This is PermitBase’s published record for West Valley City as of 2026-06-29. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.
West Valley City building permits
West Valley City, Utah — as published 2026-06-29.
Reviewed 2026-06-29 · Source
Codes adopted
Permit types & fees
Residential Building Permit
Required for new residential construction, additions, structural alterations, and finishing of previously unfinished space in West Valley City. Governed by the 2021 International Residential Code and WVC Municipal Code Title 16.
Reviewed 2026-06-29 · Source
Requirements
- New single-family dwelling construction
- Additions adding habitable space, garages, or carports
- Structural modifications — load-bearing wall alterations, roof conversions
- Finishing previously unfinished areas (basements, attics)
- Changing the use or occupancy of a space
- Any work regulated by the adopted building codes
Required documents
- RequiredBuilding Permit ApplicationApply online through the WVC building permit portal or in person at City Hall Suite 220
- RequiredComplete Plan Set (PDF)One PDF containing Civil/Site Plan, Architectural, Structural, Plumbing, Mechanical, and Electrical plans — do NOT separate trades. New SFD plans must be stamped by a Utah-licensed design professional per WVC FAQ.
- OptionalStructural CalculationsSealed by a licensed Utah PE for engineered design; required for new SFD and unusual construction per WVC FAQ
- RequiredEnergy Compliance DocumentsREScheck or equivalent demonstrating compliance with 2021 IRC Chapter 11 (per Utah State Amendments), per WVC apply page
- RequiredContractor Verification FormRequired prior to power clearance and certificate of occupancy — lists and verifies state license numbers for GC, electrical, plumbing, and mechanical subcontractors per WVC FAQ
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Residential Building Permit | Valuation-based — contact WVC Building Inspections at (801) 963-3283 for the current fee table; minimum $53 for small remodels | WVC Permit Costs & Fees page (wvc-ut.gov/307) does not publish a full valuation table; the basement remodel minimum is $53 with a square-footage example chart available at the permit counter. New construction fees are valuation-based. |
| Re-inspection Fee | $53 per occurrence | WVC Permit Costs & Fees page (wvc-ut.gov/307) |
Electrical Permit
VerifiedRequired for electrical work in West Valley City including panel upgrades, service changes, new circuits, and wiring installations. Governed by the 2023 National Electrical Code (NEC) as confirmed in WVC Design Criteria effective April 18, 2026.
Verified 2026-06-29 · Source
Requirements
- New electrical service or panel installation
- Electrical service upgrade (increase in amperage, or replacement due to damage, relocation, or worn equipment)
- New electrical circuits or wiring
- Adding or relocating outlets, switches, or fixtures
- Generator or solar panel electrical connections
Required documents
- RequiredPermit ApplicationApply at WVC Building Inspection Division; include mailing address of owner, exact address of residence, and licensed electrical contractor's name, state license number, address, and phone
- OptionalElectrical Plan / Single-Line DiagramRequired for service upgrades and new construction; panel schedule and circuit layout
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Electrical upgrade — less than 200 amp service | $53 | WVC Permit Costs & Fees page (wvc-ut.gov/307); confirmed on WVC Residential Electrical Service Upgrade page (wvc-ut.gov/302) |
| Electrical upgrade — 200 amps to 400 amps | $79.50 | WVC Permit Costs & Fees page (wvc-ut.gov/307); confirmed on WVC Residential Electrical Service Upgrade page (wvc-ut.gov/302) |
| Electrical upgrade — over 400 amps or over 600 volts | $95.40 | WVC Permit Costs & Fees page (wvc-ut.gov/307); confirmed on WVC Residential Electrical Service Upgrade page (wvc-ut.gov/302) |
| Re-inspection Fee | $53 per occurrence | WVC Permit Costs & Fees page (wvc-ut.gov/307) |
Mechanical / HVAC Permit
VerifiedRequired for furnace, air conditioning, and HVAC system installations and replacements in West Valley City. Governed by the 2024 International Mechanical Code (IMC) and 2024 International Fuel Gas Code (IFGC) per WVC Design Criteria effective April 18, 2026.
