Skip to main content
PermitBase

You are viewing the permanent link for the record currently in effect, published 2026-07-01.

West Valley City building permits

Verified

West Valley City, Utah — as published 2026-07-01.

Verified 2026-07-01 · Source

Codes adopted

2021 International Residential Code (IRC) — adopted by West Valley City; 2021 IRC Chapter 11 (Energy Efficiency) per Utah State Amendments; confirmed in WVC Design Criteria effective April 18, 20262024 International Building Code (IBC) — WVC Design Criteria effective April 18, 2026; consistent with Utah Code § 15A-2-103 effective July 1, 20262024 International Fire Code (IFC) — WVC Design Criteria effective April 18, 20262024 International Plumbing Code (IPC) — WVC Design Criteria effective April 18, 20262024 International Mechanical Code (IMC) — WVC Design Criteria effective April 18, 20262024 International Fuel Gas Code (IFGC) — WVC Design Criteria effective April 18, 20262024 International Energy Conservation Code (IECC); ASHRAE Standard 90.1-2016 (commercial energy) — WVC Design Criteria effective April 18, 20262023 National Electrical Code (NEC) — WVC Design Criteria effective April 18, 2026; Utah Code § 15A-2-103(1)(g)2009 ICC A117.1 Accessibility Standard — WVC Design Criteria effective April 18, 20262021 International Existing Building Code (IEBC) — adopted statewide per Utah Code § 15A-2-103; referenced in West Valley City Municipal Code Title 16 (Chapter 16-15)

Permit types & fees

Residential Building Permit

Verified

Required for new residential construction, additions, structural alterations, and finishing of previously unfinished space in West Valley City. Governed by the 2021 International Residential Code and WVC Municipal Code Title 16.

Verified 2026-07-01 · Source

Requirements

  • New single-family dwelling construction
  • Additions adding habitable space, garages, or carports
  • Structural modifications — load-bearing wall alterations, roof conversions
  • Finishing previously unfinished areas (basements, attics)
  • Changing the use or occupancy of a space
  • Any work regulated by the adopted building codes

Required documents

  • RequiredBuilding Permit ApplicationApply online through the WVC building permit portal or in person at City Hall Suite 220
  • RequiredComplete Plan Set (PDF)One PDF containing Civil/Site Plan, Architectural, Structural, Plumbing, Mechanical, and Electrical plans — do NOT separate trades. New SFD plans must be stamped by a Utah-licensed design professional per WVC FAQ.
  • OptionalStructural CalculationsSealed by a licensed Utah PE for engineered design; required for new SFD and unusual construction per WVC FAQ
  • RequiredEnergy Compliance DocumentsREScheck or equivalent demonstrating compliance with 2021 IRC Chapter 11 (per Utah State Amendments), per WVC apply page
  • RequiredContractor Verification FormRequired prior to power clearance and certificate of occupancy — lists and verifies state license numbers for GC, electrical, plumbing, and mechanical subcontractors per WVC FAQ

Fee schedule

Fee typeAmountNotes
Residential Building PermitValuation-based per the codified fee table: $0–$500 value = $26; $501–$2,000 = $25 for the first $500 plus $4 per additional $100 (min $50); $2,001–$25,000 = $76 for the first $2,000 plus $16 per additional $1,000; $25,001–$50,000 = $430 for the first $25,000 plus $12.50 per additional $1,000; $50,001–$100,000 = $708 for the first $50,000 plus $9.50 per additional $1,000; $100,001–$500,000 = $1,094 for the first $100,000 plus $7.50 per additional $1,000; $500,001–$1,000,000 = $3,600 for the first $500,000 plus $6.50 per additional $1,000; over $1,000,000 = $6,000 for the first $1,000,000 plus $5.50 per additional $1,000. Plus a 1% state surcharge and 5% technology surcharge per building permit.Grounded in West Valley City Municipal Code § 1-2-103(1)(a)(i) (Consolidated Fee Schedule, Community and Economic Development Dept — Building Inspection Division), derived from the 1997 Uniform Administrative Code, last amended by Ord. No. 22-03 (02/01/2022) — official codified source at westvalleycity.municipal.codes/Code/1-2 (chapter 1-2). The WVC Permit Costs & Fees page (wvc-ut.gov/307) summarizes this as 'valuation-based' without reprinting the table; the counter-quoted $53 minimum for small remodels reflects current administrative practice consistent with the code's minimum-fee structure. Valuation-based fee assessed per this published, codified table = verified.
Re-inspection Fee$53 per occurrenceWVC Permit Costs & Fees page (wvc-ut.gov/307)

Electrical Permit

Verified

Required for electrical work in West Valley City including panel upgrades, service changes, new circuits, and wiring installations. Governed by the 2023 National Electrical Code (NEC) as confirmed in WVC Design Criteria effective April 18, 2026. EV charger/EVSE installation is electrical work and falls under this general Electrical Permit; the WVC Permit Costs & Fees page lists only amperage-tiered electrical-upgrade fees ($53/$79.50/$95.40) with no separate EV-specific line item.

