Commercial Building Permit in Coalville, Utah
Required for new commercial construction in Coalville, regulated by the statewide-adopted 2024 IBC (Utah Code § 15A-2-103(1)(a), effective 2026-07-01). Building Valuation is per the IBC occupancy/construction type (ICC Building Valuation Data Sheet) or actual contractor-reported cost, whichever is higher, run through the same valuation-based Building Permit Fee table used for residential structures (Resolution 2025-1). Plan Review is billed at 65% of the Building Permit Fee, the same rate applied to residential structures.
Verified 2026-07-19 · Source
When you need this permit
- New commercial construction regulated by the statewide-adopted 2024 IBC
- Planning and Zoning, Public Works, and North Summit Fire District sign-offs obtained prior to building permit issuance
- Scaled site plan (minimum 1" = 20') showing property lines, easements, rights of way, setbacks, driveway dimensions/paving, water/sewer tie-ins, grading, and structure height — per Coalville's Building Permit Application Review Procedures, which explicitly states 'new residential or commercial construction plans cannot be hand drawn'
- Three complete sets of legible plans (two physical sets min. 18"x24", one electronic set emailed to cityhall@coalvillecity.org), including a Building Code Analysis cover page listing occupancy, building type, square footage, structure height, and fire suppression/fire-resistance ratings where required, structural plans, elevations, floor plans, footing/foundation drawings, roofing/truss layout, electrical layout, plumbing plan, and mechanical heat-loss (Manual J/D) calculations, stamped and signed by the engineer or architect of record
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 3 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Coalville City Fee Schedule (Resolution 2025-1, effective 05/27/2025), 'BUILDING PERMIT FEES' section, item 2: 'Building Permit Fees... Show full citationHide
Coalville City Fee Schedule (Resolution 2025-1, effective 05/27/2025), 'BUILDING PERMIT FEES' section, item 2: 'Building Permit Fees... b. Non-Agricultural: i. Commercial structures built per the IBC... Fees in accordance with Coalville City Building Permit Fees' — this is the same valuation-based fee table used for residential structures (item 2's table is not split by structure type). Building Valuation (item 1(b)(i)) for commercial structures is 'per the International Building Code (IBC)' — the higher of actual contractor-reported construction cost, or the ICC Building Valuation Data Sheet (Building Safety Journal, updated biannually) rate for the applicable occupancy/construction type. A 1% Utah State surcharge (UCA § 58-54-9-3, as amended) applies to all permits in addition to these fees.Coalville City Fee Schedule, 'BUILDING PERMIT FEES' section, item 3(b): 'Commercial Structures: 65% of building permit fee.' Identical rate to residential structures (item 3(c)); Show full citationHide
Coalville City Fee Schedule, 'BUILDING PERMIT FEES' section, item 3(b): 'Commercial Structures: 65% of building permit fee.' Identical rate to residential structures (item 3(c)); the reduced 15% rate under item 3(d) applies only to detached garages with no living space, decks/porches for existing structures, and accessory buildings — not general commercial construction.Review timeline
Inspection process
- 1
Footing/Foundation
Required inspection of footing and foundation work prior to backfill, per standard IBC inspection sequencing referenced in Coalville's Building Permit Application Review Procedures. Schedule with the Building Official (Greg White, 435-640-1799) with a minimum 24-hour notice, per the Building Permit Application form.
- 2
Framing
Framing and rough electrical/plumbing/mechanical inspection prior to insulation and drywall. Minimum 24-hour notice required for scheduling, per the Building Permit Application form.
- 3
Final Building Inspection
Final inspection by the Building Official, coordinated with Public Works and North Summit Fire District sign-offs (both listed as approval blocks on the Building Permit Application form), required prior to occupancy.
See the full Coalville inspection guide — scheduling & re-inspection fees →
Tips
- Coalville's Building Permit Application Review Procedures document applies the same plan-submittal checklist to both residential and commercial construction, explicitly stating 'new residential or commercial construction plans cannot be hand drawn' — there is no separate, shorter commercial-only checklist published.
- Plan review for commercial structures is billed at the same 65% rate as residential structures (Fee Schedule item 3(b)/(c)) — Coalville does not use a lower commercial plan-review rate the way some larger Wasatch Front cities do.
- Building valuation for commercial structures is the higher of actual contractor-reported construction cost, or the ICC Building Valuation Data Sheet rate for the applicable IBC occupancy/construction type (published biannually in the Building Safety Journal).
- A 1% Utah State surcharge applies to all building permits per Utah Code § 58-54-9-3, in addition to Coalville's own fee schedule.
- Coalville is an independent municipal building department (Building Official Greg White, 435-640-1799) — it is not contracted to Summit County's building department.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-19.
Fee schedules
Applications & forms
Codes & ordinances
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Coalville building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
This one’s complicated · Get an expediter
Tell us about your project and we’ll connect you with a permit expediter who works in Coalville.
PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.
Coalville's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Coalville yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Coalville lands. Privacy.
Other permits in Coalville
Commercial Building Permit in other cities
Compare commercial building permit fees across Utah →
Look up this fee in a different city →
Now live
Build your Coalville project checklist
Describe your project once and get every permit, document, and fee it triggers in Coalville — in one checklist. Free, for any city and any number of projects.
Get started →