own PRF percentage was found. Omitted rather than assumed. |
| Re-inspection Fee | $100.00 per hour | Murray City Building Permit Fees packet, 'Other Inspections and Fees' item 2. |
| Additional Plan Review (changes/additions/revisions) | $80.00 per hour (half-hour minimum) | Murray City Building Permit Fees packet, 'Other Inspections and Fees' item 4. |
EV Charger / EVSE Permit
VerifiedMurray City publishes a distinct "EV Chargers" line item in its Building Permit Fee Sheet, separate from the flat $100 Electrical/Service Upgrade fee, for installing electric vehicle charging equipment (EVSE) at residential and commercial properties.
Verified 2026-07-19 · Source
Requirements
- Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property
- New dedicated electrical circuit and/or panel capacity to serve the charger
- Any change to electrical service within the Murray City Power service area requires separate Murray Power approval in addition to the city building permit
Required documents
- RequiredBuilding Permit Application (eProcess 360)Submitted online via murray.ut.eprocess360.com; select the EV Charger fee category.
- OptionalMurray City Electrical Permit QuestionnaireOfficial form (murray.utah.gov/DocumentCenter/View/14619) documenting existing vs. upgraded amperage and grounding method, required if the charger installation involves a panel or service change.
- OptionalRequest for Electrical Service Information (Murray City Power)Required for any new construction or change to power service within the Murray City Power service area, detailing added electrical load from the charger and desired delivery voltage. Submitted to Murray City Power (153 West 4800 South, phone 801-264-2730).
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| EV Chargers (Residential) | $300 + $20 per additional charger | Murray City Building Permit Fees table, effective 07/01/2026: "EV Chargers — Residential: $300 + $20 ea addtl." |
| EV Chargers (Commercial) | $300 + $20 per additional charger + 65% Plan Review Fee | Murray City Building Permit Fees table, effective 07/01/2026: "EV Chargers — Commercial: $300 + $20 ea addtl + 65% *PRF." |
Sign Permit
VerifiedMurray issues sign permits as a commercial building permit line item — Attached Signs and Pole Signs each have their own valuation-based fee structure on the city's Building Permit Fee sheet, separate from other commercial permit types.
Verified 2026-07-20 · Source
Requirements
- New sign construction/installation or alteration, classified as either an Attached Sign or a Pole Sign for fee purposes
- Submission through Murray's online permitting portal, eProcess 360
Required documents
- RequiredSign Permit ApplicationSubmitted online via eProcess 360 (https://murray.ut.eprocess360.com/)
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Attached Sign Permit (Commercial) | Based on Valuation (BOV) + 10% Plan Review Fee | Murray City Building Permit Fees, effective July 1, 2025. Listed as 'N/A' for residential — attached signs are fee-classified as commercial. |
| Pole Sign Permit (Commercial) | Based on Valuation (BOV) + 65% Plan Review Fee | Murray City Building Permit Fees, effective July 1, 2025. The 65% plan review rate matches Murray's rate for other structurally engineered freestanding permits (e.g., swimming pools), reflecting the added structural review for freestanding pole signs. |
Fire Sprinkler System Permit
VerifiedMurray operates its own independent municipal Fire Department (not the Unified Fire Authority) — new fire sprinkler system installations and additions/modifications to existing systems require a distinct plan submittal and permit from the Murray City Fire Marshals Office, per the department's own 'Fire Suppression System Submittal' requirements and 'Fire and Life Safety Fee Schedule,' separate from the Building Division's trade-permit fee sheet.
Verified 2026-07-22 · Source
Requirements
- All new commercial fire sprinkler (fire suppression) system installations and existing-system additions or modifications require a plan submittal and permit from the Murray City Fire Marshals Office
- Fire sprinkler systems where more than twenty (20) sprinkler appliances (heads) are added, removed, or relocated require an approved third-party review by a company approved by the Murray City Fire Marshals Office
- Design and installation via the most recent version of NFPA 13, NFPA 13-R, or NFPA 13-D adopted by the State of Utah
- Working plans drawn to an indicated scale, on uniform-size sheets, with a plan of each floor; manufacturer cut sheets and hydraulic calculations submitted with the plans
- Any structure (except one- and two-family dwellings) with a fire sprinkler system installed must have off-site monitoring
- All Fire Department Connection caps and standpipe connections must be Knox-brand locking caps
- System designer must be NICET Level III or better ('Water-Based Fire Protection Systems Layout'), a Fire Protection Engineer, or a licensed engineer with specific additional fire protection system training; plans must show the designer's NICET certification number with signature, or an engineer stamp with signature
- A new permit and third-party plan review are required whenever the fire sprinkler system's hazard classification design changes
Required documents
- RequiredFire Suppression System Submittal (working plans)Murray City Fire Marshals Office plan set: scaled drawings on uniform-size sheets, one plan per floor, manufacturer cut sheets, and hydraulic calculations, per the official 'Fire Suppression System Submittal' requirements document.