Verified 2026-06-29 · Source
Requirements
- Furnace installation or replacement
- Air conditioning system installation or replacement
- Ductwork installation or major modification
- Evaporative cooler installation
- Boiler or heat pump installation
- Baseboard heating equipment installation or replacement — per WVC Permit Requirements page
Required documents
- RequiredPermit ApplicationApply at WVC Building Inspection Division or online; BTU rating required for fee calculation
- OptionalEquipment SpecificationsManufacturer data sheets for furnace, AC, or heat pump
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Furnace only (0–150,000 BTUs) | $53 | WVC Permit Costs & Fees page (wvc-ut.gov/307) |
| Furnace (0–150,000 BTUs) and AC (1–8 tons) | $56.18 | WVC Permit Costs & Fees page (wvc-ut.gov/307) |
| Commercial HVAC — furnace (100,000–500,000 BTUs) and/or AC (9–41 tons) | $68.90 | WVC Permit Costs & Fees page (wvc-ut.gov/307) |
| Commercial HVAC — furnace (500,001–1,000,000 BTUs) and/or AC (42–83 tons) | $83.74 | WVC Permit Costs & Fees page (wvc-ut.gov/307) |
| Commercial HVAC — furnace (1,000,000–1,750,000 BTUs) | $102.82 | WVC Permit Costs & Fees page (wvc-ut.gov/307) |
| Commercial HVAC — furnace over 1,750,000 BTUs | $167.48 | WVC Permit Costs & Fees page (wvc-ut.gov/307) |
| Re-inspection Fee | $53 per occurrence | WVC Permit Costs & Fees page (wvc-ut.gov/307) |
Roofing Permit
VerifiedRequired for re-roofing, roof replacement, and roof conversion in West Valley City. Must comply with Section R907 of the 2021 International Residential Code. Roof conversions require a truss diagram and truss detail.
Verified 2026-06-29 · Source
Requirements
- Complete roof replacement (re-shingle, re-tar, or tar and gravel) — per WVC FAQ
- Roof conversion (change of roof type or structure) — per WVC FAQ
- Commercial re-roof
Required documents
- RequiredPermit ApplicationScope of work, square footage, material specifications; roofing contractor's current state license number must be verified at permit issuance
- OptionalTruss Diagram and Truss DetailRequired for roof conversions per WVC Building Inspections FAQ
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Roof re-shingle (residential) | $53 | WVC Permit Costs & Fees page (wvc-ut.gov/307); confirmed verbatim in WVC Building Inspections FAQ: 'The cost of a reroofing permit for a single family dwelling is $53.00' |
| Roof conversion | $111.30 | WVC Permit Costs & Fees page (wvc-ut.gov/307); confirmed verbatim in WVC Building Inspections FAQ: 'The permit fee is at present a flat fee of $111.30' |
| Commercial re-roof | $530 | WVC Permit Costs & Fees page (wvc-ut.gov/307) |
| Re-inspection Fee | $53 per occurrence | WVC Permit Costs & Fees page (wvc-ut.gov/307) |
Solar Panel Permit
VerifiedRequired for installation of rooftop solar photovoltaic systems on existing buildings in West Valley City. Only a licensed electrical contractor with an S200 license may pull this permit.
Verified 2026-06-29 · Source
Requirements
- Rooftop solar panel installation on existing building
- Battery storage system installation
- Electrical service upgrade for solar interconnection (may require separate electrical permit)
Required documents
- RequiredPermit ApplicationMust be pulled by a licensed electrical contractor with an S200 license per WVC Permit Costs & Fees page
- RequiredSolar Site Plan / Roof PlanPanel placement, setbacks, and access pathways on the roof
- RequiredElectrical Single-Line DiagramSystem wiring from panels to inverter to main panel and utility meter
- RequiredStructural AnalysisRoof load calculation confirming structure can support the panels
- RequiredEquipment SpecificationsData sheets for panels, inverter, and racking system
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Solar panels on top of existing building | $106 (+ Planning/Zoning fee if site review required) | WVC Permit Costs & Fees page (wvc-ut.gov/307), verbatim: 'Solar panels on top of existing building: $100 + 1.00 + 5.00 = $106 + P/Z if site review required. Only a licensed electrical contractor with an S200 license can pull a permit.' |
| Re-inspection Fee | $53 per occurrence | WVC Permit Costs & Fees page (wvc-ut.gov/307) |
Deck Permit
VerifiedRequired for decks and permanent platforms more than 30 inches above the surrounding ground in West Valley City, per WVC Permit Requirements page. Decks under 30 inches above grade are exempt from the building permit but location still requires Planning & Zoning approval.