Verified 2026-06-29 · Source

Requirements

  • New electrical service or panel installation
  • Electrical service upgrade (increase in amperage, or replacement due to damage, relocation, or worn equipment)
  • New electrical circuits or wiring
  • Adding or relocating outlets, switches, or fixtures
  • Generator or solar panel electrical connections

Required documents

  • RequiredPermit ApplicationApply at WVC Building Inspection Division; include mailing address of owner, exact address of residence, and licensed electrical contractor's name, state license number, address, and phone
  • OptionalElectrical Plan / Single-Line DiagramRequired for service upgrades and new construction; panel schedule and circuit layout

Fee schedule

Fee typeAmountNotes
Electrical upgrade — less than 200 amp service$53WVC Permit Costs & Fees page (wvc-ut.gov/307); confirmed on WVC Residential Electrical Service Upgrade page (wvc-ut.gov/302)
Electrical upgrade — 200 amps to 400 amps$79.50WVC Permit Costs & Fees page (wvc-ut.gov/307); confirmed on WVC Residential Electrical Service Upgrade page (wvc-ut.gov/302)
Electrical upgrade — over 400 amps or over 600 volts$95.40WVC Permit Costs & Fees page (wvc-ut.gov/307); confirmed on WVC Residential Electrical Service Upgrade page (wvc-ut.gov/302)
Re-inspection Fee$53 per occurrenceWVC Permit Costs & Fees page (wvc-ut.gov/307)

EV Charger / EVSE Permit

Verified

West Valley City has not published a distinct EV-charger permit or fee. EV charger/EVSE installation is electrical work filed under the city's general Electrical Permit; the WVC Permit Costs & Fees page lists only amperage-tiered electrical-upgrade fees ($53 under 200 amps / $79.50 for 200-400 amps / $95.40 over 400 amps or over 600 volts) with no separate EV-specific line item.

Verified 2026-07-20 · Source

Requirements

  • Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property, filed as a standard Electrical Permit
  • New electrical circuit or service upgrade to serve the charger

Required documents

  • RequiredPermit ApplicationApply at WVC Building Inspection Division; include mailing address of owner, exact address of residence, and licensed electrical contractor's name, state license number, address, and phone. No dedicated EV-charger application exists.
  • OptionalElectrical Plan / Single-Line DiagramRequired for service upgrades; panel schedule and circuit layout showing the EV charger circuit

Fee schedule

Fee typeAmountNotes
Electrical upgrade — less than 200 amp service$53WVC Permit Costs & Fees page (wvc-ut.gov/307); confirmed on WVC Residential Electrical Service Upgrade page (wvc-ut.gov/302). No distinct EV-charger line item is published.
Electrical upgrade — 200 amps to 400 amps$79.50WVC Permit Costs & Fees page (wvc-ut.gov/307).
Electrical upgrade — over 400 amps or over 600 volts$95.40WVC Permit Costs & Fees page (wvc-ut.gov/307).
Re-inspection Fee$53 per occurrenceWVC Permit Costs & Fees page (wvc-ut.gov/307)

Mechanical / HVAC Permit

Verified

Required for furnace, air conditioning, and HVAC system installations and replacements in West Valley City. Governed by the 2024 International Mechanical Code (IMC) and 2024 International Fuel Gas Code (IFGC) per WVC Design Criteria effective April 18, 2026.

Verified 2026-06-29 · Source

Requirements

  • Furnace installation or replacement
  • Air conditioning system installation or replacement
  • Ductwork installation or major modification
  • Evaporative cooler installation
  • Boiler or heat pump installation
  • Baseboard heating equipment installation or replacement — per WVC Permit Requirements page

Required documents

  • RequiredPermit ApplicationApply at WVC Building Inspection Division or online; BTU rating required for fee calculation
  • OptionalEquipment SpecificationsManufacturer data sheets for furnace, AC, or heat pump

