Skip to main content
PermitBase

This is PermitBase’s published record for West Valley City as of 2026-06-29. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.

West Valley City building permits

West Valley City, Utah — as published 2026-06-29.

Reviewed 2026-06-29 · Source

Codes adopted

2021 International Residential Code (IRC) — adopted by West Valley City; 2021 IRC Chapter 11 (Energy Efficiency) per Utah State Amendments; confirmed in WVC Design Criteria effective April 18, 20262024 International Building Code (IBC) — WVC Design Criteria effective April 18, 2026; consistent with Utah Code § 15A-2-103 effective July 1, 20262024 International Fire Code (IFC) — WVC Design Criteria effective April 18, 20262024 International Plumbing Code (IPC) — WVC Design Criteria effective April 18, 20262024 International Mechanical Code (IMC) — WVC Design Criteria effective April 18, 20262024 International Fuel Gas Code (IFGC) — WVC Design Criteria effective April 18, 20262024 International Energy Conservation Code (IECC); ASHRAE Standard 90.1-2016 (commercial energy) — WVC Design Criteria effective April 18, 20262023 National Electrical Code (NEC) — WVC Design Criteria effective April 18, 2026; Utah Code § 15A-2-103(1)(g)2009 ICC A117.1 Accessibility Standard — WVC Design Criteria effective April 18, 20262021 International Existing Building Code (IEBC) — adopted statewide per Utah Code § 15A-2-103; referenced in West Valley City Municipal Code Title 16 (Chapter 16-15)

Permit types & fees

Residential Building Permit

Required for new residential construction, additions, structural alterations, and finishing of previously unfinished space in West Valley City. Governed by the 2021 International Residential Code and WVC Municipal Code Title 16.

Reviewed 2026-06-29 · Source

Requirements

  • New single-family dwelling construction
  • Additions adding habitable space, garages, or carports
  • Structural modifications — load-bearing wall alterations, roof conversions
  • Finishing previously unfinished areas (basements, attics)
  • Changing the use or occupancy of a space
  • Any work regulated by the adopted building codes

Required documents

  • RequiredBuilding Permit ApplicationApply online through the WVC building permit portal or in person at City Hall Suite 220
  • RequiredComplete Plan Set (PDF)One PDF containing Civil/Site Plan, Architectural, Structural, Plumbing, Mechanical, and Electrical plans — do NOT separate trades. New SFD plans must be stamped by a Utah-licensed design professional per WVC FAQ.
  • OptionalStructural CalculationsSealed by a licensed Utah PE for engineered design; required for new SFD and unusual construction per WVC FAQ
  • RequiredEnergy Compliance DocumentsREScheck or equivalent demonstrating compliance with 2021 IRC Chapter 11 (per Utah State Amendments), per WVC apply page
  • RequiredContractor Verification FormRequired prior to power clearance and certificate of occupancy — lists and verifies state license numbers for GC, electrical, plumbing, and mechanical subcontractors per WVC FAQ

Fee schedule

Fee typeAmountNotes
Residential Building PermitValuation-based — contact WVC Building Inspections at (801) 963-3283 for the current fee table; minimum $53 for small remodelsWVC Permit Costs & Fees page (wvc-ut.gov/307) does not publish a full valuation table; the basement remodel minimum is $53 with a square-footage example chart available at the permit counter. New construction fees are valuation-based.
Re-inspection Fee$53 per occurrenceWVC Permit Costs & Fees page (wvc-ut.gov/307)

Electrical Permit

Verified

Required for electrical work in West Valley City including panel upgrades, service changes, new circuits, and wiring installations. Governed by the 2023 National Electrical Code (NEC) as confirmed in WVC Design Criteria effective April 18, 2026.

