This is PermitBase’s published record for Coalville as of 2026-07-19. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.
Coalville building permits
VerifiedCoalville, Utah — as published 2026-07-19.
Verified 2026-07-08 · Source
Codes adopted
Permit types & fees
Residential Building Permit
VerifiedRequired for new single-family and two-family residential construction and any work regulated by the statewide-adopted 2021 IRC. Coalville's Building Permit Fees (Resolution 2025-1) use a valuation-based fee table with the city's own Building Valuation Data method (higher of actual contractor-reported cost per sq ft or the ICC Building Valuation Data Sheet published in the Building Safety Journal).
Verified 2026-07-08 · Source
Requirements
- New single-family or two-family residential construction
- Any work regulated by the statewide-adopted 2021 IRC
- Planning and Zoning, Public Works, and North Summit Fire District sign-offs obtained prior to building permit issuance
- Scaled site plan (minimum 1" = 20') showing property lines, easements, rights of way, setbacks, driveway dimensions/paving, water/sewer tie-ins, grading, and structure height — per Coalville's Building Permit Application Review Procedures
- Three complete sets of legible plans (two physical sets min. 18"x24", one electronic set emailed to cityhall@coalvillecity.org), including a Building Code Analysis cover page, structural plans, elevations, floor plans, footing/foundation drawings, roofing/truss layout, electrical layout, plumbing plan, mechanical heat-loss (Manual J/D) calculations, and a ResCheck energy compliance report, stamped and signed by the engineer or architect of record
Required documents
- RequiredCoalville City Building Permit ApplicationOfficial two-sided application form listing owner/contractor/subcontractor information, project valuation, and a fee breakdown line (Building Fee, Plan Review, Electrical, Plumbing, HVAC, Water, Sewer, Demolition, State 1% surcharge) with Zoning, Public Works, Building, and North Summit Fire District approval sign-off blocks.
- RequiredBuilding Permit Application Review ProceduresOfficial Coalville City checklist detailing plan submittal requirements: site plan, application completeness, three plan sets, code-analysis cover page, structural/elevation/floor plans, footing/foundation details, roofing/truss layout, electrical/plumbing/mechanical plans, and ResCheck energy compliance.
- OptionalOwner Builder AffidavitRequired form for property owners acting as their own general contractor.
- RequiredEngineering Standards and Construction SpecificationsCoalville City's published engineering design and construction specification standards, referenced for infrastructure and site work associated with new residential construction.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee (valuation-based, Resolution 2025-1, effective 05/27/2025) | Less than $2,000: $24 for the first $500 plus $3.50 per additional $100 (or fraction) to $2,000. $2,001–$25,000: $76.50 for the first $2,000 plus $16.50 per additional $1,000 (or fraction) to $25,000. $25,001–$50,000: $456 for the first $25,000 plus $10.10 per additional $1,000. $50,001–$100,000: $756 for the first $50,000 plus $8.50 per additional $1,000. $100,001–$500,000: $1,181 for the first $100,000 plus $6.50 per additional $1,000. $500,001–$1,000,000: $3,781 for the first $500,000 plus $5.50 per additional $1,000. $1,000,001 and up: $6,531 for the first $1,000,000 plus $4.50 per additional $1,000. | Coalville City Fee Schedule (Resolution 2025-1, effective 05/27/2025), 'BUILDING PERMIT FEES' section, item 2 fee table. Show full citationHideCoalville City Fee Schedule (Resolution 2025-1, effective 05/27/2025), 'BUILDING PERMIT FEES' section, item 2 fee table. Building Valuation (item 1) is the higher of actual contractor-reported construction cost per sq ft, or the ICC Building Valuation Data Sheet (Building Safety Journal, updated biannually); residential structures valued per the IRC. A 1% Utah State surcharge (per UCA § 58-54-9-3, as amended) applies to all permits in addition to these fees. |
| Plan Review Fee (residential) | 65% of the Building Permit Fee | Coalville City Fee Schedule, 'BUILDING PERMIT FEES' section, item 3(c): 'Residential Structures: 65% of building permit fee.' (Detached garages with no living space, decks/porches for existing… Show full citationHideCoalville City Fee Schedule, 'BUILDING PERMIT FEES' section, item 3(c): 'Residential Structures: 65% of building permit fee.' (Detached garages with no living space, decks/porches for existing structures, and accessory buildings are charged a reduced 15% plan-review rate per item 3(d).) |
Plumbing Permit
VerifiedRequired for plumbing installations and alterations in Coalville. Fee is a $10 issuance charge plus a per-square-foot system fee, per the city's official fee schedule.