Fee schedule

Fee typeAmountNotes
Furnace only (0–150,000 BTUs)$53WVC Permit Costs & Fees page (wvc-ut.gov/307)
Furnace (0–150,000 BTUs) and AC (1–8 tons)$56.18WVC Permit Costs & Fees page (wvc-ut.gov/307)
Commercial HVAC — furnace (100,000–500,000 BTUs) and/or AC (9–41 tons)$68.90WVC Permit Costs & Fees page (wvc-ut.gov/307)
Commercial HVAC — furnace (500,001–1,000,000 BTUs) and/or AC (42–83 tons)$83.74WVC Permit Costs & Fees page (wvc-ut.gov/307)
Commercial HVAC — furnace (1,000,000–1,750,000 BTUs)$102.82WVC Permit Costs & Fees page (wvc-ut.gov/307)
Commercial HVAC — furnace over 1,750,000 BTUs$167.48WVC Permit Costs & Fees page (wvc-ut.gov/307)
Re-inspection Fee$53 per occurrenceWVC Permit Costs & Fees page (wvc-ut.gov/307)

Roofing Permit

Verified

Required for re-roofing, roof replacement, and roof conversion in West Valley City. Must comply with Section R907 of the 2021 International Residential Code. Roof conversions require a truss diagram and truss detail.

Verified 2026-06-29 · Source

Requirements

  • Complete roof replacement (re-shingle, re-tar, or tar and gravel) — per WVC FAQ
  • Roof conversion (change of roof type or structure) — per WVC FAQ
  • Commercial re-roof

Required documents

  • RequiredPermit ApplicationScope of work, square footage, material specifications; roofing contractor's current state license number must be verified at permit issuance
  • OptionalTruss Diagram and Truss DetailRequired for roof conversions per WVC Building Inspections FAQ

Fee schedule

Fee typeAmountNotes
Roof re-shingle (residential)$53WVC Permit Costs & Fees page (wvc-ut.gov/307); confirmed verbatim in WVC Building Inspections FAQ: 'The cost of a reroofing permit for a single family dwelling is $53.00'
Roof conversion$111.30WVC Permit Costs & Fees page (wvc-ut.gov/307); confirmed verbatim in WVC Building Inspections FAQ: 'The permit fee is at present a flat fee of $111.30'
Commercial re-roof$530WVC Permit Costs & Fees page (wvc-ut.gov/307)
Re-inspection Fee$53 per occurrenceWVC Permit Costs & Fees page (wvc-ut.gov/307)

Solar Panel Permit

Verified

Required for installation of rooftop solar photovoltaic systems on existing buildings in West Valley City. Only a licensed electrical contractor with an S200 license may pull this permit.

Verified 2026-06-29 · Source

Requirements

  • Rooftop solar panel installation on existing building
  • Battery storage system installation
  • Electrical service upgrade for solar interconnection (may require separate electrical permit)

Required documents

  • RequiredPermit ApplicationMust be pulled by a licensed electrical contractor with an S200 license per WVC Permit Costs & Fees page
  • RequiredSolar Site Plan / Roof PlanPanel placement, setbacks, and access pathways on the roof
  • RequiredElectrical Single-Line DiagramSystem wiring from panels to inverter to main panel and utility meter
  • RequiredStructural AnalysisRoof load calculation confirming structure can support the panels
  • RequiredEquipment SpecificationsData sheets for panels, inverter, and racking system

Fee schedule

Fee typeAmountNotes
Solar panels on top of existing building$106 (+ Planning/Zoning fee if site review required)WVC Permit Costs & Fees page (wvc-ut.gov/307), verbatim: 'Solar panels on top of existing building: $100 + 1.00 + 5.00 = $106 + P/Z if site review required. Only a licensed electrical contractor with an S200 license can pull a permit.'
Re-inspection Fee$53 per occurrenceWVC Permit Costs & Fees page (wvc-ut.gov/307)

Deck Permit

Verified

Required for decks and permanent platforms more than 30 inches above the surrounding ground in West Valley City, per WVC Permit Requirements page. Decks under 30 inches above grade are exempt from the building permit but location still requires Planning & Zoning approval.

