This is PermitBase’s published record for Coalville as of 2026-07-20. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.

Coalville building permits

Verified

Coalville, Utah — as published 2026-07-20.

Verified 2026-07-08 · Source

Codes adopted

2024 International Building Code (IBC) — current statewide-adopted edition per Utah Code § 15A-2-103(1)(a) (Utah Uniform Building Standard Act), effective 2026-07-01, superseded the 2021 edition (which was itself effective July 1, 2023). Coalville's Building Permit Fees resolution (Res. 2025-1) references the IBC directly for commercial structures and does not codify a separate local building-code chapter, consistent with the statewide adoption model.2021 International Residential Code (IRC) — current statewide-adopted edition per Utah Code § 15A-2-103(1)(b); unaffected by the 7/1/2026 statute revision, continues in force. Coalville's Fee Schedule (Res. 2025-1, Building Permit Fees section) references the IRC directly for residential structures.2024 International Plumbing Code (IPC) — current statewide-adopted edition per Utah Code § 15A-2-103(1)(d), effective 2026-07-01, superseded the 2021 edition. Coalville's Fee Schedule references the IPC for commercial plumbing permit fee calculation.2024 International Mechanical Code (IMC) — current statewide-adopted edition per Utah Code § 15A-2-103(1)(e), effective 2026-07-01, superseded the 2021 edition. Coalville's Fee Schedule references the IMC for commercial mechanical permit fee calculation.2023 National Electrical Code (NEC) — current statewide-adopted edition per Utah Code § 15A-2-103(1)(g); unaffected by the 7/1/2026 statute revision, continues in force. Coalville's Fee Schedule references the NEC for commercial electrical permit fee calculation.2024 International Energy Conservation Code (IECC) with Utah amendments — current statewide-adopted edition per Utah Code § 15A-2-103(1)(h), effective 2026-07-01, superseded the 2021 edition.NOTE: Effective July 1, 2026 (now in force), the 2024 editions of IBC, IPC, IMC, and IECC replaced the 2021 editions statewide per Utah Code § 15A-2-103 (version effective 7/1/2026, superseded 1/1/2027; text independently re-verified live at le.utah.gov 2026-07-16). The 2021 IRC and 2023 NEC were unaffected and remain in force. This file's codesAdopted list does not carry separate line items for the International Fuel Gas Code, International Existing Building Code, or International Swimming Pool and Spa Code (residential provisions) — all three are also statewide-adopted per Utah Code § 15A-2-103(1)(f)/(i)/(n) at the 2024 edition effective 2026-07-01, but no Coalville-specific citation for them was located this session; this is a pre-existing completeness gap in this file, not addressed further here.

Permit types & fees

Residential Building Permit

Verified

Required for new single-family and two-family residential construction and any work regulated by the statewide-adopted 2021 IRC. Coalville's Building Permit Fees (Resolution 2025-1) use a valuation-based fee table with the city's own Building Valuation Data method (higher of actual contractor-reported cost per sq ft or the ICC Building Valuation Data Sheet published in the Building Safety Journal).

Verified 2026-07-08 · Source

Requirements

  • New single-family or two-family residential construction
  • Any work regulated by the statewide-adopted 2021 IRC
  • Planning and Zoning, Public Works, and North Summit Fire District sign-offs obtained prior to building permit issuance
  • Scaled site plan (minimum 1" = 20') showing property lines, easements, rights of way, setbacks, driveway dimensions/paving, water/sewer tie-ins, grading, and structure height — per Coalville's Building Permit Application Review Procedures
  • Three complete sets of legible plans (two physical sets min. 18"x24", one electronic set emailed to cityhall@coalvillecity.org), including a Building Code Analysis cover page, structural plans, elevations, floor plans, footing/foundation drawings, roofing/truss layout, electrical layout, plumbing plan, mechanical heat-loss (Manual J/D) calculations, and a ResCheck energy compliance report, stamped and signed by the engineer or architect of record