Verified 2026-07-08 · Source
Requirements
- New plumbing fixture installations or system work regulated by the statewide-adopted IRC (residential) or IPC (commercial)
- Water heater installation or replacement
- Water line, sewer line, or gas line installation or modification
Required documents
- RequiredCoalville City Building Permit ApplicationSame application form used for all Coalville permit types, includes a Plumbing fee line item.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Plumbing Permit Fee (residential) | $10 issuance fee plus $0.035 per square foot | Coalville City Fee Schedule (Resolution 2025-1), 'BUILDING PERMIT FEES' section, item 4: 'Permit Issuance Fee: $10' plus (System Fee, does not include issuance fee) 'iii. Residential Structures per the IRC: $0.035 per square foot.' |
Mechanical / HVAC Permit
VerifiedRequired for HVAC installations, replacements, and ductwork modifications in Coalville. Fee is a $10 issuance charge plus a per-square-foot system fee, per the city's official fee schedule.
Verified 2026-07-08 · Source
Requirements
- Furnace, boiler, or air conditioning installation or replacement regulated by the statewide-adopted IRC (residential) or IMC (commercial)
- Ductwork installation or major modification
Required documents
- RequiredCoalville City Building Permit ApplicationSame application form used for all Coalville permit types, includes an HVAC fee line item.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Mechanical Permit Fee (residential) | $10 issuance fee plus $0.035 per square foot | Coalville City Fee Schedule (Resolution 2025-1), 'BUILDING PERMIT FEES' section, item 5: 'Permit Issuance Fee: $10, plus $0.035 per square foot' with System Fee 'iii. Residential Structures per the IRC: $0.035 per square foot plus $10.' |
Electrical Permit
VerifiedRequired for electrical work in Coalville, including service upgrades. Fee is a $10 issuance charge plus a per-square-foot system fee, per the city's official fee schedule. EV charger/EVSE installation is electrical work and falls under this general Electrical Permit; the Fee Schedule (Resolution 2025-1) does not publish an EV-specific line item — a charger circuit would be billed under the same $10 issuance fee plus per-square-foot/service-upgrade structure as other electrical work.
Verified 2026-07-08 · Source
Requirements
- New electrical circuits, wiring installations, or service upgrades regulated by the statewide-adopted NEC
- Electrical panel or service entrance changes
Required documents
- RequiredCoalville City Building Permit ApplicationSame application form used for all Coalville permit types, includes an Electrical fee line item.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Electrical Permit Fee (residential) | $10 issuance fee plus $0.035 per square foot | Coalville City Fee Schedule (Resolution 2025-1), 'BUILDING PERMIT FEES' section, item 6: 'Permit Issuance Fee: $10' plus (System Fee, does not include issuance fee) 'iii. Residential Structures per the IRC: $0.035 per square foot plus $10.' |
Solar / Alternative Energy Permit
VerifiedRequired for residential rooftop solar photovoltaic and other alternative energy installations (geothermal, solar hot water, wind generator) in Coalville. Fees are separate from new-construction permits and based on 50% of the actual permit cost, with flat minimums by system type.
Verified 2026-07-08 · Source
Requirements
- Alternative Energy Permits are issued separately from permits for new construction
- Applies to solar hot water, photovoltaic, geothermal, and wind-generated power systems
Required documents
- RequiredCoalville City Building Permit ApplicationSame application form used for all Coalville permit types.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Photovoltaic System Fee | $350 | Coalville City Fee Schedule (Resolution 2025-1), 'BUILDING PERMIT FEES' section, item 7(a): 'Photovoltaic System: $350.' Alternative Energy Permits are based on 50% of the actual permit cost per item 7's lead-in text; Show full citationHideCoalville City Fee Schedule (Resolution 2025-1), 'BUILDING PERMIT FEES' section, item 7(a): 'Photovoltaic System: $350.' Alternative Energy Permits are based on 50% of the actual permit cost per item 7's lead-in text; Permit Issuance is an additional 10% of the review fee per item 7(e). |
| Geo-Thermal System Fee | $250 | Coalville City Fee Schedule (Resolution 2025-1), item 7(b): 'Geo-Thermal: $250.' |
| Solar Hot Water System Fee | $125 | Coalville City Fee Schedule (Resolution 2025-1), item 7(c): 'Solar Hot Water: $125.' |
| Wind Generator System Fee | $125 | Coalville City Fee Schedule (Resolution 2025-1), item 7(d): 'Wind Generator: $125.' |
Demolition Permit
VerifiedRequired for demolition of existing structures in Coalville. Flat fee per the city's official fee schedule; a separate state notification form is also required.