Verified 2026-06-29 · Source

Requirements

  • Decks or permanent platforms more than 30 inches above adjoining ground — per WVC Permit Requirements page
  • Attached decks (ledger board connection to house)
  • Structural modifications to existing decks

Required documents

  • RequiredPermit ApplicationApply at WVC Building Inspection Division or online; scope of work required
  • RequiredSite PlanShowing deck location with setbacks from property lines; Planning & Zoning approval for location required
  • RequiredFraming Plan and DetailsBeam/joist sizes, post locations, footing details, and ledger attachment method for attached decks

Fee schedule

Fee typeAmountNotes
Deck permit (covered and uncovered)$73WVC Permit Costs & Fees page (wvc-ut.gov/307), verbatim: 'Deck (covered and uncovered): $50 + 20 P/Z + .50 + 2.50 = $73'
Re-inspection Fee$53 per occurrenceWVC Permit Costs & Fees page (wvc-ut.gov/307)

Demolition Permit

Verified

Required for structural demolition in West Valley City. Requires coordinated pre-approvals from the Salt Lake City/County Health Department (asbestos), Utah State Division of Air Quality, all utility companies, and Dominion Energy before WVC will issue the permit.

Verified 2026-06-29 · Source

Requirements

  • Complete demolition of any structure
  • Partial demolition involving structural elements

Required documents

  • RequiredDemolition Permit ApplicationMust be signed by the legal owner; if using a contractor, must include contractor company name, state license number, and signature
  • RequiredAsbestos Survey / Air Quality ClearanceContact Asbestos Coordinator at Salt Lake City/County Health Department (385-468-3914). State-approved asbestos contractor must inspect. Utah State Division of Air Quality must notify WVC that no asbestos/hazardous materials exist before permit is issued.
  • RequiredUtility Disconnect ConfirmationsAll utilities must be terminated by utility companies. Sewer/water: Granger Hunter Improvement District (801-968-3551). Utility companies notify WVC at (801) 963-3283 when all lines are terminated.
  • RequiredDominion Energy ApprovalDominion Energy must confirm utility termination; WVC confirms receipt before issuing the permit

Fee schedule

Fee typeAmountNotes
Demolition permit$53 per buildingWVC Permit Costs & Fees page (wvc-ut.gov/307); confirmed verbatim in WVC FAQ: 'The cost of the demolition permit is $53'
Re-inspection Fee$53 per occurrenceWVC Permit Costs & Fees page (wvc-ut.gov/307)

Basement Finish Permit

Verified

Required for finishing or remodeling an unfinished basement in West Valley City, including framing, adding bedrooms, installing electrical circuits, plumbing, or HVAC. A separate Basement Entry permit applies for adding an exterior entrance.

Verified 2026-07-01 · Source

Requirements

  • Framing walls in an unfinished basement
  • Adding a bedroom (requires egress window)
  • Adding a bathroom (plumbing permit also required)
  • Electrical wiring for new rooms
  • Structural modifications
  • Finishing rooms or areas previously unfinished — per WVC Permit Requirements page

Required documents

  • RequiredPermit Application with Floor PlanLayout showing room sizes, egress windows, door locations, and scope of work
  • OptionalElectrical PlanCircuit layout, panel capacity, smoke/CO detector locations — required if adding electrical circuits
  • OptionalPlumbing PlanRequired if adding bathroom, wet bar, or utility sink

Fee schedule

Fee typeAmountNotes
Basement Entry (adding exterior entrance to basement)$86.12WVC Permit Costs & Fees page (wvc-ut.gov/307), verbatim: 'Basement Entry: 50 + 12.50 Review + 20 P/Z + .50 + 3.12 = $86.12'
Basement remodel (interior finish — based on square footage / project valuation)Assessed as a standard building permit under the codified valuation-based fee table (WVC Municipal Code § 1-2-103(1)(a)(i)): $0–$500 value = $26; $501–$2,000 = $25 for the first $500 plus $4 per additional $100 (min $50); $2,001–$25,000 = $76 for the first $2,000 plus $16 per additional $1,000 (scaling upward per the same table for larger remodels). WVC's counter-facing quote is a $53 minimum with a square-footage example chart available in person.Grounded in West Valley City Municipal Code § 1-2-103(1)(a)(i) (Consolidated Fee Schedule), last amended Ord. No. 22-03 (02/01/2022) — official codified source at westvalleycity.municipal.codes/Code/1-2. WVC does not maintain a separate basement-specific fee table; a basement interior finish is priced as a standard building permit against project valuation/square footage, same as new construction. The WVC Permit Costs & Fees page (wvc-ut.gov/307) restates this informally as '$53 minimum — see example chart' (in-person only, not published online in chart form). Valuation-based fee assessed per this published, codified table = verified.
Re-inspection Fee$53 per occurrenceWVC Permit Costs & Fees page (wvc-ut.gov/307)

Swimming Pool Permit

Verified

Required for in-ground swimming pool installation and hot tub/spa installation in West Valley City. All pools must have a compliant barrier/fence per IRC Chapter 31. Hot Tubs, jacuzzis, saunas, and spas also require a permit per WVC Permit Requirements page.