Verified 2026-06-29 · Source

Requirements

  • New electrical service or panel installation
  • Electrical service upgrade (increase in amperage, or replacement due to damage, relocation, or worn equipment)
  • New electrical circuits or wiring
  • Adding or relocating outlets, switches, or fixtures
  • Generator or solar panel electrical connections

Required documents

  • RequiredPermit ApplicationApply at WVC Building Inspection Division; include mailing address of owner, exact address of residence, and licensed electrical contractor's name, state license number, address, and phone
  • OptionalElectrical Plan / Single-Line DiagramRequired for service upgrades and new construction; panel schedule and circuit layout

Fee schedule

Fee typeAmountNotes
Electrical upgrade — less than 200 amp service$53WVC Permit Costs & Fees page (wvc-ut.gov/307); confirmed on WVC Residential Electrical Service Upgrade page (wvc-ut.gov/302)
Electrical upgrade — 200 amps to 400 amps$79.50WVC Permit Costs & Fees page (wvc-ut.gov/307); confirmed on WVC Residential Electrical Service Upgrade page (wvc-ut.gov/302)
Electrical upgrade — over 400 amps or over 600 volts$95.40WVC Permit Costs & Fees page (wvc-ut.gov/307); confirmed on WVC Residential Electrical Service Upgrade page (wvc-ut.gov/302)
Re-inspection Fee$53 per occurrenceWVC Permit Costs & Fees page (wvc-ut.gov/307)

Mechanical / HVAC Permit

Verified

Required for furnace, air conditioning, and HVAC system installations and replacements in West Valley City. Governed by the 2024 International Mechanical Code (IMC) and 2024 International Fuel Gas Code (IFGC) per WVC Design Criteria effective April 18, 2026.

Verified 2026-06-29 · Source

Requirements

  • Furnace installation or replacement
  • Air conditioning system installation or replacement
  • Ductwork installation or major modification
  • Evaporative cooler installation
  • Boiler or heat pump installation
  • Baseboard heating equipment installation or replacement — per WVC Permit Requirements page

Required documents

  • RequiredPermit ApplicationApply at WVC Building Inspection Division or online; BTU rating required for fee calculation
  • OptionalEquipment SpecificationsManufacturer data sheets for furnace, AC, or heat pump

Fee schedule

Fee typeAmountNotes
Furnace only (0–150,000 BTUs)$53WVC Permit Costs & Fees page (wvc-ut.gov/307)
Furnace (0–150,000 BTUs) and AC (1–8 tons)$56.18WVC Permit Costs & Fees page (wvc-ut.gov/307)
Commercial HVAC — furnace (100,000–500,000 BTUs) and/or AC (9–41 tons)$68.90WVC Permit Costs & Fees page (wvc-ut.gov/307)
Commercial HVAC — furnace (500,001–1,000,000 BTUs) and/or AC (42–83 tons)$83.74WVC Permit Costs & Fees page (wvc-ut.gov/307)
Commercial HVAC — furnace (1,000,000–1,750,000 BTUs)$102.82WVC Permit Costs & Fees page (wvc-ut.gov/307)
Commercial HVAC — furnace over 1,750,000 BTUs$167.48WVC Permit Costs & Fees page (wvc-ut.gov/307)
Re-inspection Fee$53 per occurrenceWVC Permit Costs & Fees page (wvc-ut.gov/307)

Roofing Permit

Verified

Required for re-roofing, roof replacement, and roof conversion in West Valley City. Must comply with Section R907 of the 2021 International Residential Code. Roof conversions require a truss diagram and truss detail.

Verified 2026-06-29 · Source

Requirements

  • Complete roof replacement (re-shingle, re-tar, or tar and gravel) — per WVC FAQ
  • Roof conversion (change of roof type or structure) — per WVC FAQ
  • Commercial re-roof

Required documents

  • RequiredPermit ApplicationScope of work, square footage, material specifications; roofing contractor's current state license number must be verified at permit issuance
  • OptionalTruss Diagram and Truss DetailRequired for roof conversions per WVC Building Inspections FAQ

