Skip to main content
PermitBase

Version history — West Valley City, Utah

This is PermitBase’s own verified record for West Valley City, reconstructed from this dataset’s version-controlled history. Each version below reflects what our record stated as of that date — it is not a warranty of what West Valley City’s actual law was at that time.

Permanent link to today’s record

/utah/salt-lake-county/west-valley-city/as-of/2026-07-01/

Look up a specific date

Pick a date and we’ll show you the record as it stood then.

All versions

  • 2026-07-01Current record
    • West Valley City, Utah — Basement Finish Permit fee record added: Basement remodel (interior finish — based on square footage / project valuation) (Assessed as a standard building permit under the codified valuation-based fee table (WVC Municipal Code § 1-2-103(1)(a)(i)): $0–$500 value = $26; $501–$2,000 = $25 for the first $500 plus $4 per additional $100 (min $50); $2,001–$25,000 = $76 for the first $2,000 plus $16 per additional $1,000 (scaling upward per the same table for larger remodels). WVC's counter-facing quote is a $53 minimum with a square-footage example chart available in person.)
    • West Valley City, Utah — Residential Building Permit fee record updated: Valuation-based — contact WVC Building Inspections at (801) 963-3283 for the current fee table; minimum $53 for small remodels → Valuation-based per the codified fee table: $0–$500 value = $26; $501–$2,000 = $25 for the first $500 plus $4 per additional $100 (min $50); $2,001–$25,000 = $76 for the first $2,000 plus $16 per additional $1,000; $25,001–$50,000 = $430 for the first $25,000 plus $12.50 per additional $1,000; $50,001–$100,000 = $708 for the first $50,000 plus $9.50 per additional $1,000; $100,001–$500,000 = $1,094 for the first $100,000 plus $7.50 per additional $1,000; $500,001–$1,000,000 = $3,600 for the first $500,000 plus $6.50 per additional $1,000; over $1,000,000 = $6,000 for the first $1,000,000 plus $5.50 per additional $1,000. Plus a 1% state surcharge and 5% technology surcharge per building permit.
    • West Valley City, Utah — Basement Finish Permit fee record removed: Basement remodel (interior finish — based on square footage)
  • 2026-06-29Superseded
    • West Valley City, Utah — fee schedule re-verified across 9 permit types
    • West Valley City, Utah — permit-type records re-verified (27 updates)
  • 2026-06-27Initial record — coverage of West Valley City began