Verified 2026-06-29 · Source

Requirements

  • In-ground swimming pool construction
  • Hot tubs, jacuzzis, saunas, or spas — per WVC Permit Requirements page
  • Pool barrier/fence installation (required for all pools)

Required documents

  • RequiredPool Plans and Site PlanPool dimensions, depth, equipment location, structural details, and pool location with setbacks from property lines
  • RequiredBarrier PlanPool fence/barrier details meeting IRC Chapter 31 requirements
  • RequiredElectrical PlanPool pump, lighting, bonding, and GFCI protection details per NEC Article 680

Fee schedule

Fee typeAmountNotes
Swimming Pool permit$205.50WVC Permit Costs & Fees page (wvc-ut.gov/307), verbatim: 'Swimming Pool: $175 + 20 P/Z + 1.75 + 8.75 = $205.50'
Re-inspection Fee$53 per occurrenceWVC Permit Costs & Fees page (wvc-ut.gov/307)

Commercial Building Permit

Required for new commercial construction (shell buildings and ground-up commercial projects) in West Valley City, regulated by the state-adopted 2024 IBC, 2024 IMC, 2024 IFGC, 2024 IECC + ASHRAE 90.1-2016, 2023 NEC, 2024 IFC, and 2024 IPC per the city's Design Criteria (effective April 18, 2026). West Valley City's Permit Costs & Fees page (wvc-ut.gov/307) does not publish a flat or valuation-based fee line item for commercial building permits — only flat fees for specific residential project types and BTU-based Commercial HVAC fees appear there. Confidence is 'partial' because the commercial building-permit fee could not be verified from the city's own published fee schedule as of 2026-07-19.

Reviewed 2026-07-19 · Source

Requirements

  • New commercial building construction (shell or ground-up)
  • Site plan and structural engineering plans
  • Compliance with the 2024 IBC, 2024 IMC, 2024 IFGC, 2024 IECC + ASHRAE 90.1-2016, 2023 NEC, 2024 IFC, and 2024 IPC (WVC Design Criteria, effective April 18, 2026)
  • Contractor license number or Owner-Builder Certification Form

Required documents

  • RequiredSpecial Inspector Letter of CompliancePer IBC 1704.2.4, required for closeout of new commercial construction, per the WVC Commercial Certificate of Occupancy Checklist.
  • RequiredFinal Letter from the Structural EngineerPer IBC 1704.6, confirming structural work was completed per approved plans.
  • RequiredAs-Built DrawingsPer the WVC Commercial Certificate of Occupancy Checklist.
  • RequiredHVAC Balance ReportPer IMC 403.3.1.5.
  • RequiredPotable Water Chlorine/Bacteria Test Report (Third-Party)Per IPC 610.1.
  • OptionalUtah State Boiler Inspector ApprovalRequired only if the building includes a boiler.
  • OptionalUtah State Elevator ApprovalRequired only if the building includes an elevator.

Fee schedule

Fee typeAmountNotes
Commercial Building Permit FeeNot published on wvc-ut.gov/307/Permit-Costs-FeesWVC Permit Costs & Fees page lists only flat fees for specific residential project types (deck $73, basement entry $86.12, swimming pool $205.50, etc.) and BTU-based Commercial HVAC fees; no commercial building-permit or valuation-based fee line item exists on the page as of 2026-07-19. Contact the Commercial Plans Examiner, Casey White, at (801) 963-3316 for a project-specific fee quote.

Sign Permit

Verified

Required in West Valley City before erecting, constructing, reconstructing, enlarging, locating, or altering most signs, per West Valley City Municipal Code § 11-2-104: 'It shall be unlawful for any person...to erect, construct, reconstruct, enlarge, locate or alter any sign within the City contrary to any provisions of this Title, and/or where required, without first obtaining approval for a sign permit from the City.' West Valley City publishes two distinct, real fee tracks: a Building-side 'Sign permits' fee based on sign valuation with a $150 minimum, and a separate Planning-side 'Sign review' fee that varies by sign type (wall, pole/monument, billboard).