Verified 2026-06-29 · Source
Requirements
- Decks or permanent platforms more than 30 inches above adjoining ground — per WVC Permit Requirements page
- Attached decks (ledger board connection to house)
- Structural modifications to existing decks
Required documents
- RequiredPermit ApplicationApply at WVC Building Inspection Division or online; scope of work required
- RequiredSite PlanShowing deck location with setbacks from property lines; Planning & Zoning approval for location required
- RequiredFraming Plan and DetailsBeam/joist sizes, post locations, footing details, and ledger attachment method for attached decks
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Deck permit (covered and uncovered) | $73 | WVC Permit Costs & Fees page (wvc-ut.gov/307), verbatim: 'Deck (covered and uncovered): $50 + 20 P/Z + .50 + 2.50 = $73' |
| Re-inspection Fee | $53 per occurrence | WVC Permit Costs & Fees page (wvc-ut.gov/307) |
Demolition Permit
VerifiedRequired for structural demolition in West Valley City. Requires coordinated pre-approvals from the Salt Lake City/County Health Department (asbestos), Utah State Division of Air Quality, all utility companies, and Dominion Energy before WVC will issue the permit.
Verified 2026-06-29 · Source
Requirements
- Complete demolition of any structure
- Partial demolition involving structural elements
Required documents
- RequiredDemolition Permit ApplicationMust be signed by the legal owner; if using a contractor, must include contractor company name, state license number, and signature
- RequiredAsbestos Survey / Air Quality ClearanceContact Asbestos Coordinator at Salt Lake City/County Health Department (385-468-3914). State-approved asbestos contractor must inspect. Utah State Division of Air Quality must notify WVC that no asbestos/hazardous materials exist before permit is issued.
- RequiredUtility Disconnect ConfirmationsAll utilities must be terminated by utility companies. Sewer/water: Granger Hunter Improvement District (801-968-3551). Utility companies notify WVC at (801) 963-3283 when all lines are terminated.
- RequiredDominion Energy ApprovalDominion Energy must confirm utility termination; WVC confirms receipt before issuing the permit
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Demolition permit | $53 per building | WVC Permit Costs & Fees page (wvc-ut.gov/307); confirmed verbatim in WVC FAQ: 'The cost of the demolition permit is $53' |
| Re-inspection Fee | $53 per occurrence | WVC Permit Costs & Fees page (wvc-ut.gov/307) |
Basement Finish Permit
Required for finishing or remodeling an unfinished basement in West Valley City, including framing, adding bedrooms, installing electrical circuits, plumbing, or HVAC. A separate Basement Entry permit applies for adding an exterior entrance.
Reviewed 2026-06-29 · Source
Requirements
- Framing walls in an unfinished basement
- Adding a bedroom (requires egress window)
- Adding a bathroom (plumbing permit also required)
- Electrical wiring for new rooms
- Structural modifications
- Finishing rooms or areas previously unfinished — per WVC Permit Requirements page
Required documents
- RequiredPermit Application with Floor PlanLayout showing room sizes, egress windows, door locations, and scope of work
- OptionalElectrical PlanCircuit layout, panel capacity, smoke/CO detector locations — required if adding electrical circuits
- OptionalPlumbing PlanRequired if adding bathroom, wet bar, or utility sink
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Basement Entry (adding exterior entrance to basement) | $86.12 | WVC Permit Costs & Fees page (wvc-ut.gov/307), verbatim: 'Basement Entry: 50 + 12.50 Review + 20 P/Z + .50 + 3.12 = $86.12' |
| Basement remodel (interior finish — based on square footage) | $53 minimum; see example chart at WVC Building Inspection Division | WVC Permit Costs & Fees page (wvc-ut.gov/307), verbatim: 'Basement remodel (based on square footage): $53 minimum — see example chart' |
| Re-inspection Fee | $53 per occurrence | WVC Permit Costs & Fees page (wvc-ut.gov/307) |
Swimming Pool Permit
VerifiedRequired for in-ground swimming pool installation and hot tub/spa installation in West Valley City. All pools must have a compliant barrier/fence per IRC Chapter 31. Hot Tubs, jacuzzis, saunas, and spas also require a permit per WVC Permit Requirements page.
Verified 2026-06-29 · Source
Requirements
- In-ground swimming pool construction
- Hot tubs, jacuzzis, saunas, or spas — per WVC Permit Requirements page
- Pool barrier/fence installation (required for all pools)
Required documents
- RequiredPool Plans and Site PlanPool dimensions, depth, equipment location, structural details, and pool location with setbacks from property lines
- RequiredBarrier PlanPool fence/barrier details meeting IRC Chapter 31 requirements
- RequiredElectrical PlanPool pump, lighting, bonding, and GFCI protection details per NEC Article 680
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Swimming Pool permit | $205.50 | WVC Permit Costs & Fees page (wvc-ut.gov/307), verbatim: 'Swimming Pool: $175 + 20 P/Z + 1.75 + 8.75 = $205.50' |
| Re-inspection Fee | $53 per occurrence | WVC Permit Costs & Fees page (wvc-ut.gov/307) |
Sources & verification
Key facts verified against official sources. Last reviewed 2026-06-29.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the West Valley City building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.