Fee schedule

Fee typeAmountNotes
Roof re-shingle (residential)$53WVC Permit Costs & Fees page (wvc-ut.gov/307); confirmed verbatim in WVC Building Inspections FAQ: 'The cost of a reroofing permit for a single family dwelling is $53.00'
Roof conversion$111.30WVC Permit Costs & Fees page (wvc-ut.gov/307); confirmed verbatim in WVC Building Inspections FAQ: 'The permit fee is at present a flat fee of $111.30'
Commercial re-roof$530WVC Permit Costs & Fees page (wvc-ut.gov/307)
Re-inspection Fee$53 per occurrenceWVC Permit Costs & Fees page (wvc-ut.gov/307)

Solar Panel Permit

Verified

Required for installation of rooftop solar photovoltaic systems on existing buildings in West Valley City. Only a licensed electrical contractor with an S200 license may pull this permit.

Verified 2026-06-29 · Source

Requirements

  • Rooftop solar panel installation on existing building
  • Battery storage system installation
  • Electrical service upgrade for solar interconnection (may require separate electrical permit)

Required documents

  • RequiredPermit ApplicationMust be pulled by a licensed electrical contractor with an S200 license per WVC Permit Costs & Fees page
  • RequiredSolar Site Plan / Roof PlanPanel placement, setbacks, and access pathways on the roof
  • RequiredElectrical Single-Line DiagramSystem wiring from panels to inverter to main panel and utility meter
  • RequiredStructural AnalysisRoof load calculation confirming structure can support the panels
  • RequiredEquipment SpecificationsData sheets for panels, inverter, and racking system

Fee schedule

Fee typeAmountNotes
Solar panels on top of existing building$106 (+ Planning/Zoning fee if site review required)WVC Permit Costs & Fees page (wvc-ut.gov/307), verbatim: 'Solar panels on top of existing building: $100 + 1.00 + 5.00 = $106 + P/Z if site review required. Only a licensed electrical contractor with an S200 license can pull a permit.'
Re-inspection Fee$53 per occurrenceWVC Permit Costs & Fees page (wvc-ut.gov/307)

Deck Permit

Verified

Required for decks and permanent platforms more than 30 inches above the surrounding ground in West Valley City, per WVC Permit Requirements page. Decks under 30 inches above grade are exempt from the building permit but location still requires Planning & Zoning approval.

Verified 2026-06-29 · Source

Requirements

  • Decks or permanent platforms more than 30 inches above adjoining ground — per WVC Permit Requirements page
  • Attached decks (ledger board connection to house)
  • Structural modifications to existing decks

Required documents

  • RequiredPermit ApplicationApply at WVC Building Inspection Division or online; scope of work required
  • RequiredSite PlanShowing deck location with setbacks from property lines; Planning & Zoning approval for location required
  • RequiredFraming Plan and DetailsBeam/joist sizes, post locations, footing details, and ledger attachment method for attached decks

Fee schedule

Fee typeAmountNotes
Deck permit (covered and uncovered)$73WVC Permit Costs & Fees page (wvc-ut.gov/307), verbatim: 'Deck (covered and uncovered): $50 + 20 P/Z + .50 + 2.50 = $73'
Re-inspection Fee$53 per occurrenceWVC Permit Costs & Fees page (wvc-ut.gov/307)

Demolition Permit

Verified

Required for structural demolition in West Valley City. Requires coordinated pre-approvals from the Salt Lake City/County Health Department (asbestos), Utah State Division of Air Quality, all utility companies, and Dominion Energy before WVC will issue the permit.