Required documents

  • RequiredCoalville City Building Permit ApplicationOfficial two-sided application form listing owner/contractor/subcontractor information, project valuation, and a fee breakdown line (Building Fee, Plan Review, Electrical, Plumbing, HVAC, Water, Sewer, Demolition, State 1% surcharge) with Zoning, Public Works, Building, and North Summit Fire District approval sign-off blocks.
  • RequiredBuilding Permit Application Review ProceduresOfficial Coalville City checklist detailing plan submittal requirements: site plan, application completeness, three plan sets, code-analysis cover page, structural/elevation/floor plans, footing/foundation details, roofing/truss layout, electrical/plumbing/mechanical plans, and ResCheck energy compliance.
  • OptionalOwner Builder AffidavitRequired form for property owners acting as their own general contractor.
  • RequiredEngineering Standards and Construction SpecificationsCoalville City's published engineering design and construction specification standards, referenced for infrastructure and site work associated with new residential construction.

Fee schedule

Fee typeAmountNotes
Building Permit Fee (valuation-based, Resolution 2025-1, effective 05/27/2025)Less than $2,000: $24 for the first $500 plus $3.50 per additional $100 (or fraction) to $2,000. $2,001–$25,000: $76.50 for the first $2,000 plus $16.50 per additional $1,000 (or fraction) to $25,000. $25,001–$50,000: $456 for the first $25,000 plus $10.10 per additional $1,000. $50,001–$100,000: $756 for the first $50,000 plus $8.50 per additional $1,000. $100,001–$500,000: $1,181 for the first $100,000 plus $6.50 per additional $1,000. $500,001–$1,000,000: $3,781 for the first $500,000 plus $5.50 per additional $1,000. $1,000,001 and up: $6,531 for the first $1,000,000 plus $4.50 per additional $1,000.
Coalville City Fee Schedule (Resolution 2025-1, effective 05/27/2025), 'BUILDING PERMIT FEES' section, item 2 fee table. Show full citation

Coalville City Fee Schedule (Resolution 2025-1, effective 05/27/2025), 'BUILDING PERMIT FEES' section, item 2 fee table. Building Valuation (item 1) is the higher of actual contractor-reported construction cost per sq ft, or the ICC Building Valuation Data Sheet (Building Safety Journal, updated biannually); residential structures valued per the IRC. A 1% Utah State surcharge (per UCA § 58-54-9-3, as amended) applies to all permits in addition to these fees.

Plan Review Fee (residential)65% of the Building Permit Fee
Coalville City Fee Schedule, 'BUILDING PERMIT FEES' section, item 3(c): 'Residential Structures: 65% of building permit fee.' (Detached garages with no living space, decks/porches for existing… Show full citation

Coalville City Fee Schedule, 'BUILDING PERMIT FEES' section, item 3(c): 'Residential Structures: 65% of building permit fee.' (Detached garages with no living space, decks/porches for existing structures, and accessory buildings are charged a reduced 15% plan-review rate per item 3(d).)

Plumbing Permit

Verified

Required for plumbing installations and alterations in Coalville. Fee is a $10 issuance charge plus a per-square-foot system fee, per the city's official fee schedule.

Verified 2026-07-08 · Source

Requirements

  • New plumbing fixture installations or system work regulated by the statewide-adopted IRC (residential) or IPC (commercial)
  • Water heater installation or replacement
  • Water line, sewer line, or gas line installation or modification

Required documents

  • RequiredCoalville City Building Permit ApplicationSame application form used for all Coalville permit types, includes a Plumbing fee line item.

Fee schedule

Fee typeAmountNotes
Plumbing Permit Fee (residential)$10 issuance fee plus $0.035 per square footCoalville City Fee Schedule (Resolution 2025-1), 'BUILDING PERMIT FEES' section, item 4: 'Permit Issuance Fee: $10' plus (System Fee, does not include issuance fee) 'iii. Residential Structures per the IRC: $0.035 per square foot.'