Verified 2026-07-20 · Source

Requirements

  • Sign permit required before erecting, constructing, reconstructing, enlarging, locating, or altering a sign, except as exempted, per § 11-2-104
  • All signs must comply with the current National Electrical Code, International Building Code, Title 11 (Sign Ordinance), and the Zoning Ordinance, per § 11-2-102
  • Application must be accompanied by a site plan (property lines/street frontage, existing and proposed buildings, curb cuts, parking, existing sign locations/sizes, landscaping) and an elevation drawing (sign type, materials/colors/lighting, height, dimensions, and building height/width for wall signs), per § 11-2-106
  • Where a new development is contemplated, the sign site plan/elevation information must be submitted with the development application, per § 11-2-106
  • Every sign must be kept in good repair and properly maintained by the owner, including a 10-foot radius around any ground sign's base kept free of weeds, rubbish, and flammable material, per § 11-2-103
  • Where sign work requiring a permit is started before the permit is obtained, all fees that should have been charged are doubled, per § 11-2-107
  • Certain sign types are exempt from the permit requirement (but not the rest of Title 11): property signs, permanent entry signs, plate signs, temporary signs, and public necessity signs, per § 11-2-108
  • Other sign types are exempt from Title 11 entirely (but not from the building permit process where otherwise applicable): governmental/legally-required signs, signs being manufactured/transported/stored (not used for advertising at that location), signs not visible from the property boundary (malls, courts, arcades, porches, patios), signs on licensed commercial vehicles (not parked as stationary display within 40 ft of a street right-of-way), signs on regulated public transportation vehicles, non-commercial art/art forms, searchlights, and signs carried by a person, per § 11-2-109

Required documents

  • RequiredSign Permit Application with Site Plan and Elevation DrawingSite plan (property lines, street frontage, existing/proposed buildings, curb cuts, parking, existing sign locations/sizes, landscaping) plus elevation drawing (sign type, materials/colors/lighting, height, dimensions, building height/width for wall signs), per § 11-2-106.

Fee schedule

Fee typeAmountNotes
Sign Permit Fee (Building)Fee based on sign valuation, $150 minimum chargeWest Valley City Municipal Code § 1-2-103, Consolidated Fee Schedule, Building fees list: 'Sign permits– Fee based on sign valuation, $150 minimum charge.'
Sign Review — Wall Sign (Planning)$50West Valley City Municipal Code § 1-2-103, Consolidated Fee Schedule, Planning fees, 'Sign review' subsection: 'Wall sign– $50.' This is a separate zoning-compliance review fee from the Building-side sign permit fee above.
Sign Review — Pole/Monument Sign (Planning)$100West Valley City Municipal Code § 1-2-103, Consolidated Fee Schedule, 'Sign review' subsection: 'Pole/monument– $100.'
Sign Review — Billboard (Planning)$250West Valley City Municipal Code § 1-2-103, Consolidated Fee Schedule, 'Sign review' subsection: 'Billboard– $250.'
Sign Impound Fee$50West Valley City Municipal Code § 1-2-103, Consolidated Fee Schedule: 'Sign impound fee– $50.'
Penalty — Work Started Before Permit Obtained2x the fees that should have been chargedWest Valley City Municipal Code § 11-2-107: 'Where work for which a permit is required by this Title is initiated prior to obtaining said permit, all fees that should have been charged shall be doubled.'

Commercial Tenant Improvement / Tenant Finish Permit

Required for commercial remodel and tenant-improvement work in West Valley City. As with new commercial construction, the Permit Costs & Fees page (wvc-ut.gov/307) publishes no tenant-improvement-specific or valuation-based fee line item, and no fee-tier split between new-commercial-shell and tenant-improvement work (unlike some neighboring Utah cities) was found on wvc-ut.gov. Confidence is 'partial' because the fee could not be verified from the city's own published schedule as of 2026-07-19.

Reviewed 2026-07-19 · Source

Requirements

  • Commercial remodel or tenant-improvement scope
  • Site plan and structural/architectural plans as applicable to the scope of work
  • Compliance with the 2024 IBC and WVC Design Criteria (effective April 18, 2026)
  • Contractor license number or Owner-Builder Certification Form

Required documents

  • OptionalSpecial Inspector Letter of CompliancePer IBC 1704.2.4, required for closeout where special inspections apply, per the WVC Commercial Certificate of Occupancy Checklist.
  • OptionalFinal Letter from the Structural EngineerPer IBC 1704.6, required where structural work is part of the scope.
  • RequiredAs-Built DrawingsPer the WVC Commercial Certificate of Occupancy Checklist.
  • OptionalHVAC Balance ReportPer IMC 403.3.1.5, required where HVAC work is part of the scope.

Fee schedule

Fee typeAmountNotes
Commercial Tenant Improvement Permit FeeNot published on wvc-ut.gov/307/Permit-Costs-FeesWVC Permit Costs & Fees page lists no tenant-improvement or commercial-remodel line item as of 2026-07-19, and no fee-tier split between new commercial shell and tenant improvement (unlike Pleasant Grove, UT's $500/$250 split) was found on wvc-ut.gov. Contact the Commercial Plans Examiner, Casey White, at (801) 963-3316, for a project-specific fee quote.