Verified 2026-07-08 · Source
Requirements
- Demolition of any building or structure within Coalville City limits
- State of Utah Demolition Notification Form required in addition to the city permit
Required documents
- RequiredDemolition Permit (Coalville City)City-specific demolition permit application, listed on the Building Department's Forms page.
- RequiredDemolition Notification Form - State of UtahState-level demolition notification form required in addition to the city permit, listed on the Building Department's Forms page.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Demolition Permit Fee | $400 | Coalville City Fee Schedule (Resolution 2025-1), 'BUILDING PERMIT FEES' section, item 9: 'Demolition Permit: $400.' |
Commercial Building Permit
VerifiedRequired for new commercial construction in Coalville, regulated by the statewide-adopted 2024 IBC (Utah Code § 15A-2-103(1)(a), effective 2026-07-01). Building Valuation is per the IBC occupancy/construction type (ICC Building Valuation Data Sheet) or actual contractor-reported cost, whichever is higher, run through the same valuation-based Building Permit Fee table used for residential structures (Resolution 2025-1). Plan Review is billed at 65% of the Building Permit Fee, the same rate applied to residential structures.
Verified 2026-07-19 · Source
Requirements
- New commercial construction regulated by the statewide-adopted 2024 IBC
- Planning and Zoning, Public Works, and North Summit Fire District sign-offs obtained prior to building permit issuance
- Scaled site plan (minimum 1" = 20') showing property lines, easements, rights of way, setbacks, driveway dimensions/paving, water/sewer tie-ins, grading, and structure height — per Coalville's Building Permit Application Review Procedures, which explicitly states 'new residential or commercial construction plans cannot be hand drawn'
- Three complete sets of legible plans (two physical sets min. 18"x24", one electronic set emailed to cityhall@coalvillecity.org), including a Building Code Analysis cover page listing occupancy, building type, square footage, structure height, and fire suppression/fire-resistance ratings where required, structural plans, elevations, floor plans, footing/foundation drawings, roofing/truss layout, electrical layout, plumbing plan, and mechanical heat-loss (Manual J/D) calculations, stamped and signed by the engineer or architect of record
Required documents
- RequiredCoalville City Building Permit ApplicationOfficial two-sided application form listing owner/contractor/subcontractor information, project valuation, and a fee breakdown line (Building Fee, Plan Review, Electrical, Plumbing, HVAC, Water, Sewer, Demolition, State 1% surcharge) with Zoning, Public Works, Building, and North Summit Fire District approval sign-off blocks; used for both residential and commercial permit types.
- RequiredBuilding Permit Application Review ProceduresOfficial Coalville City checklist detailing plan submittal requirements for both residential and commercial construction: site plan, application completeness, three plan sets, code-analysis cover page, structural/elevation/floor plans, footing/foundation details, roofing/truss layout, electrical/plumbing/mechanical plans.
- RequiredEngineering Standards and Construction SpecificationsCoalville City's published engineering design and construction specification standards, referenced for infrastructure and site work associated with new commercial construction.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee (valuation-based, Resolution 2025-1, effective 05/27/2025) | Less than $2,000: $24 for the first $500 plus $3.50 per additional $100 (or fraction) to $2,000. $2,001–$25,000: $76.50 for the first $2,000 plus $16.50 per additional $1,000 (or fraction) to $25,000. $25,001–$50,000: $456 for the first $25,000 plus $10.10 per additional $1,000. $50,001–$100,000: $756 for the first $50,000 plus $8.50 per additional $1,000. $100,001–$500,000: $1,181 for the first $100,000 plus $6.50 per additional $1,000. $500,001–$1,000,000: $3,781 for the first $500,000 plus $5.50 per additional $1,000. $1,000,001 and up: $6,531 for the first $1,000,000 plus $4.50 per additional $1,000. | Coalville City Fee Schedule (Resolution 2025-1, effective 05/27/2025), 'BUILDING PERMIT FEES' section, item 2: 'Building Permit Fees ... Show full citationHideCoalville City Fee Schedule (Resolution 2025-1, effective 05/27/2025), 'BUILDING PERMIT FEES' section, item 2: 'Building Permit Fees ... b. Non-Agricultural: i. Commercial structures built per the IBC ... Fees in accordance with Coalville City Building Permit Fees' — this is the same valuation-based fee table used for residential structures (item 2's table is not split by structure type). Building Valuation (item 1(b)(i)) for commercial structures is 'per the International Building Code (IBC)' — the higher of actual contractor-reported construction cost, or the ICC Building Valuation Data Sheet (Building Safety Journal, updated biannually) rate for the applicable occupancy/construction type. A 1% Utah State surcharge (UCA § 58-54-9-3, as amended) applies to all permits in addition to these fees. |