Mechanical / HVAC Permit

Verified

Required for HVAC installations, replacements, and ductwork modifications in Coalville. Fee is a $10 issuance charge plus a per-square-foot system fee, per the city's official fee schedule.

Verified 2026-07-08 · Source

Requirements

  • Furnace, boiler, or air conditioning installation or replacement regulated by the statewide-adopted IRC (residential) or IMC (commercial)
  • Ductwork installation or major modification

Required documents

  • RequiredCoalville City Building Permit ApplicationSame application form used for all Coalville permit types, includes an HVAC fee line item.

Fee schedule

Fee typeAmountNotes
Mechanical Permit Fee (residential)$10 issuance fee plus $0.035 per square footCoalville City Fee Schedule (Resolution 2025-1), 'BUILDING PERMIT FEES' section, item 5: 'Permit Issuance Fee: $10, plus $0.035 per square foot' with System Fee 'iii. Residential Structures per the IRC: $0.035 per square foot plus $10.'

Electrical Permit

Verified

Required for electrical work in Coalville, including service upgrades. Fee is a $10 issuance charge plus a per-square-foot system fee, per the city's official fee schedule. EV charger/EVSE installation is electrical work and falls under this general Electrical Permit; the Fee Schedule (Resolution 2025-1) does not publish an EV-specific line item — a charger circuit would be billed under the same $10 issuance fee plus per-square-foot/service-upgrade structure as other electrical work.

Verified 2026-07-08 · Source

Requirements

  • New electrical circuits, wiring installations, or service upgrades regulated by the statewide-adopted NEC
  • Electrical panel or service entrance changes

Required documents

  • RequiredCoalville City Building Permit ApplicationSame application form used for all Coalville permit types, includes an Electrical fee line item.

Fee schedule

Fee typeAmountNotes
Electrical Permit Fee (residential)$10 issuance fee plus $0.035 per square footCoalville City Fee Schedule (Resolution 2025-1), 'BUILDING PERMIT FEES' section, item 6: 'Permit Issuance Fee: $10' plus (System Fee, does not include issuance fee) 'iii. Residential Structures per the IRC: $0.035 per square foot plus $10.'

Solar / Alternative Energy Permit

Verified

Required for residential rooftop solar photovoltaic and other alternative energy installations (geothermal, solar hot water, wind generator) in Coalville. Fees are separate from new-construction permits and based on 50% of the actual permit cost, with flat minimums by system type.

Verified 2026-07-08 · Source

Requirements

  • Alternative Energy Permits are issued separately from permits for new construction
  • Applies to solar hot water, photovoltaic, geothermal, and wind-generated power systems

Required documents

  • RequiredCoalville City Building Permit ApplicationSame application form used for all Coalville permit types.

Fee schedule

Fee typeAmountNotes
Photovoltaic System Fee$350
Coalville City Fee Schedule (Resolution 2025-1), 'BUILDING PERMIT FEES' section, item 7(a): 'Photovoltaic System: $350.' Alternative Energy Permits are based on 50% of the actual permit cost per item 7's lead-in text; Show full citation

Coalville City Fee Schedule (Resolution 2025-1), 'BUILDING PERMIT FEES' section, item 7(a): 'Photovoltaic System: $350.' Alternative Energy Permits are based on 50% of the actual permit cost per item 7's lead-in text; Permit Issuance is an additional 10% of the review fee per item 7(e).

Geo-Thermal System Fee$250Coalville City Fee Schedule (Resolution 2025-1), item 7(b): 'Geo-Thermal: $250.'
Solar Hot Water System Fee$125Coalville City Fee Schedule (Resolution 2025-1), item 7(c): 'Solar Hot Water: $125.'
Wind Generator System Fee$125Coalville City Fee Schedule (Resolution 2025-1), item 7(d): 'Wind Generator: $125.'

Demolition Permit

Verified

Required for demolition of existing structures in Coalville. Flat fee per the city's official fee schedule; a separate state notification form is also required.