Fire Sprinkler & Fire Alarm Permit

Verified

Required by the West Valley City Fire Prevention & Inspections Division before installing automatic fire sprinkler/gas suppression systems, fire alarm systems, standpipes, fire pumps, or other automatic fire suppression systems (hood and duct, dry chemical). This is a separate plan-review/permit fee from the general Building Permit, codified with per-system, tiered fee tables at West Valley City Municipal Code § 1-2-105(1), which implements International Fire Code (IFC) 105.6 in the city's own Fire Department fee schedule.

Verified 2026-07-22 · Source

Requirements

  • Installation of a new automatic fire sprinkler or gas suppression system (IFC 105.6.1) — fee tiered by number of sprinkler heads per system
  • Installation of a new fire alarm system (IFC 105.6.6) — fee tiered by number of devices per system
  • Installation of an automatic fire suppression system other than sprinklers — hood and duct systems, dry chemical, and others (IFC 105.6.1)
  • Installation of a standpipe system (IFC 105.6.23)
  • Installation of a fire pump (IFC 105.6.7)
  • Fire apparatus access road, fire water supply, or fire hydrant site plan review (IFC 501.2), where applicable to the project
  • Plans, specifications, and calculations must be submitted to and reviewed by the WVC Fire Prevention & Inspections Division before the system is installed

Required documents

  • RequiredFire Sprinkler / Suppression System Plans and Hydraulic CalculationsRequired for automatic fire sprinkler, gas suppression, or other automatic suppression system installations per IFC 105.6.1
  • RequiredFire Alarm System Plans and SpecificationsRequired for new fire alarm system installations per IFC 105.6.6
  • OptionalSite Plan (Fire Apparatus Access, Water Supply, Hydrants)Required where the project scope includes fire apparatus access roads, fire water supply, or fire hydrants per IFC 501.2

Fee schedule

Fee typeAmountNotes
Fire sprinkler / gas suppression system — 1 to 100 sprinklers (per system)$150West Valley City Municipal Code § 1-2-105(1)(a)(i), implementing IFC 105.6.1
Fire sprinkler / gas suppression system — 101 to 200 sprinklers (per system)$250West Valley City Municipal Code § 1-2-105(1)(a)(ii)
Fire sprinkler / gas suppression system — 201 to 300 sprinklers (per system)$300West Valley City Municipal Code § 1-2-105(1)(a)(iii)
Fire sprinkler / gas suppression system — more than 300 sprinklers (per system)$200 + $0.50 per sprinklerWest Valley City Municipal Code § 1-2-105(1)(a)(iv)
Fire alarm system — 1 to 150 devices (per system)$150West Valley City Municipal Code § 1-2-105(1)(e)(i), implementing IFC 105.6.6
Fire alarm system — 151 to 250 devices (per system)$250West Valley City Municipal Code § 1-2-105(1)(e)(ii)
Fire alarm system — 251 to 400 devices (per system)$400West Valley City Municipal Code § 1-2-105(1)(e)(iii)
Fire alarm system — more than 400 devices (per system)$300 + $0.50 per deviceWest Valley City Municipal Code § 1-2-105(1)(e)(iv)
Automatic fire suppression — hood and duct, dry chemical, and other systems (per system)$150West Valley City Municipal Code § 1-2-105(1)(b), implementing IFC 105.6.1
Standpipe systems$180West Valley City Municipal Code § 1-2-105(1)(c), implementing IFC 105.6.23
Fire pumps$180West Valley City Municipal Code § 1-2-105(1)(d), implementing IFC 105.6.7
Site plan review (fire apparatus access roads, fire water supply, fire hydrants)$160West Valley City Municipal Code § 1-2-105(1)(f), implementing IFC 501.2
Fire inspection fee (per required inspection on the permits above)$75West Valley City Municipal Code § 1-2-105(3)(a), implementing IFC 108.2.2
Rejected plan resubmittal25% of the cost of a new applicationWest Valley City Municipal Code § 1-2-105(1)(m), implementing IFC 105.2.4
Civil penalty — failure to obtain a required fire permit, or occupancy before Fire Marshal approvalDouble the cost of the permitWest Valley City Municipal Code § 1-2-105(4)(c) and (4)(e), implementing IFC 105.1.1/901.3 and IFC 105.3.3/901.5.1