Verified 2026-06-29 · Source

Requirements

  • Complete demolition of any structure
  • Partial demolition involving structural elements

Required documents

  • RequiredDemolition Permit ApplicationMust be signed by the legal owner; if using a contractor, must include contractor company name, state license number, and signature
  • RequiredAsbestos Survey / Air Quality ClearanceContact Asbestos Coordinator at Salt Lake City/County Health Department (385-468-3914). State-approved asbestos contractor must inspect. Utah State Division of Air Quality must notify WVC that no asbestos/hazardous materials exist before permit is issued.
  • RequiredUtility Disconnect ConfirmationsAll utilities must be terminated by utility companies. Sewer/water: Granger Hunter Improvement District (801-968-3551). Utility companies notify WVC at (801) 963-3283 when all lines are terminated.
  • RequiredDominion Energy ApprovalDominion Energy must confirm utility termination; WVC confirms receipt before issuing the permit

Fee schedule

Fee typeAmountNotes
Demolition permit$53 per buildingWVC Permit Costs & Fees page (wvc-ut.gov/307); confirmed verbatim in WVC FAQ: 'The cost of the demolition permit is $53'
Re-inspection Fee$53 per occurrenceWVC Permit Costs & Fees page (wvc-ut.gov/307)

Basement Finish Permit

Required for finishing or remodeling an unfinished basement in West Valley City, including framing, adding bedrooms, installing electrical circuits, plumbing, or HVAC. A separate Basement Entry permit applies for adding an exterior entrance.

Reviewed 2026-06-29 · Source

Requirements

  • Framing walls in an unfinished basement
  • Adding a bedroom (requires egress window)
  • Adding a bathroom (plumbing permit also required)
  • Electrical wiring for new rooms
  • Structural modifications
  • Finishing rooms or areas previously unfinished — per WVC Permit Requirements page

Required documents

  • RequiredPermit Application with Floor PlanLayout showing room sizes, egress windows, door locations, and scope of work
  • OptionalElectrical PlanCircuit layout, panel capacity, smoke/CO detector locations — required if adding electrical circuits
  • OptionalPlumbing PlanRequired if adding bathroom, wet bar, or utility sink

Fee schedule

Fee typeAmountNotes
Basement Entry (adding exterior entrance to basement)$86.12WVC Permit Costs & Fees page (wvc-ut.gov/307), verbatim: 'Basement Entry: 50 + 12.50 Review + 20 P/Z + .50 + 3.12 = $86.12'
Basement remodel (interior finish — based on square footage)$53 minimum; see example chart at WVC Building Inspection DivisionWVC Permit Costs & Fees page (wvc-ut.gov/307), verbatim: 'Basement remodel (based on square footage): $53 minimum — see example chart'
Re-inspection Fee$53 per occurrenceWVC Permit Costs & Fees page (wvc-ut.gov/307)

Swimming Pool Permit

Verified

Required for in-ground swimming pool installation and hot tub/spa installation in West Valley City. All pools must have a compliant barrier/fence per IRC Chapter 31. Hot Tubs, jacuzzis, saunas, and spas also require a permit per WVC Permit Requirements page.

Verified 2026-06-29 · Source

Requirements

  • In-ground swimming pool construction
  • Hot tubs, jacuzzis, saunas, or spas — per WVC Permit Requirements page
  • Pool barrier/fence installation (required for all pools)

Required documents

  • RequiredPool Plans and Site PlanPool dimensions, depth, equipment location, structural details, and pool location with setbacks from property lines
  • RequiredBarrier PlanPool fence/barrier details meeting IRC Chapter 31 requirements
  • RequiredElectrical PlanPool pump, lighting, bonding, and GFCI protection details per NEC Article 680

Fee schedule

Fee typeAmountNotes
Swimming Pool permit$205.50WVC Permit Costs & Fees page (wvc-ut.gov/307), verbatim: 'Swimming Pool: $175 + 20 P/Z + 1.75 + 8.75 = $205.50'
Re-inspection Fee$53 per occurrenceWVC Permit Costs & Fees page (wvc-ut.gov/307)

Sources & verification

Key facts verified against official sources. Last reviewed 2026-06-29.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the West Valley City building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-06-27)Later version (2026-07-01) →View current record →All versions →

Permalink: /utah/salt-lake-county/west-valley-city/as-of/2026-06-29/

Snapshot date: 2026-06-29

Commit: 80e281e

Reproducible from PermitBase’s version-controlled dataset, commit 80e281e.