Skip to main content
PermitBase

Coalville building permits

Verified

Department contacts, adopted codes, permit types, fees, and gotchas for Coalville, Utah.

Last verified 2026-07-08 · Source · Embed this page’s badge · Version history

Building department

Address
10 North Main Street, P.O. Box 188, Coalville, UT 84017
Phone
(435) 336-5981
Office hours
Monday - Thursday 8:00 AM - 5:00 PM

Inspection guide

See how inspections work in Coalville — sequence, scheduling & re-inspection fees.

Codes adopted

Utah adopts construction codes statewide under Utah Code Title 15A (State Construction and Fire Codes Act), enforced by every jurisdiction. Chapter 4 of Title 15A codifies Legislature-enacted amendments for specific named jurisdictions (e.g., Park City, Salt Lake City, Sandy City) as part of the state construction code. Through June 30, 2026, the editions in force under Utah Code § 15A-2-103 are the 2021 IBC (with Appendices C and J), 2021 IRC, 2021 IPC, 2021 IMC, 2021 IFGC, 2021 IECC, 2021 IEBC, and 2021 ISPSC (residential provisions), together with the 2023 NEC. Effective July 1, 2026, § 15A-2-103 adopts the 2024 editions of the IBC, IPC, IMC, IFGC, IECC, IEBC, and ISPSC; the IRC remains the 2021 edition and the NEC remains the 2023 edition. Note: residential energy requirements are modified by statewide amendments, and several Utah jurisdictions document their residential energy provisions at the 2015 IECC level rather than the adopted IECC year — confirm the applicable residential energy code with your local jurisdiction. Always confirm the edition in force with your local jurisdiction.

  • 2024 International Building Code (IBC) — current statewide-adopted edition per Utah Code § 15A-2-103(1)(a) (Utah Uniform Building Standard Act), effective 2026-07-01, superseded the 2021 edition (which was itself effective July 1, 2023). Coalville's Building Permit Fees resolution (Res. 2025-1) references the IBC directly for commercial structures and does not codify a separate local building-code chapter, consistent with the statewide adoption model.
  • 2021 International Residential Code (IRC) — current statewide-adopted edition per Utah Code § 15A-2-103(1)(b); unaffected by the 7/1/2026 statute revision, continues in force. Coalville's Fee Schedule (Res. 2025-1, Building Permit Fees section) references the IRC directly for residential structures.
  • 2024 International Plumbing Code (IPC) — current statewide-adopted edition per Utah Code § 15A-2-103(1)(d), effective 2026-07-01, superseded the 2021 edition. Coalville's Fee Schedule references the IPC for commercial plumbing permit fee calculation.
  • 2024 International Mechanical Code (IMC) — current statewide-adopted edition per Utah Code § 15A-2-103(1)(e), effective 2026-07-01, superseded the 2021 edition. Coalville's Fee Schedule references the IMC for commercial mechanical permit fee calculation.
  • 2023 National Electrical Code (NEC) — current statewide-adopted edition per Utah Code § 15A-2-103(1)(g); unaffected by the 7/1/2026 statute revision, continues in force. Coalville's Fee Schedule references the NEC for commercial electrical permit fee calculation.
  • 2024 International Energy Conservation Code (IECC) with Utah amendments — current statewide-adopted edition per Utah Code § 15A-2-103(1)(h), effective 2026-07-01, superseded the 2021 edition.
  • NOTE: Effective July 1, 2026 (now in force), the 2024 editions of IBC, IPC, IMC, and IECC replaced the 2021 editions statewide per Utah Code § 15A-2-103 (version effective 7/1/2026, superseded 1/1/2027; text independently re-verified live at le.utah.gov 2026-07-16). The 2021 IRC and 2023 NEC were unaffected and remain in force. This file's codesAdopted list does not carry separate line items for the International Fuel Gas Code, International Existing Building Code, or International Swimming Pool and Spa Code (residential provisions) — all three are also statewide-adopted per Utah Code § 15A-2-103(1)(f)/(i)/(n) at the 2024 edition effective 2026-07-01, but no Coalville-specific citation for them was located this session; this is a pre-existing completeness gap in this file, not addressed further here.

Permit types & fees

New residential construction activity

New privately-owned residential construction only

Housing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).

Latest month (2026-05)
8units

8 buildings · $3M valuation

Trailing 12 months
23units

12 of 12 months reported · #78 in Utah coverage by units

Year to date (2026 YTD through 2026-05)
12units

9 buildings · $4M valuation

5 month(s) reported to Census

Full year 2025
13units

6 buildings · $4.7M valuation

Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-05 vintage. Census survey data — separate from the permit-requirements verification above. All Utah building activity

Tips & gotchas

  • Coalville City Building Department is open Monday–Thursday only, 8:00 AM–5:00 PM (closed Fridays) — verify before making an in-person trip.
  • Coalville is an independent municipal building department (Building Official Greg White, 435-640-1799) — it is NOT contracted to Summit County's building department; Summit County's own building division (summitcountyutah.gov/262/Building) serves unincorporated Summit County and other towns, not Coalville.
  • All Coalville permit fees carry an additional 1% Utah State surcharge per Utah Code § 58-54-9-3.
  • Coalville's trade permits (plumbing, mechanical, electrical) use a flat $10 issuance fee plus a uniform $0.035/sq ft system fee — a simpler, smaller-jurisdiction fee structure than the flat-dollar trade fees seen in larger Wasatch Front cities like Murray.
  • Building valuation is the HIGHER of actual contractor-reported construction cost, or the ICC Building Valuation Data Sheet rate (published biannually in the Building Safety Journal) — plus city-specific per-square-foot minimums for garages ($66.48/sq ft), decks ($15/sq ft), and agricultural buildings ($20/sq ft); remodels/basement finishes are valued at 50% of the applicable new-construction sq ft rate.
  • Plan review is billed at 65% of the Building Permit Fee for standard residential/commercial structures, but only 15% for detached garages with no living space, decks/porches on existing structures, and accessory buildings.
  • No Coalville-specific published plan-review turnaround time was located in official sources as of 2026-07-08. The residential-building-permit type applies the Utah Code § 10-20-909 statutory floor (14 business days review + 3 business days completeness screening = 17 business days total) since that is a real, citable statewide floor scoped to one/two-family dwelling and townhome permits; all other permit types are honestly left null with a reviewTimelineNote rather than estimated.
  • Permits become null and void if work is not commenced within 180 days of issuance, or if construction is suspended/abandoned for 180 days at any point, per the official Building Permit Application form.
  • A minimum 24-hour notice is required for all inspection requests, scheduled via the Building Department's main line (435-336-5981).

Comparable nearby cities

Park City
Both in Summit County11 shared permit types~18 mi away
Compare fees →
Salt Lake City
12 shared permit types~28 mi away
Compare fees →
Layton
12 shared permit types~30 mi away
Compare fees →