Verified 2026-07-08 · Source

Requirements

  • Demolition of any building or structure within Coalville City limits
  • State of Utah Demolition Notification Form required in addition to the city permit

Required documents

  • RequiredDemolition Permit (Coalville City)City-specific demolition permit application, listed on the Building Department's Forms page.
  • RequiredDemolition Notification Form - State of UtahState-level demolition notification form required in addition to the city permit, listed on the Building Department's Forms page.

Fee schedule

Fee typeAmountNotes
Demolition Permit Fee$400Coalville City Fee Schedule (Resolution 2025-1), 'BUILDING PERMIT FEES' section, item 9: 'Demolition Permit: $400.'

Commercial Building Permit

Verified

Required for new commercial construction in Coalville, regulated by the statewide-adopted 2024 IBC (Utah Code § 15A-2-103(1)(a), effective 2026-07-01). Building Valuation is per the IBC occupancy/construction type (ICC Building Valuation Data Sheet) or actual contractor-reported cost, whichever is higher, run through the same valuation-based Building Permit Fee table used for residential structures (Resolution 2025-1). Plan Review is billed at 65% of the Building Permit Fee, the same rate applied to residential structures.

Verified 2026-07-19 · Source

Requirements

  • New commercial construction regulated by the statewide-adopted 2024 IBC
  • Planning and Zoning, Public Works, and North Summit Fire District sign-offs obtained prior to building permit issuance
  • Scaled site plan (minimum 1" = 20') showing property lines, easements, rights of way, setbacks, driveway dimensions/paving, water/sewer tie-ins, grading, and structure height — per Coalville's Building Permit Application Review Procedures, which explicitly states 'new residential or commercial construction plans cannot be hand drawn'
  • Three complete sets of legible plans (two physical sets min. 18"x24", one electronic set emailed to cityhall@coalvillecity.org), including a Building Code Analysis cover page listing occupancy, building type, square footage, structure height, and fire suppression/fire-resistance ratings where required, structural plans, elevations, floor plans, footing/foundation drawings, roofing/truss layout, electrical layout, plumbing plan, and mechanical heat-loss (Manual J/D) calculations, stamped and signed by the engineer or architect of record

Required documents

  • RequiredCoalville City Building Permit ApplicationOfficial two-sided application form listing owner/contractor/subcontractor information, project valuation, and a fee breakdown line (Building Fee, Plan Review, Electrical, Plumbing, HVAC, Water, Sewer, Demolition, State 1% surcharge) with Zoning, Public Works, Building, and North Summit Fire District approval sign-off blocks; used for both residential and commercial permit types.
  • RequiredBuilding Permit Application Review ProceduresOfficial Coalville City checklist detailing plan submittal requirements for both residential and commercial construction: site plan, application completeness, three plan sets, code-analysis cover page, structural/elevation/floor plans, footing/foundation details, roofing/truss layout, electrical/plumbing/mechanical plans.
  • RequiredEngineering Standards and Construction SpecificationsCoalville City's published engineering design and construction specification standards, referenced for infrastructure and site work associated with new commercial construction.

Fee schedule

Fee typeAmountNotes
Building Permit Fee (valuation-based, Resolution 2025-1, effective 05/27/2025)Less than $2,000: $24 for the first $500 plus $3.50 per additional $100 (or fraction) to $2,000. $2,001–$25,000: $76.50 for the first $2,000 plus $16.50 per additional $1,000 (or fraction) to $25,000. $25,001–$50,000: $456 for the first $25,000 plus $10.10 per additional $1,000. $50,001–$100,000: $756 for the first $50,000 plus $8.50 per additional $1,000. $100,001–$500,000: $1,181 for the first $100,000 plus $6.50 per additional $1,000. $500,001–$1,000,000: $3,781 for the first $500,000 plus $5.50 per additional $1,000. $1,000,001 and up: $6,531 for the first $1,000,000 plus $4.50 per additional $1,000.
Coalville City Fee Schedule (Resolution 2025-1, effective 05/27/2025), 'BUILDING PERMIT FEES' section, item 2: 'Building Permit Fees ... Show full citation