| Plan Review Fee (commercial) | 65% of the Building Permit Fee | Coalville City Fee Schedule, 'BUILDING PERMIT FEES' section, item 3(b): 'Commercial Structures: 65% of building permit fee.' Identical rate to residential structures (item 3(c)); Show full citationHideCoalville City Fee Schedule, 'BUILDING PERMIT FEES' section, item 3(b): 'Commercial Structures: 65% of building permit fee.' Identical rate to residential structures (item 3(c)); the reduced 15% rate under item 3(d) applies only to detached garages with no living space, decks/porches for existing structures, and accessory buildings — not general commercial construction. |
Commercial Tenant Improvement / Tenant Finish Permit
Required for interior remodel and tenant-finish work in existing commercial structures in Coalville, regulated by the statewide-adopted 2024 IBC. Coalville's Fee Schedule (Resolution 2025-1) does not publish a dedicated 'Tenant Improvement' line item or a TI-specific submittal checklist; the only applicable valuation provision is item 1(c), 'Remodels and Basement finishes: Valuation based on 50% of sq. ft. values from above,' applied to the commercial (IBC) per-square-foot rate and then run through the same Building Permit Fee table used for new construction, with Plan Review billed at the standard 65% commercial rate.
Reviewed 2026-07-19 · Source
Requirements
- Interior remodel or tenant-finish work in an existing commercial structure, regulated by the statewide-adopted 2024 IBC
- Planning and Zoning, Public Works, and North Summit Fire District sign-offs obtained prior to building permit issuance, per Coalville's general permit sign-off requirement (no TI-specific exemption from this requirement is published)
- Coalville's only published plan-submittal checklist (Building Permit Application Review Procedures) is written for new residential/commercial construction generally and is not scoped down for interior-only tenant-finish work; applicants should confirm with the Building Official (435-640-1799) which elements (e.g., full site plan) can be waived for interior-only scope
Required documents
- RequiredCoalville City Building Permit ApplicationSame application form used for all Coalville permit types, including a fee breakdown line and Zoning/Public Works/Building/Fire District sign-off blocks.
- OptionalBuilding Permit Application Review ProceduresCoalville City's only published plan-submittal checklist; written for new construction generally and not scoped specifically to interior tenant-improvement work — no separate TI checklist is published.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Valuation (Remodel/Tenant Finish, Resolution 2025-1) | 50% of the applicable per-square-foot commercial (IBC) valuation rate | Coalville City Fee Schedule (Resolution 2025-1), 'BUILDING PERMIT FEES' section, item 1(c): 'Remodels and Basement finishes: Valuation based on 50% of sq. Show full citationHideCoalville City Fee Schedule (Resolution 2025-1), 'BUILDING PERMIT FEES' section, item 1(c): 'Remodels and Basement finishes: Valuation based on 50% of sq. ft. values from above.' The Fee Schedule does not separately label this provision as applying to 'Tenant Improvement' work by name, and does not distinguish residential-remodel from commercial-remodel/TI within item 1(c) — it is the only published valuation basis for interior commercial remodel/tenant-finish work found in the schedule. |
| Building Permit Fee (valuation-based, Resolution 2025-1) | Same valuation-based table as new construction (see commercial-building-permit entry): e.g. $1,181 for the first $100,000 of valuation plus $6.50 per additional $1,000, to $500,000. | Coalville City Fee Schedule, item 2 table — the resulting 50%-of-rate remodel valuation (item 1(c)) is run through this same table; no separate reduced-fee table exists for remodels/TI. |
| Plan Review Fee (commercial remodel/TI) | 65% of the Building Permit Fee | Coalville City Fee Schedule, item 3(b): 'Commercial Structures: 65% of building permit fee.' No reduced plan-review rate applies to general commercial remodels/tenant improvements — the 15% reduced… Show full citationHideCoalville City Fee Schedule, item 3(b): 'Commercial Structures: 65% of building permit fee.' No reduced plan-review rate applies to general commercial remodels/tenant improvements — the 15% reduced rate under item 3(d) is limited to detached garages with no living space, decks/porches for existing structures, and accessory buildings. |
Sources & verification
Verified against official sources. Last reviewed 2026-07-08.
Fee schedules
Applications & forms
Codes & ordinances
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Coalville building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.