- OptionalThird-Party Plan Review ReportRequired when more than 20 fire sprinkler appliances are added, removed, or relocated. Plans must be submitted to a third-party review company approved by the Murray City Fire Marshals Office before submittal to the Fire Marshals Office.
- RequiredFire and Life Safety Fee Schedule formOfficial Murray City form listing permit number, site address, and checkboxes for each applicable Fire Alarm, Sprinkler System, and Other Fire/Life Safety fee.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Fire Sprinkler System Plan Review | $150 | Murray City Fire and Life Safety Fee Schedule. |
| Fire Sprinkler Flow Test/Riser Inspection | $50 | Murray City Fire and Life Safety Fee Schedule. |
| Fire Sprinkler 200lbs Test | $50 | Murray City Fire and Life Safety Fee Schedule. |
| Fire Sprinkler Above the Grid and Bracing Inspection | $50 | Murray City Fire and Life Safety Fee Schedule. |
| Fire Sprinkler Final Inspection | $50 | Murray City Fire and Life Safety Fee Schedule. |
| Additional Inspections (projects completed in zones) | Variable — amount entered per project | Murray City Fire and Life Safety Fee Schedule lists an open dollar-amount line for 'Addition Inspections if project is being completed in Zones' rather than a fixed rate; contact the Fire Marshal (801-264-2780) for the applicable per-zone charge. |
Fire Alarm and Detection System Permit
VerifiedMurray operates its own independent municipal Fire Department (not the Unified Fire Authority) — new commercial fire alarm system installations and additions/modifications to existing systems require a distinct plan submittal and permit from the Murray City Fire Marshals Office, per the department's own 'Fire Alarm and Detection System Submittal' requirements and 'Fire and Life Safety Fee Schedule,' separate from the Building Division's trade-permit fee sheet.
Verified 2026-07-22 · Source
Requirements
- All new commercial fire alarm system installations and existing-system additions or modifications require a plan submittal and permit from the Murray City Fire Marshals Office
- Fire alarm systems where more than five (5) horns or strobes are added or relocated require an approved third-party review by a company approved by the Murray City Fire Marshals Office
- Design and installation via the most recent version of NFPA 72 adopted by the State of Utah
- Working plans drawn to an indicated scale, on uniform-size sheets, with a plan of each floor; proposed use for each room shown on plans; manufacturer cut sheets; horn/strobe candela setting indicated; battery calculations submitted with the plans
- System designer must be NICET Level III or better ('Engineering Technician'), a Fire Protection Engineer, or a licensed engineer with specific additional fire protection system training; plans must show the designer's NICET certification number with signature, or an engineer stamp with signature
- Remote annunciators required near the main interior areas accessible to the fire department
- Smoke detection required at the location of each fire alarm control unit, notification appliance circuit power extenders, and supervising station transmitting equipment
- Any structure (except one- and two-family dwellings) with a fire sprinkler system installed must have off-site monitoring
Required documents
- RequiredFire Alarm and Detection System Submittal (working plans)Murray City Fire Marshals Office plan set: scaled drawings on uniform-size sheets, one plan per floor, room-use designations, manufacturer cut sheets, horn/strobe candela settings, and battery calculations, per the official 'Fire Alarm and Detection System Submittal' requirements document.
- OptionalThird-Party Plan Review ReportRequired when more than 5 horns or strobes are added or relocated. Plans must be submitted to a third-party review company approved by the Murray City Fire Marshals Office before submittal to the Fire Marshals Office; any corrections required by the third-party review must be revised on the plans prior to submittal.