Coalville City Fee Schedule (Resolution 2025-1, effective 05/27/2025), 'BUILDING PERMIT FEES' section, item 2: 'Building Permit Fees ... b. Non-Agricultural: i. Commercial structures built per the IBC ... Fees in accordance with Coalville City Building Permit Fees' — this is the same valuation-based fee table used for residential structures (item 2's table is not split by structure type). Building Valuation (item 1(b)(i)) for commercial structures is 'per the International Building Code (IBC)' — the higher of actual contractor-reported construction cost, or the ICC Building Valuation Data Sheet (Building Safety Journal, updated biannually) rate for the applicable occupancy/construction type. A 1% Utah State surcharge (UCA § 58-54-9-3, as amended) applies to all permits in addition to these fees.

Plan Review Fee (commercial)65% of the Building Permit Fee
Coalville City Fee Schedule, 'BUILDING PERMIT FEES' section, item 3(b): 'Commercial Structures: 65% of building permit fee.' Identical rate to residential structures (item 3(c)); Show full citation

Coalville City Fee Schedule, 'BUILDING PERMIT FEES' section, item 3(b): 'Commercial Structures: 65% of building permit fee.' Identical rate to residential structures (item 3(c)); the reduced 15% rate under item 3(d) applies only to detached garages with no living space, decks/porches for existing structures, and accessory buildings — not general commercial construction.

Commercial Tenant Improvement / Tenant Finish Permit

Required for interior remodel and tenant-finish work in existing commercial structures in Coalville, regulated by the statewide-adopted 2024 IBC. Coalville's Fee Schedule (Resolution 2025-1) does not publish a dedicated 'Tenant Improvement' line item or a TI-specific submittal checklist; the only applicable valuation provision is item 1(c), 'Remodels and Basement finishes: Valuation based on 50% of sq. ft. values from above,' applied to the commercial (IBC) per-square-foot rate and then run through the same Building Permit Fee table used for new construction, with Plan Review billed at the standard 65% commercial rate.

Reviewed 2026-07-19 · Source

Requirements

  • Interior remodel or tenant-finish work in an existing commercial structure, regulated by the statewide-adopted 2024 IBC
  • Planning and Zoning, Public Works, and North Summit Fire District sign-offs obtained prior to building permit issuance, per Coalville's general permit sign-off requirement (no TI-specific exemption from this requirement is published)
  • Coalville's only published plan-submittal checklist (Building Permit Application Review Procedures) is written for new residential/commercial construction generally and is not scoped down for interior-only tenant-finish work; applicants should confirm with the Building Official (435-640-1799) which elements (e.g., full site plan) can be waived for interior-only scope

Required documents

  • RequiredCoalville City Building Permit ApplicationSame application form used for all Coalville permit types, including a fee breakdown line and Zoning/Public Works/Building/Fire District sign-off blocks.
  • OptionalBuilding Permit Application Review ProceduresCoalville City's only published plan-submittal checklist; written for new construction generally and not scoped specifically to interior tenant-improvement work — no separate TI checklist is published.

Fee schedule

Fee typeAmountNotes
Building Valuation (Remodel/Tenant Finish, Resolution 2025-1)50% of the applicable per-square-foot commercial (IBC) valuation rate
Coalville City Fee Schedule (Resolution 2025-1), 'BUILDING PERMIT FEES' section, item 1(c): 'Remodels and Basement finishes: Valuation based on 50% of sq. Show full citation

Coalville City Fee Schedule (Resolution 2025-1), 'BUILDING PERMIT FEES' section, item 1(c): 'Remodels and Basement finishes: Valuation based on 50% of sq. ft. values from above.' The Fee Schedule does not separately label this provision as applying to 'Tenant Improvement' work by name, and does not distinguish residential-remodel from commercial-remodel/TI within item 1(c) — it is the only published valuation basis for interior commercial remodel/tenant-finish work found in the schedule.