Change of Use / Certificate of Occupancy Permit

Verified

West Valley City does not sell a separate, individually-priced 'change of use permit' product. Per Municipal Code § 7-1-108(3), the use of land or a structure may not be commenced or changed except upon issuance of a written Use Permit by the Community and Economic Development Department (agricultural and animal-keeping uses are exempted). For single-family dwellings, 'changing the use of a room or area' is explicitly listed on the WVC Permit Requirements page as an activity that requires a standard residential Building Permit rather than a distinct product. For non-single-family uses, the Planning & Zoning Division's codified 'Permitted use' review ($350) is the closest standalone fee product to a change-of-use approval; a Certificate of Occupancy (or Certificate of Completion) is then issued at project closeout per the WVC Commercial Certificate of Occupancy Checklist, with no separate CO fee published anywhere in the full Community and Economic Development fee schedule (§ 1-2-103) as confirmed live on 2026-07-22.

Verified 2026-07-22 · Source

Requirements

  • A written Use Permit from the Community and Economic Development Department is required before commencing or changing the use of land or a structure, per § 7-1-108(3) — except land used for agricultural purposes or the keeping/raising of animals
  • For single-family dwellings, changing the use of a room or area (e.g. converting a garage to habitable space) requires a standard residential Building Permit per the WVC Permit Requirements page — it is not a distinct 'change of use' product
  • For commercial/tenant space, a change in occupancy classification is reviewed through the Commercial Building Permit or Commercial Tenant Improvement Permit process for IBC/IEBC compliance, not as a standalone change-of-use permit
  • A Certificate of Occupancy requires a passing final inspection from both the WVC Building Inspection Division and the WVC Fire Marshal before the space may be occupied
  • The Structure or land shall not be used for any use not identified within the zone where the property exists, per § 7-1-108(2)

Required documents

  • RequiredPermitted Use Application (Planning & Zoning)Application to Community and Economic Development Department confirming the proposed use is permitted in the applicable zone, per § 7-1-108(3) and the § 1-2-103(2)(i) fee line item
  • RequiredAs-Built DrawingsRequired for Certificate of Occupancy issuance per the WVC Commercial Certificate of Occupancy Checklist
  • RequiredContractor Verification FormRequired prior to power clearance and issuance of any Certificate of Occupancy per WVC Building Inspections FAQ
  • OptionalSpecial Inspector Letter of Compliance / Final Structural Engineer LetterRequired for CO issuance where special inspections or structural work applied to the project (IBC 1704.2.4, IBC 1704.6), per the WVC Commercial Certificate of Occupancy Checklist
  • OptionalHVAC Balance ReportRequired for CO issuance where HVAC work was part of the project scope (IMC 403.3.1.5), per the WVC Commercial Certificate of Occupancy Checklist

Fee schedule

Fee typeAmountNotes
Permitted Use review (Planning & Zoning, excluding single-family dwellings)$350West Valley City Municipal Code § 1-2-103(2)(i), Consolidated Fee Schedule, Planning and Zoning Division: 'Permitted use (excluding single-family dwellings) – $350.' This is the codified fee product that implements the § 7-1-108(3) Use Permit requirement for non-SFD uses.
Zoning Determination Letter (lower-cost alternative to confirm zoning compliance)$35West Valley City Municipal Code § 1-2-103(2)(q): 'Zoning determination letter – $35.' Confirm with Planning & Zoning (801-963-3282) whether your specific tenant/use change requires the full $350 Permitted Use review or only this letter.
Certificate of Occupancy issuanceNo standalone fee publishedThe Certificate of Occupancy is issued as a closeout step of the underlying Building Permit, Commercial Building Permit, or Commercial Tenant Improvement Permit at no separate charge. Confirmed against the full, live-fetched Community and Economic Development Consolidated Fee Schedule (§ 1-2-103, all Building Inspection Division and Planning and Zoning Division line items) on 2026-07-22 — no distinct 'certificate of occupancy' or 'change of use' fee line item exists anywhere in that schedule.
Civil penalty — occupancy before approvalDouble the cost of the required permitWest Valley City Municipal Code § 1-2-105(4)(e), implementing IFC 105.3.3 and 901.5.1: 'Occupancy before approval ... double the cost of the required permit.'

Sources & verification

Verified against official sources. Last reviewed 2026-07-01.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the West Valley City building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-06-29)View current record →All versions →

Permalink: /utah/salt-lake-county/west-valley-city/as-of/2026-07-01/

Snapshot date: 2026-07-01

Commit: 9d25784

Reproducible from PermitBase’s version-controlled dataset, commit 9d25784.