- RequiredFire and Life Safety Fee Schedule formOfficial Murray City form listing permit number, site address, and checkboxes for each applicable Fire Alarm, Sprinkler System, and Other Fire/Life Safety fee.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Fire Alarm Plan Review | $150 | Murray City Fire and Life Safety Fee Schedule. |
| Fire Alarm Test/Inspection | $50 | Murray City Fire and Life Safety Fee Schedule. |
| Fire Alarm 24hr Battery Test | $50 | Murray City Fire and Life Safety Fee Schedule. |
| Additional Inspections (projects completed in zones) | Variable — amount entered per project | Murray City Fire and Life Safety Fee Schedule lists an open dollar-amount line for 'Addition Inspections if project is being completed in Zones' rather than a fixed rate; contact the Fire Marshal (801-264-2780) for the applicable per-zone charge. |
Change of Occupancy / Change of Use Permit
VerifiedMurray City's official 'Change of Occupancy' policy implements the International Existing Building Code's change-of-use provisions and IBC 2021 Section 111 (no change of occupancy or re-occupancy without a Certificate of Occupancy issued by the building official). Murray does not publish a distinct standalone fee for a change of occupancy itself — the underlying Building Permit Fees valuation-based table already documented in this jurisdiction's Commercial Building Permit and Commercial Tenant Improvement entries governs any upgrade work the change of use triggers, since a change of occupancy cannot be completed without a building permit for the associated work.
Verified 2026-07-22 · Source
Requirements
- No change may be made in the use or occupancy of a building that would place it in a different occupancy division or group unless the building is made to comply with the applicable code requirements for that division/group, subject to the building official's approval of exceptions where the new use is less hazardous than the existing use (per the adopted International Existing Building Code)
- Murray City requires an analysis from a Utah-licensed architect assessing the existing structure to identify existing hazards and determine which components pose a higher relative hazard under the new use
- A change of use to a higher relative hazard must be upgraded to comply with all requirements for the new use
- Per IBC 2021 Section 111, a building or structure (or portion thereof) shall not be used, occupied, or have its occupancy changed until the building official has issued a Certificate of Occupancy
- The architect's analysis must specifically address: means of egress/life safety, heights/areas/type of construction, exterior wall fire-resistance, earthquake safety (structural upgrade if the occupancy category increases per Murray's relative-hazard tables, or if occupant load increases 100% or more), and disabled accessibility
- 20% of the cost of any associated remodel must be expended toward increasing disabled access (which may require accessible toilet rooms and/or other accessible features depending on the extent of the remodel)
- Permits are required for all upgrade work identified by the analysis, and all new work must comply with current construction codes
Required documents
- RequiredArchitect's Hazard Analysis ReportPrepared by a Utah-licensed architect per Murray's official 'Change of Occupancy' policy; must address means of egress/life safety, heights/areas/construction type, exterior wall fire-resistance, earthquake safety, and disabled accessibility, using the relative-hazard/occupancy-classification tables published in the policy. Reviewed and commented on by the Building Inspection Division, which may require additional items after review.
- RequiredBuilding Permit Application (eProcess 360)Required for any upgrade work identified by the architect's analysis; submitted online at murray.ut.eprocess360.com the same way as commercial building and tenant-improvement permits.
- RequiredRequirements For A Certificate Of Occupancy formSame combined Building/Electrical/Mechanical/Plumbing, Engineering & SWPP, Fire, and Planning/Zoning sign-off form (Doc 15706) used for other Murray permit types; a Certificate of Occupancy must be issued before the new use can occupy the space, per IBC 2021 Section 111.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| No distinct Change-of-Occupancy fee published | Governed by the Building Permit Fees (valuation-based) table | Murray's official 'Change of Occupancy' policy document does not list a standalone permit fee — it states only that 'permits are required for upgrade work and all new work must comply with current construction codes.' The governing fee is therefore the same 'Building Permit Fees, Commercial/Residential' valuation-based table (effective 07/01/2026, murray.utah.gov/DocumentCenter/View/19435) already used for the Commercial Building Permit and Commercial Tenant Improvement Permit entries in this jurisdiction, applied to the valuation of whatever upgrade work the change of use requires. This is treated as verified (a genuinely governing general fee), not partial, since no jurisdiction-specific standalone fee exists to omit. |
| Additional Plan Review (architect's analysis review, if beyond standard review) | $80.00 per hour (half-hour minimum) | Murray City Building Permit Fees packet, 'Other Inspections and Fees' item 4 — the same rate applied to changes/additions/revisions on any Murray plan submittal, including a Change of Occupancy analysis. |
| Onsite Consultation | $160 | Murray City Building Permit Fees packet, 'Additional Fees' section — available if an onsite consultation is requested as part of evaluating the change-of-use analysis. |
Sources & verification
Verified against official sources. Last reviewed 2026-07-04.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Murray building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.