Building Permit Fee (valuation-based, Resolution 2025-1)Same valuation-based table as new construction (see commercial-building-permit entry): e.g. $1,181 for the first $100,000 of valuation plus $6.50 per additional $1,000, to $500,000.Coalville City Fee Schedule, item 2 table — the resulting 50%-of-rate remodel valuation (item 1(c)) is run through this same table; no separate reduced-fee table exists for remodels/TI.
Plan Review Fee (commercial remodel/TI)65% of the Building Permit Fee
Coalville City Fee Schedule, item 3(b): 'Commercial Structures: 65% of building permit fee.' No reduced plan-review rate applies to general commercial remodels/tenant improvements — the 15% reduced… Show full citation

Coalville City Fee Schedule, item 3(b): 'Commercial Structures: 65% of building permit fee.' No reduced plan-review rate applies to general commercial remodels/tenant improvements — the 15% reduced rate under item 3(d) is limited to detached garages with no living space, decks/porches for existing structures, and accessory buildings.

Sign Permit

Verified

Coalville City charges a distinct, flat Sign Permit fee of $75 per sign as a Community Development (Planning) Fee, per the Coalville City Fee Schedule (Resolution No. 2024-1, effective 01/08/24, carried forward unchanged into the Resolution No. 2025-1 update presented to the City Council on March 24, 2025). Re-chased 2026-07-20: the Development Code Chapter 27 (Sign Regulations), hosted on Municode Library (library.municode.com/ut/coalville), was successfully retrieved via a reader-proxy fetch with an extended JS-render wait (the platform is a slow-loading Angular SPA that a plain fetch could not render, but rendered fully once given roughly 20 seconds). Section 27-020 (Permit Requirements) lists the required application contents; Section 27-030 (Approval) states the City must approve, approve-with-conditions, or deny a sign permit within thirty (30) days of a complete submittal — Coalville's only city-published sign-permit review-timeline figure; Section 27-050 (Permitted Signs) sets detailed size/height/materials standards by sign type (freestanding, monument, wall, etc.).

Verified 2026-07-20 · Source

Requirements

  • A Sign Permit is required from Coalville City's Community Development Department before erecting, constructing, altering, or relocating any sign other than exempt signs (Development Code Section 27-070); routine maintenance/repair that doesn't change dimensions, height, message, or copy is not an 'alteration' requiring a new permit, per Section 27-020
  • Sign permit application must include: applicant/owner/occupant name, address, phone; location of the structure/parcel; the sign's position relative to nearby buildings, property lines, rights-of-way, sidewalks, and streets; plans/specs showing materials and construction method (including supports, illumination, wiring); a colored rendering of the sign face/colors/surfaces/copy to scale; the installer's name and contact info; written consent from the property owner; and, for temporary signs, the earliest installation date and required removal date — per Development Code Section 27-020
  • The Community Development Director (or designated planning staff) must approve, approve with conditions, or deny a complete sign permit application within thirty (30) days of submittal, per Development Code Section 27-030
  • Permit fee (per the City's Fee Schedule, $75/sign) is due prior to issuance, for each sign permitted, per Development Code Section 27-030(B)
  • Freestanding signs: one per primary vehicular access, max 75 sq ft display area for a single use (100 sq ft for a multi-use parcel), max height 20 ft, min 3 ft setback from right-of-way, natural/wood materials (plastic/Lexan only for individual letters or internally-illuminated cabinets), indirect/internal illumination only — per Section 27-050(A)
  • Monument signs: up to 2 per parcel (one per separate primary vehicular access), max 32 sq ft display area, max height 8 ft, stone/stone-veneer/textured-concrete/weather-resistant-wood base, min 3 ft setback — per Section 27-050(B)
  • Building (wall) signs: primary wall sign capped at 1 sq ft per linear foot of building facade frontage up to 50 sq ft max (24 sq ft flat cap if no exterior street-facing exposure); secondary wall sign capped at half the primary wall sign's permitted size — per Section 27-050(C)
  • Off-premises signs and certain electronic/changeable-copy signs are prohibited citywide except as specifically allowed (Highway Commercial Zone exceptions under Section 27-050(E)/(F)), per Development Code Section 27-060

Required documents

  • RequiredSign Permit ApplicationApplication submitted to Coalville City's Community Development Department per Development Code Section 27-020, including applicant/owner contact info, sign location and position relative to nearby buildings/property lines/rights-of-way, construction plans and specifications, a colored to-scale rendering of the sign face, the installer's contact info, written property-owner consent, and (for temporary signs) installation and removal dates.

Fee schedule

Fee typeAmountNotes
Sign Permit$75 per sign
Coalville City Fee Schedule, Community Development (Planning) Fees, item 16: 'Sign Permit: $75/sign.' Confirmed via a March 24, 2025 City Council staff report (Attachment A, 'track changes' fee… Show full citation

Coalville City Fee Schedule, Community Development (Planning) Fees, item 16: 'Sign Permit: $75/sign.' Confirmed via a March 24, 2025 City Council staff report (Attachment A, 'track changes' fee schedule update to Resolution No. 2025-1); the Sign Permit line is shown in unmarked (non-redlined) text, meaning it was unchanged from the original Resolution No. 2024-1 fee schedule, effective 01/08/24. Development Code Section 27-030(B) confirms the fee is due for each sign permitted, prior to permit issuance.

EV Charger / EVSE Permit

Coalville City does not publish a distinct "EV Charger" or "EVSE" fee line item. Its Fee Schedule (Resolution 2025-1) prices electrical permits by structure type and square footage rather than by equipment: a flat $10 Permit Issuance Fee plus a System Fee of $0.035 per square foot for residential structures (per the IRC), or the same rate for commercial structures (per the National Electric Code). A full-text search of the current fee schedule found no mention of "EV," "EVSE," "electric vehicle," or "charging station." Because the published System Fee is scaled to overall structure square footage rather than scope of electrical work, it is not confirmed how a single added EV-charger circuit would be billed relative to a full-structure electrical permit; the $10 flat Permit Issuance Fee is the only clearly applicable minimum figure.

Reviewed 2026-07-20 · Source

Requirements

  • Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property within Coalville City
  • Dedicated 240V circuit and/or panel capacity installed by a licensed electrician
  • Electrical permit filed with Coalville City for the added circuit

Required documents

  • RequiredElectrical Permit ApplicationFiled with Coalville City for the electrical work associated with the charger installation.

Fee schedule

Fee typeAmountNotes
Electrical Permit Fee — Permit Issuance Fee (base fee; no distinct EV charger line item)$10Coalville City Fee Schedule (Resolution 2025-1), 'ELECTRICAL PERMIT FEES' section, item 6a: 'Permit Issuance Fee: $10.'
Electrical Permit Fee — System Fee (residential structures per IRC; scaled to structure square footage, not itemized per circuit/EV charger)$0.035 per square foot (does not include the $10 issuance fee)
Coalville City Fee Schedule (Resolution 2025-1), 'ELECTRICAL PERMIT FEES' section, item 6(b)(iii): 'Residential Structures per the IRC: $0.035 per square foot plus $10.' No EV/EVSE line item or… Show full citation

Coalville City Fee Schedule (Resolution 2025-1), 'ELECTRICAL PERMIT FEES' section, item 6(b)(iii): 'Residential Structures per the IRC: $0.035 per square foot plus $10.' No EV/EVSE line item or added-circuit-only rate is published; how this square-footage-based fee applies to a standalone charger circuit (versus a whole-structure electrical permit) is not explicitly confirmed.

Sources & verification

Verified against official sources. Last reviewed 2026-07-08.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Coalville building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-07-19)Later version (2026-07-22) →View current record →All versions →

Permalink: /utah/summit-county-ut/coalville/as-of/2026-07-20/

Snapshot date: 2026-07-20

Commit: 6181c07

Reproducible from PermitBase’s version-controlled dataset, commit 6181c07.